Friday, October 21, 2011

Like Washington And Jefferson Only Better

The Durham Report
This is the seventh in a series of posts about William Lyon Mackenzie, Robert Baldwin and the birth of Canadian democracy. Part one here. Part two here. Part three here. Part four here. Part five here. Part six here.

So where was I? Right, the Durham Report! After the rebellions, sick of all the turmoil in Canada, the British had sent Radical Jack Durham here as Governor General to see what could be done. By the time he returned to England a few months later, he'd been convinced by Canadian liberals like Robert Baldwin and his father William Warren Baldwin that we should have Responsible Government. Democracy. Power over own own affairs. But the British Prime Minister thought it was a crazy idea. "A logical absurdity," he called it. 

There was, however, one thing about the Durham Report that the British government did like: the racism.

Durham thought French people sucked — French Canadians included. In his report, he famously claimed that Canada was really "two nations warring within the bosom of a single state". So in addition to the whole Responsible Government thing, Radical Jack suggested that the British should try to stamp out the French influence in Canada. He recommended an overwhelming flood of English-speaking immigrants. That Francophone rights should be limited. That some of them should be taken away entirely. And that Lower Canada (Québec) should be forced to join with Upper Canada (Ontario) so that anglophones could out-vote francophones on everything. 

The British might have thought the democracy part of the Durham Report was ridiculous, but they were all over this anti-French stuff. In 1840, they passed the Act Of Union. This was a big deal. Upper and Lower Canada were combined as the Province Of Canada and renamed Canada West and Canada East. Both new provinces were given the exact same number of seats in the legislature — even though there were waaaay more people in Québec. The French were getting screwed. And it didn't stop there.

New provinces meant new elections. And the British weren't about to let French Canadians just go ahead and vote. Not without making it as difficult as humanly possible. Polls were set up in English neighbourhoods instead of French ones. Sometimes they were in completely different towns. And when francophone voters travelled those long distances in order to cast their vote, they found organized mobs of violent Tory anglophones waiting for them. If violence broke out, the army was ready to step in to protect the people who spoke English and voted conservative. A lot of people would get beaten up during this election. Eight people would die.

One of those screwed-over francophones was Louis-Hippolyte LaFontaine. LaFontaine was born just outside Montreal and grew up to become one of the leading voices in the Parti Patriote, the left-leaning, democracy-loving party in Lower Canada. (He was also a dead ringer for Napoleon — they say even Napoleon's own guardsmen once mistook him for a taller reincarnation of the diminutive dictator.) But he wasn't as radical as some of the other big name Québecois reformers. He hadn't supported the violence of the rebellions — arguing instead in favour of passive resistance and the boycotting of British goods. And while that didn't stop the Tories from driving him into exile and then throwing him in jail for a while — without a warrant or any proper charges — he was eventually released. Since the more radical Patriotes were still in prison or in exile or hanged, the job of leading the party in the new elections was left to him.

Louis-Hippolyte LaFontaine
But not even LaFontaine was going to be allowed to vote. His poll was on the far side of his riding, in a town called New Glasgow — not exactly the most francophone place in the province. When LaFontaine and hundreds of his supporters marched the ten kilometers across his riding to record their votes, one of those angry mobs of Tory anglophones was there to block the way. Some of the reformers carried clubs for protection. Some of the Tories had rifles. On the walk over, there were skirmishes. Blood in the snow. And at New Glasgow it became obvious: if LaFontaine and his supporters wanted to vote, they were going to have to fight their way through.

This, they say, was one of the defining moments in the history of our country. Electoral violence was the norm back in those days. People used to hire gangs of thugs to clear the way through the mobs in order to record their votes. And LaFontaine had hundreds of men at his side ready to do just that. But he hadn't supported violence before the rebellions and he sure as hell didn't believe in it now. He chose not to fight. Instead, he calmed his supporters down and they left without any further bloodshed, avoiding what would have been, in his words, "a massacre". Unwilling to kill for it, LaFontaine lost his seat. One of the most important supporters of Responsible Government had no voice in the new legislature.

That's when Robert Baldwin came up with a plan.

See, in those days, you were weirdly allowed to run in two ridings at the same time. It was apparently supposed to be an insurance policy for party leaders, just in case they happened to lose one. If you won both of the ridings, you could pick the one you wanted to represent; there was a by-election in the other one. And in that election, Robert Baldwin had ended up with two seats in Upper Canada. The plan was for his father, William Warren Baldwin, to run in the by-election in the extra riding, which was just north of Toronto. It had a strong base of Reform supporters — having been held by William Lyon Mackenzie back before the Baldwins ran there. But Robert Baldwin had an idea. He wrote to his father and asked him to stand aside so that LaFontaine could run there instead. His father agreed. A francophone was going to try to win an election in rural, Protestant, anglophone Ontario.

To prepare, LaFontaine moved to Toronto, into the Baldwins' house on Front Street (on the north-east corner of Bay, diagonally across from where Union Station is now). Before long, he was like a member of the family. Together, he and William Warren travelled the riding giving speeches. They argued for Responsible Government. For democracy. Against the old European idea that loyalty should mean loyalty to your race, your religion, and your Crown. The Tories and our British overlords were still fighting for that belief, but Baldwin and LaFontaine argued that our ultimate loyalty should be to be to the greater good — to our fellow human beings regardless of what language they spoke or what god they worshiped. They believed that whether you spoke English or French, you were first and foremost Canadian. And that we were all going to have to work together in order to win our freedom, our democracy and our nation away from one of the most powerful empires the world had ever seen

The voters agreed. LaFontaine won in a landslide. And Baldwin insisted that his new BFF become the leader of the new government. LaFontaine's official title would be Premier of Canada. But people called him Prime Minister.

Together, the two men set to work. The march toward democracy would be a slow one. They spent much of the next eight years building the trust between English- and French-speaking Canadians. The government was made bilingual. Baldwin sent his children to school in Québec City. Later, when the Tories pulled the same election mob bullshit with him that they had pulled with LaFontaine, Baldwin would run for election in Rimouski, in eastern Québec — and win.

Still, it wouldn't be easy. Canadian conservatives hated them — even burned Baldwin in effigy outside his home on Front Street. And in England, the liberal Whig party had just lost their election to the conservative British Tories, who hated the idea of Canadian democracy even more. When they sent a new Governor General to Canada, he had clear orders to ignore any demands for Responsible Government.

Robert Baldwin
Even worse, Robert Baldwin had begun a slow spiral into a severe, crippling depression.

He had always seemed a strange politician. He was quiet and reserved. An introvert. He mumbled his way through speeches. His skin was pale. His eyes were described as dull and expressionless. He was tall and stooped over.  They say he had "a funereal bearing". When he was young, he had fallen head over heels in love with his fifteen year-old cousin, Eliza, and their families — or, um, family — had been appalled. They sent her away for two years, but the young lovers waited and were married when she got back. For nine years, they lived a happy, love-filled life. But then Eliza died, slowwwly and painnnfully after childbirth. Baldwin was devastated. He became obsessed with her death. For the rest of his life, he carried her letters with him wherever he went. Every day, he would spend time alone in her room, which no one else was allowed to enter. Every year, around the anniversaries of their wedding and of her death, he could barely function, sorrowfully wandering the streets of Toronto, visiting the places they had shared special moments together, from their home on Front Street up to their estate, Spadina House, where she lay waiting for him in the family tomb. And now, just as Baldwin and LaFontaine were beginning to make progress, his father William Warren died too. Baldwin got worse. There were headaches. He was known to burst into tears in public. Soon, he was thinking about quitting politics altogether.

At the same time, LaFontaine was going through his own personal misery. William Warren's death had hit him hard too, but that was only the beginning. For years, he and his wife had longed for a child of their own but had never been able to conceive. They had been overjoyed when they finally adopted a daughter. But not long after William Warren died, she did too. So did LaFontaine's niece. The inflammatory rheumatism he had long been suffering from began acting up again. It kept him in bed with fevers and chest pains and excruciatingly swollen joints for weeks at a time. Sometimes months. At times, he said, he was surprised to still be alive.

But the two men carried on the fight. Even after they lost the next election. They dragged their tired bodies across the two provinces, meeting people, giving speeches, hand-writing letter after letter after letter. Baldwin outran an angry mob of club-wielding Orangemen one day; spent another being carried triumphantly through the streets of Rimouski. And it paid off. The election after that, in 1848, Baldwin and LaFontaine won a massive majority. The Tories were crushed. The time had finally come.

History remembers their government as The Great Ministry. In just a few short years, Baldwin and LaFontaine laid the groundwork for the Canada we know today. They brought in public education. An independent judiciary. Our jury system. A system for appeals. The made sure that everyone — not just the rich — had access to the courts. And that anyone — not just the rich friends of Tory politicians — could be appointed to  the civil service. They brought democracy to municipal governments. Opened our ports to ships from all over the world, instead of just British ones. They helped build our railways. Won amnesties for many of the rebels of 1837, including leaders like Wolfred Nelson and Louis-Joseph Papineau, who were finally allowed to come back home. And they took the religious King's College away from Bishop John Strachan and turned it into the secular University of Toronto.(Though they did, sadly, totally fuck up when it came to a woman's right to vote.) The impact these few years had on the history of Canada is hard to even imagine.

But none of that was as important as what they would pull off in the spring of 1849. That's when democracy finally came to Canada.

And I'll finally tell that part of the story in my next post.

-----

There are, I think, two more posts to go in this story of the birth of Canadian democracy, so I'll save some of my sources and added little tidbits for then. But a quick spoiler: though I hadn't read it until I'd written most of this post, John Ralston Saul's book on Baldwin and LaFontaine is absolutely freaking amazing and will have a deep influence on the rest of what I write about these guys. There are lots of copies of that book in the Toronto Public Library system and you can buy it right here. The fact that we don't all know this story by heart is absolutely dumbfounding. There's not even so much as a plaque at the site of Robert Baldwin's grave in St. James Cemetery. Or on the site of the house at Front & Bay. Yeesh.

I believe I shared this at the bottom of my last post, too, but you can read the full text of the Durham Report here.

Wednesday, October 19, 2011

Photo: The Old Old Mill in 1907


Here's a photo I like so much, it's on my wall at home. It's a photo of what the Old Mill looked like in 1907. It was originally built way back around 1793 as a sawmill on the banks of the Humber River, about the same time that the tiny town of York was first being carved out of the forest a good number of kilometers to the east. It was more than a century later, in 1914, that it was re-opened in its current incarnation as a hotel and tea room.

I came across the photo on Torontoist as part of an article by Kevin Plummer about Robert Home-Smith. He was a Conservative businessman/developer type person who opened the new Old Mill, and was also responsible for developing a lot of the neighbourhoods along the Humber River — as well as helping to ensure that it, unlike most of the rest of our waterways, would be lined with parkland. You can read that whole article here.

Sunday, October 16, 2011

William Faulkner Drunk In The Cockpit Of A Biplane

William Faulkner

William Faulkner liked to drink. A lot. There's an interview he did with the Paris Review — one of the few interviews he ever gave — where they asked him what he needed in order to be able to write. He answered paper, food, tobacco and whiskey. Emphasis on the whiskey. When big-deal director guy Howard Hawks asked him to write the screenplay for a movie called Road To Glory, Faulkner showed up to the script meeting with a brown paper bag under his arm. As they got down to work, he pulled a bottle of bourbon out of the bag and sliced his finger open trying to unscrew the cap. And as he bled all over the place, instead of, oh say, taking a break, he just dragged a wastepaper basket over to his chair so that he could bleed into it while he kept drinking. Yup. Dude was one badass alcoholic.

The reason Faulkner was into that kind of macho shit seems to have something to do with the fact that he grew up during the First World War. He was in high school in the States when the U.S. got involved, and his brother went off to fight in the trenches in France. Faulkner wanted to fight too, so he dropped out of school and tried to enlist in the army. But he wasn't a tall man, only about 5'5", so he was rejected. For a while, he kicked around, not quite sure what he'd do.

But then he ended up at a party where he met a Canadian officer who had an idea. He figured that Faulkner could sneak into the Royal Air Force by pretending to be British.

Now, it's probably safe to assume that Faulkner was pretty drunk at that party, but this kind of scheme was right up his alley anyway. He loved pranks. He and a friend used to get a kick out of sending famous poems into magazines and collecting the rejection slips. Notes from editors who were unimpressed with, say, "Kubla Khan", writing stuff like, "We like your poem, Mr. Coleridge, but we don't think it gets anywhere much." So Faulkner threw himself full-throttle into trying to learn how to pretend to be British. He worked with a tutor for weeks, turning his iconic Mississippi drawl into an English accent. He grew a moustache because he figured moustaches looked English. He changed the spelling of "Falkner" to "Faulkner" because he figured the letter "u" made his name look English. And he even invented a fictional English vicar he called Mr. Edward Twimberly-Thorndyke who, somehow, sent letters of recommendation from England to the British Consulate in New York City. So when Faulkner showed up in there with his English accent and his English moustache and his English letter "u", they signed him up right away. (Although, to be fair, the British had been fighting the war for three or four years at that point and they were pretty much taking anyone who wasn't already dead yet.)

U of T during WWI
And that's how William Faulkner ended up in Toronto. Our city had been taken over by the war. And by the Royal Air Force in particular. We'd already had the first airfield in Canada (in Etobicoke at Long Branch, down by the lake) and there were others all over the place: Leaside, Wilson and Avenue Road, the Exhibition... A big chunk of the University of Toronto was turned into an aeronautics school. Colleges were turned into the sleeping quarters for recruits. Tents were pitched on the lawns. Biplanes flew around all over the place. It was a pretty freaking great time for flying in Toronto. Our own Billy Bishop was the greatest fighter pilot in the world, facing off against the Red Baron and shooting down more Germans than anyone else. Amelia Earhart worked here as a nurse (at the military hospital at 1 Spadina Crescent, in the roundabout-y thing on Spadina just north of College) and was so inspired by all the flying she saw here that she decided to become a pilot herself.

It all must have seemed pretty badass to a guy like Faulkner, who soon arrived for training. This was only about 15 years after the Wright Brothers' first flight; you had to be pretty brave to get into one of those rickety biplanes on a good day, never mind when Germans were trying to shoot you out of the sky. The average lifespan for a pilot during the war was something like 11 days. Faulkner studied hard, became popular with the other recruits (he regaled them with limericks so dirty that even on the Internet every source I find says they're "unprintable"), and looked forward to the day he'd get to fight in Europe.

But that day never came. On November 11, 1918, while Faulkner was still in training, the war ended. Or as he put it: "The war quit on us before we could do anything about it." Toronto erupted into celebration. People poured into the streets. The mayor declared a spontaneous tickertape parade. Floats marched down King Street; people threw paper and (for some reason) talcum powder into the air. They parked a car on the lawn outside Queen's Park and drove over it with a tank in celebration. And at the Military Aeronautics School at U of T, they gave all the recruits the rest of the day off to go have fun.

Which for William Faulkner, of course, meant drinking.

University College, U of T, during WWI
...and flying. He packed the cockpit of a biplane full of bourbon, climbed in and took off. A lot of historians seem to think that it was the first time he had ever flown alone in his entire life. He started doing tricks. Sweeping 180 degree turns. The difficult Immelmann turn, so dangerous that the German ace it was named after, Max Immelmann, died while doing an Immelmann turn. And then, finally, a huge upside down loop which, according to Faulkner, would have been perfect. Except that right at the bottom a hanger got in the way.

Faulkner's plane smashed through the roof and got lodged in the rafters. For years afterward, the writer would walk with a limp. He'd have a crook in his nose for the rest of the life. But as he hung there upside down in the cockpit, Faulkner was unfazed. He just pulled out some more bourbon and kept drinking.

-----

I originally told this story at the Little Red Umbrella's Variety Spectacular at the Holy Oak Cafe. You can read the Paris Review interview here. And more about Faulkner's time in Toronto here and here and here. Years later, he would team up with Ernest Hemingway to work on the film adaptation of To Have And Have Not, which was the only time two Nobel Prize winners have worked on a movie together. Hemingway also lived here for a while. You can read the story about him that I told at the Little Red Umbrella Variety Spectacular hereAnd there are photos of the event here.

Tuesday, September 20, 2011

The Bloody Aftermath Of The Bloody Rebellion

Mackenzie's ship, Caroline, burns at Niagara Falls
This is the sixth in a series of posts about William Lyon Mackenzie and the birth of Canadian democracy. Part one here. Part two here. Part three here. Part four here. Part five here.

Okay so, as I was saying at the end of my last post, Mackenzie's rebellion was a complete disaster. And so was the one in Quebec. The rebels in both provinces were completely routed by the Tories. The entire left-wing in Canada was in disarray. Rebel leaders across the country had been arrested, a few hanged, others exiled to Australia. Many of the rest had fled to the United States.

That's where Mackenzie was. After the rebellion was crushed, he escaped to Buffalo with a price on his head. There, he gave a rousing speech to the biggest public meeting that city had ever seen, convincing hundreds of volunteers to follow him to Navy Island in the Niagara River. He declared it the Republic of Canada, with a new flag and everything. An American ship, the SS Caroline, started ferrying them weapons and ammunition. They were going to invade Upper Canada and take another shot at the revolution.

The U.S. President, Martin Van Buren, threatened them with arrest but didn't really take any action. So the Tories in Canada took things into their own hands. Thousands of them — including Samuel Jarvis and a big famous loyalist guy from Hamilton, Allan McNab — headed south with British troops. They crossed the border into the States, bombarded Navy Island, set the Caroline on fire and left the pieces to drift over Niagara Falls. An American on board was shot and killed. The U.S. government was outraged.

The British claimed the attack was made in self-defense but the Americans were hardly convinced. Van Buren's Secretary of State wrote a famous letter to the Brits: a preemptive strike, he argued, was only okay when the threat was immediate and overwhelming, when there was no other choice and no time left to decide. In the end, the British agreed. They apologized for the attack. And the set of guidelines that would laid out in that letter, the "Caroline test", became the internationally-recognized standard for the use of preemptive force. It still is — at least, for people who aren't George W. Bush or Tony Blair. When the Nazis went on trial at Nuremberg, the court used the exact same words.

After the burning of the Caroline, Mackenzie's Navy Island scheme fell apart. He ended up being arrested by the Americans and spent months in prison. After his release, with his health failing, he resigned himself to life in the United States. He even got his American citizenship. During the next decade, as the battle over Canadian democracy raged towards a climax, he'd be on the sidelines, living in New York State, publishing newspapers that attacked President Van Buren for being too close to the British.

Mackenzie's failed invasion wasn't the only one. In the months after the botched revolution, there were clashes along both sides of the border all the way into Quebec. And they weren't going well for the surviving rebels. In the wake of the rebellions, it kind of looked like Canadian democracy was screwed.

But here's the thing: the British were getting sick of dealing with this shit. It had been nearly 400 years since Queen Elizabeth sent the first English colonists to the New World. They had spent centuries invading the First Nations, nearly bankrupted themselves fighting the Spanish, and waged another massive war to conquer the French in Quebec. Tiny British outposts had grown into thriving metropolises, major economies funneling money back to England. But times had changed. Democracy was getting more and more popular. First, their own American colonists had gotten all pissy about taxation and risen up against them, driven them and their supporters out of the country. Then, it struck closer to home: right across the channel, French liberals who had been inspired by the Americans went batshit bloodthristy and beheaded their king.

Now, there was even unrest in Canada. Canada! Canada was supposed to be run by staunch loyalists, guys who had personally fought wars against the Americans in the name of the British Crown. Oh sure, Reformers like William Lyon Mackenzie had been demanding democracy for decades, delivering fiery speeches, writing scathing articles and even winning elections. But now it seemed they were willing to fight in the streets for it if they had to. 

And in England, the liberals were in power. As far as the Whig Party was concerned, the rebellions were the last straw. They already believed in democracy a hell of a lot more than the conservatives did — and trouble in the colonies wasn't going to win them any votes in the next election. It was time for things to change.

So they did. The Lieutenant Governor, Sir Francis Bond Head, was fired. The Whigs knew that hiring him had been a giant mistake. They thought he was a liberal reformer, but he turned out to be a super-conservative prick. He left Toronto a hated man. The surviving rebels put a $500 price on his head; he was forced to cancel his plans for a grand departure through Halifax and snuck out through the States instead. He went back to his life writing travel books in England. And when the Whigs named a new Governor General for the Canadas, they were going to be sure they didn't make the same mistake again. This time, they chose the most in-your-face liberal they could find: Lord Durham.

Lord Durham
Durham, they knew they could trust. Not only was he the son-in-law of the last Whig Prime Minister (Earl Grey, the guy the tea is named after), but just five years earlier he had helped lead the fight against the Tories during one of the most important political battles in British history — getting the Reform Act passed. He'd fought for public education. For better working conditions for miners. For the right of every man to vote, no matter his wealth. He was so left-leaning they called him "Radical Jack".  The Whigs were convinced he'd be perfect for the job.

Radical Jack was not so convinced. He didn't want to go to Canada. The new Prime Minister, Lord Melbourne (of having Melbourne named after him fame), couldn't talk him into it. But as luck would have it, there was somebody else who could: the brand new queen. Victoria was young and inexperienced, just 18 years old. She'd only been on the throne for a few months. But she had already made it perfectly clear: even if she was supposed to be neutral when it came to politics, she liked the Whig Party best. She was so close to Melbourne that Tories heckled her as "Mrs. Melbourne". And when Durham refused the post to Canada, she stepped in. Soon, Radical Jack was on a ship sailing for the Great White North. His Prime Minister told him he would have "free reign".

As it turned out, that was kind of bullshit. Melbourne screwed Durham on one of the very first things he tried to do. There were some jailed rebels who he knew would be sentenced to death if they ever went on trial — the judges tended to be the very same guys who had fought against them during the rebellions. So he ordered the prisoners exiled to Bermuda instead. The Canadian Tories were pissed. They denounced Durham as anti-democratic and nicknamed him "The Dictator". In the end, Lord Melbourne sided with them; he reversed Durham's decision from England. Canadian liberals burned Melbourne in effigy. Durham resigned in protest and sailed home, never to return. He'd gotten here in May and by the end of the fall, he was already gone.

But those few months were more than enough time for Radical Jack. His summer in Canada changed the course of our nation's history forever. The most radical Reformers — the ones who had supported the rebellions — might be dead, arrested or gone, but the more moderate liberals were still around. And Durham spent much of his time here talking to them, listening to their ideas about democracy and government and what they should mean for Canada.

There was one conversation in particular that people say was incredibly freaking important. It was with two of the most super insanely gigantically important Torontonians ever: William Warren Baldwin and his son Robert. Canadian historical figures do not get much bigger than this.

The Baldwins were among the very first people to ever to move to Toronto. William Warren Baldwin came here with his father all the way back around 1800, when the town of York was still just a few muddy blocks and a forbidding wilderness. He did well for himself: became a doctor and a lawyer; owned a bunch of land; got married. His son Robert was born in their house on Front Street, at Frederick, a couple of block east of the St. Lawrence Market. (Crazily, that very same house would later become William Lyon Mackenzie's print shop — the scene of the oh-so-important Types Riot.)

As York grew, the Baldwins took their place among the city's rich elite. On the hill above Davenport, right beside where Casa Loma is now, William built a grand house he called Spadina (from a native word for "sudden rise of land"). To be able to see the lake more clearly from his window, he had a road cut through the forest all the way down to the water. He called that road Spadina too. Baldwin Street, he named after himself. Phoebe Street, he named after his wife. He even helped to design the new law school: Osgoode Hall.

William Warren Baldwin
The Baldwin family was friends with some of the most powerful conservatives in the city. They were BFFs with Peter Russell, a corrupt, incompetent, racist, slave-owning asshole who ran Upper Canada for a while in York's earliest days. When he died, the Baldwins  inherited his crazy-rich estate and even moved into his old house, Russell Abbey, to take of his sister, who was losing her mind. And Peter Russell was far from the only conservative they had close ties to. When young Robert went to school, he was taught by John Strachan, the figurehead of the Family Compact. Just like all those Family Compact guys, William Warren Baldwin was a firm Protestant. And he was all about old school gentlemanly honour: when some dude mouthed off about him once, Baldwin challenged the guy to a duel. They met on the sandy strip of peninsula that is now the island. The other guy took it all back before Baldwin could shoot him.

But when it came to politics, the Baldwins and their Tory friends had pretty much nothing in common. By the time of the rebellion, both William Warren and Robert Baldwin had been leading figures in the Reform movement for years. They fought for minority rights. And for public education. And while they didn't support Mackenzie's violent revolution, they still firmly believed in the idea of Canadian democracy. When Durham asked them about it that fateful summer, they were very clear: the ultimate power in Canada should rest with the Canadian people, not with the British Governor General. Ministers in our government shouldn't be responsible to the British, but to our very own elected representatives in the legislature. To parliament. This is what they call Responsible Government.

Durham was convinced. When he got back home to England, he wrote one of the most important documents in all of Canadian history. It was officially titled "The Report on the Affairs of British North America", but we know it as the Durham Report. In it, he made his opinions pretty freaking clear. The current system, he said, was "defective... irresponsible government, an evil which no civilized community could bear. It was a question between a petty, corrupt, insolent Tory clique and the mass of the people." He openly called for Canadian democracy — for Responsible Government. The ideas the Baldwins had been fighting for were now being recommended to the British government by a British official specifically hired by the British government to give them recommendations. This was HUGE.

But the fight was far from over. When the Durham Report was released, Lord Melbourne screwed Radical Jack over yet again. He dismissed the idea of Responsible Government as "a logical absurdity". As far as he was concerned, Canada wasn't going to be getting real democracy any time soon.

The very next summer, Lord Durham died of tuberculosis. Fifty thousand people attended his funeral. His last words were saved for the country he hadn't even wanted to come to. "Canada," he said, "will one day do justice to my memory."

He was right. But it was going to take another ten years before we won the battle for control over our own affairs. And with Mackenzie exiled in the States, it was up to Robert Baldwin to lead the charge.

The next post in this series about William Lyon Mackenzie (and Robert Baldwin) and the birth of Canadian democracy is coming soon. I now have no idea how many there will be... they just keep going... and going... but we're getting there. Promise. And you're going to want to keep reading; Robert Baldwin is probably my favourite figure in the history of the city.

-----

Some interesting tidbits related to all of this. William Warren Baldwin, Robert Baldwin and Peter Russell all share the same headstone at the Baldwin family tomb in St. James Cemetery. Lord Durham had one of the first recording cases of synesthesia on his trip, a condition some people have where some sense get mixed up with other ones (like seeing letters and numbers as particular colours, which I have). And when Baldwin laid out Spadina Avenue, he included the roundabout island thingy that is still there, just north of College.

There's a chronology of the aftermath of the rebellions here. You can read the full text of the Durham Report here. You can read a bit about Tories rioting against Durham here.


This post is related to dream
10 The Battle of Montgomery's Tavern
William Lyon Mackenzie, 1837

Friday, September 2, 2011

Photo: Ass-Grabbing At The Ex

I'm thinking this photo kind of speaks for itself. I found it over at The National Post, posted with an article about sex at the CNE. You can read the whole thing right on over here. (It's got more photos, too, including one of the old "Striporama" exhibit. Wait, what?)

Thursday, September 1, 2011

The Very First Ride At The CNE

The CNE's first ride, 1892ish
It all started back in the mid-1800s, as a relatively small provincial fair. They held it in a field out behind Upper Canada College, which in those days was on King Street (on the northwest corner of Simcoe, across from where Roy Thompson Hall is now). It was a very agricultural affair. They had cows and sheep and horses and blankets and knitting and needlework. The cheese was very popular. So was the wax fruit. The day ended with a big dinner at the Lieutenant Governor's residence across the street. The city's bigwigs were all there; they declared it a success.

For the next few decades, the fair toured around the province, moving from one city to another each year.  Mostly, it came here and to Kingston and London and Hamilton. And as it grew, we started putting up permanent buildings for it. A Crystal Palace was the first to go up. And we set aside some land for it, too, part of the old Garrison military reserve that the government had held on to ever since our city was founded. A century and a half later, the Ex is still held on that same ground.

It wasn't until 1879, though, that we decided to have the fair here every year. And that we'd call it the Canadian National Exhibition. The CNE was officially born. By then, the fair was a huge freaking deal. There were 23 permanent buildings on the site. Thousands of exhibits. It drew more than 100,000 visitors that first year. 

Now, no one, it seems, is quite sure exactly when the CNE's first ride opened. It might have been that year, or, at the very least, soon after. It was a tiny little Ferris Wheel. Just 15 feet high. It had four buckets; they could hold two people each. And the whole thing had to be powered by hand. It was such an early prototype that people didn't even call them Ferris Wheels yet. That didn't happen until about a year after this photo was taken, when George Ferris Jr. unveiled his enormous creation at the Chicago World's Fair. Tens of thousands of pounds of iron and steel. Enough room for more than two thousand people. All powered by steam engines. The world of amusement park rides had changed forever. And the Ex didn't waste any time following suit. The very next year, our fair boasted "Ferris Wheels, Carousals, Swings and other amusements for young and old." Soon, there would be an entire midway.

-----

I got more of this info from Once Upon A Century: 100 Year History of the 'Ex', a book my most CNE-obsessed friend gave me last year.

Tuesday, August 30, 2011

Photo: Toronto Had Craaazy-Bad Smog in 1912

Oh boy. So that's what our skyline looked like around about 1912. Not exactly the kind of place you want to be spending time if you have asthma. Or, you know, lungs. A little more than 100 years before this photo was taken, the whole shoreline was covered by a forest that had been there for thousands of years, full of ancient oak trees and deer and wolves and eagles and bears. We started cutting down the trees as soon as the Town of York was founded. And we thought nothing of chucking our garbage and dead animals and piss and shit into the lake. Which we then drank from. Things only got worse as the Industrial Revolution kicked into high gear. In the mid-1800s, we got railways along the waterfront and with them came massive coal-burning factories like the ones in this photo. They say that by the early days of the 20th century, all the walls in downtown Toronto were black — brick walls hidden beneath a thick layer of toxic soot.