Showing posts with label military. Show all posts
Showing posts with label military. Show all posts

Wednesday, December 16, 2015

The Bloody Beaver Wars & Toronto in the 1600s

1687. A year of war and famine on the shores of Lake Ontario. That summer, on a night in early July, an army camped near the mouth of the Rouge River, at the very eastern edge of what's now the city of Toronto. A few thousand men — professional soldiers from France, militia from Québec and their First Nations allies — feasted on venison before bed. They were tired, finally heading home at the end of a bloody campaign against the Seneca.

Their war was driven by a fashion trend. Far on the other side of the Atlantic, in the cobblestone capitals of Europe, hats made of beaver felt were all the rage. The demand had already driven European beavers to the brink of extinction. Now, the furriers turned to the Americas to feed their ravenous sartorial appetite. The competition over the slaughter of the large, aquatic rodents plunged the Great Lakes into more than a century of bloodshed and violence. By the end of the 1600s, a series of conflicts had been raging for decades on end. Thousands of warriors fought bloody battles over control of the fur trade. They called them the Beaver Wars.

This was long before the city of Toronto was founded, long before the British conquered Québec, all the way back in the days when the French still claimed the Great Lakes for themselves. As far as they were concerned, this was New France. But barely any Europeans had ever set foot on this land: only a few early explorers, fur traders and missionaries. Where skyscrapers and condo towers now reach into the clouds, there was an ancient forest of towering oak and pine, home to moose, wolves and bears. But there were plenty of people here, too — just not French ones: the First Nations and their ancestors had been living here for thousands and thousands of years.

Beaver felt hats, 1776-1825
In the late 1600s, the Seneca had two bustling villages within the borders of today's Toronto, with dozens of longhouses surrounded by vast fields of golden maize. In the west, Teiaiagon watched over the Humber River at the spot where Baby Point is now (just a bit north of Bloor Street and Old Mill Station). In the east, Ganatsekwyagon had a commanding view over the Rouge.

They were both very important places. The Humber and the Rouge were at the southern end of a vital fur trade route: the Toronto Carrying Place trail, which gave our city its name. The rivers stretched north from Lake Ontario toward Lake Simcoe. From there, fur traders could reach the Upper Great Lakes, where the beaver population was still doing relatively well. Now that the Seneca controlled the Toronto Carrying Place, they could ship beaver pelts south into the American colonies and sell them to their British allies.

That pissed the French right off. They wanted those beaver pelts flowing east down the Ottawa River instead, toward their own relatively new towns of Montreal and Québec. By then, they had already spent decades fighting over the fur trade. They were on one side of the Beaver Wars, generally allied with the Wendat (the Europeans called them the Huron) and a variety of Algonquin-speaking nations, like the Odawa. On the other, the British supported the Haudenosaunee (who they called the Iroquois): a confederacy of five nations, including the Seneca.

And things were only getting worse for the French. By 1687, they still had only a few thousand settlers living in all of New France, most of them centered around Québec and Montreal. They had tried to expand their control west into the Great Lakes, establishing a trading post — Fort Frontenac — where Kingston is today. But their efforts ended in humiliating failure. They'd been forced to make peace with the Haudenosaunee and their British allies.

They were beginning to worry that they were going to lose the Beaver Wars entirely — and all of New France with them. They were scared the Haudenosaunee might overrun their settlements in Québec, and that their own First Nations allies would soon abandon them to trade with their enemies instead. 

Thousands of kilometers away, in his new royal palace of Versailles, King Louis XIV — the famous Sun King, who reigned over France longer than any monarch has ever reigned over a major European nation — decided it was time for a change. The Governor of New France was fired. In his place, a new Governor was sent across the Atlantic to run things.

His remarkably long name was Jacques-René de Brisay de Denonville. He was a career solider: a respected officer from an old, rich family with deep ties to the throne. Upon his arrival in Canada, he would wage even more bloody war.

~~~

Jacques-René de Brisay de Denonville
The new Governor's first move was to ignore the peace treaty. Denonville sent a hundred men north to Hudson's Bay to launch a surprise attack against British trading posts there. It was a rout. The French seized three posts run by the Hudson's Bay Company. Now, they controlled the northern trade.

Next, Denonville turned to treachery. In the summer of 1687, he proposed a peace council: a great feast with the leaders of the Haudenosaunee Confederacy. Fifty chiefs came to Fort Frontenac that June to meet under a flag of truce. But it was a French trap. When the chiefs and their families arrived, Denonville's men captured them all, taking about 200 prisoners. Some were tied to posts, bound so tight they couldn't move; some were tortured. Many would be shipped across the Atlantic in chains to serve King Louis as galley slaves.

And Denonville still wasn't done. He'd brought an army with him to Fort Frontenac: 3,000 men, including professional French soldiers, militiamen from Québec, a few coureur de bois, and hundreds of First Nations allies. He led them across Lake Ontario, a sprawling fleet of hundreds of canoes and bateaux sailing toward the southern shore, where New York State is today: the heartland of the Seneca.

The Governor's plan was simple: an invasion to capture and kill as many people as he could. His ultimate goal was laid out clearly in letters sent back and forth across the Atlantic between Denonville, his boss at Versailles, and King Louis himself.

They wanted, they said, "the Establishment of the Religion, of Commerce and the King's Power over all North America." They wanted New France to stretch all the way from the mouth of the St. Lawrence to the mouth of the Mississippi. To do it, they said, they would have to destroy the Haudenosaunee. If they failed, they feared the ruin of New France.

Denonville's boss — a government minister at Versailles — laid out the plan: "all their plantations of Indian corn will be destroyed, their villages burnt, their women, children and old men captured and their warriors driven into the woods where they will be pursued and annihilated by other Indians who will have served under us during this war."

"[His Majesty]," the minister wrote in a letter to Denonville, "expects to learn at the close of this year, the entire destruction of the greatest part of the Savages."

The army landed near where Rochester is today, at Irondequoit Bay. Then, they headed south toward Ganondagan, the biggest of the Seneca villages. Three columns of French soldiers marched through the forest with their First Nations allies. They carried swords and torches and arquebuses — an early forerunner of the musket.

Ganondagan State Historic Site today
But Denonville would have trouble finding anyone to capture or to kill. There was only a single battle fought during the entire campaign. One afternoon, as the French army was approaching Ganondagan through a narrow pass, hundreds of Seneca warriors opened fire on them from behind. There were dozens of casualties on both sides, but the attack failed. Outnumbered, the Seneca warriors retreated.

After that, they disappeared. Denonville didn't see another enemy warrior during the rest of the campaign. And every time his army arrived at a Seneca village, they found it already abandoned.

So the Governor adjusted his plan. If he couldn't kill the Seneca with swords and guns, he would starve them to death instead.

"I deemed it our best policy," he explained to Versailles, "to employ ourselves laying waste the Indian corn which was in vast abundance in the fields, rather than follow a flying enemy..."

For the next ten days, the French army was hard at work burning fields of maize. Kilometer after kilometer went up in smoke. Vast stores were destroyed, too; everything that had been saved for the winter. According to the Governor's own estimates, his men burned 1.2 million bushels of maize. Plus, they burned beans and other vegetables. A "vast quantity" of pigs was killed, too. Entire villages were burned to the ground.

With winter coming in just a few short months, Denonville's scorched earth campaign was enough to cause a famine. It wasn't just Seneca warriors who would die thanks to the French: Denonville's war was a war against civilians. Against the entire Seneca people.

"We have, assuredly," the Governor boasted, "humbled the Senecas to a considerable degree, and seriously lowered their pride and raised the courage of their Indian enemies." 

~~~
 
Longhouse village
By the end of those ten days, Denonville's army was tired. It had been weeks since they left Montreal, making the long and dangerous journey up the rapids and waterfalls of the St. Lawrence River toward Lake Ontario. They'd marched through the woods for days on end, weighed down by their supplies, plagued by mosquitoes. Now, they were getting sick too. "It is full 30 years that I have had the honour to serve," the Governor wrote to Versailles, "but I assure you, my lord, that I have seen nothing that comes near this in labour and fatigue."
 
Meanwhile, some of his First Nations allies were already leaving. There were tensions. Denonville had been badmouthing them in his reports for their "barbarities" and "cruelties" (without even the slightest hint of irony). Some of them were from Haudenosaunee nations themselves — having allied with the French after converting to Christianity — and many seemed to have reservations about the scorched earth campaign. When Denonville asked them to burn the Seneca maize, they'd simply refused.

The Governor decided it was finally time to head home.

He took the long way around. First, the army stopped at Niagara. There, they built a new French fort on the spot where Niagara-on-the-Lake is today. Fort Denonville would give the French and their First Nations allies a base of operations to launch future attacks against the Seneca.

Then, they followed the shoreline as it wrapped all the way around the lake — passing future sites of cities like St. Catharines, Hamilton and Oakville — which brought them, eventually, to the place where Toronto now stands. 

It's hard to tell from Denonville's reports exactly where they stopped each night. But most historians seem to think the army spent two nights within the borders of today's Toronto: the first near the mouth of the Humber River; the second near the mouth of the Rouge.

In his dispatches, the Governor doesn't mention anything about the inhabitants of Teiaiagon or Ganatsekwyagon, the Seneca villages on those rivers. Some historians have suggested that Denonville's army must have destroyed them, too. But it's also entirely possible that the Seneca had voluntarily abandoned them years earlier. Communities usually moved to a new location every 10 to 15 years or so.

Pretty much all the information we have comes from the entry Denonville made in his diary that day — the day we think he woke up at the Humber and travelled to the Rouge. It's not much, but it's one of the very earliest written accounts of the place where Toronto now stands:

The mouth of the Rouge River today
"The storm of wind and rain, prevented us from leaving in the morning but at noon, the weather clearing up, we advanced 7 or 8 leagues and encamped at a place to which I had sent forward our Christian Indians from below. We found them with two hundred deer they had killed, a good share of which they gave to our army, that thus profited by this fortunate chase."

The next morning, the army continued east toward Montreal.

Denonville's campaign had succeeded in bringing death to the shores of Lake Ontario, but his greater goals would fail. The Seneca suffered terribly that winter, but the nation was far from destroyed. And the Haudenosaunee would fight back. The Five Nations of the Confederacy launched their own campaigns deep into the heart of New France. They raided French settlements and destroyed farms. Two years after Denonville's army slept on the banks of the Rouge, Mohawk warriors would travel all the way to the island of Montreal and attack the French settlers at Lachine, burning the town to the ground.

That same year, Denonville was replaced as Governor and returned home to France. He got a new job at Versailles: tutor to the king's kids.

Back in Canada, the wars raged on for another decade. But some leaders on both sides were working toward peace. By the end of the 1600s, the French had tracked down all of the surviving chiefs forced into slavery by Denonville's treachery. Thirteen of them were still alive. They were finally allowed to return home. Meanwhile, the Haudenosaunee were starting to worry about the growing power of their British allies. In 1701, a huge peace council was held at Montreal, with long negotiations leading to a treaty between New France and forty of the First Nations, including the Haudenosaunee. The Great Peace of Montreal became one of the defining moments in Canadian history.

As for Toronto, in the decades that followed the Great Peace, the French established their own trading posts at the southern end of the Carrying Place trail. Fort Douville was built near Teiaiagon. Fort Toronto was at the mouth of the Humber. Fort Rouillé stood on the Exhibition Grounds. By then, their allies, the Mississauga, had moved south into the area; they had villages at Ganatsekwyagon and near Teiaiagon, too.

But the days of peace wouldn't last: there would be even bigger wars in the 1700s. The British eventually invaded New France, winning the Battle of the Plains of Abraham and conquering all of French Canada. The last of the French forts at Toronto — Fort Rouillé — was burned as their troops retreated.

Then it was the American Revolution. The British were overthrown in the United States and those who were still loyal to the Crown were driven from their homes. A flood of Loyalist refugees fled north. Many of them ended up on the northern shore of Lake Ontario, where the British created a new province for them. They called it Upper Canada.

The new province would need a new capital. It would be built on a sheltered harbour between the Humber and the Rouge: at the end of the ancient fur trade route where the First Nations and their ancestors had been living — and hunting beavers — for thousands upon thousands of years. A place they called Toronto.

-----


A version of this story will appear in
The Toronto Book of the Dead
Coming September 2017

Pre-order from Amazon, Indigo, or your favourite bookseller
You can read the documents sent between Denonville, his boss and the King as part of the Documentary History of New York State, which you'll find on Google Docs here.

You can read Denonville's biography at the Dictionary of Canadian Biography here and his Wikipedia page here. The page for the Beaver Wars is here, Ganondagan is here, the Great Peace of Montreal is here, Teiaiagon is here, Ganatsekwyagon is here, Fort Rouillé is here and some of the other French forts here

David Wencer writes about Teiaiagon for Torontoist here and the Canadian Encyclopedia has more about it here. The Kingston Whig-Standard has more about Denonville's treacherous "peace council" here. And the Counterweights blog shares a history of Toronto before the modern city was founded here

The image of the beaver hats comes via Wikipedia, the painting on Denonville comes via the Répertoire du patrimoine culturel de Québec, Ganondagan State Historic Site comes via FingerLakes.com, the longhouse village comes via the Canadian Encyclopedia, and I took the photo of the Rouge River myself.



This post is related to dream
40 The Beaver Wars
Jacques-René de Brisay de Denonville, 1687

Monday, August 3, 2015

John Graves Simcoe, Napoleon Bonaparte & The Politics of Horse Shit

This is a photo of horse shit. But it's not just any photo of horse shit. This horse shit is on Woodbury Common — a beautiful patch of heathland in the English countryside. And with horse shit on Woodbury Common, you can tell a story about the founder of Toronto — John Graves Simcoe — and about a man who challenged him to a duel over that dung.

This was a few years after Simcoe founded Toronto. He'd come back home to England by then, returning to his country in a deeply troubled time. England was at war with France.

The French Revolution had started many years earlier; it was already well underway by the time Simcoe and his family left home for Canada. But things had gotten even bloodier while they were gone: Simcoe founded Toronto in July of 1793; the Reign of Terror began just a couple of months after that, while the Simcoes were living in a pair of fancy tents pitched at the mouth of Garrison Creek. 

And even there — six thousand kilometers from the guillotines of Paris — news of the atrocities reached them. In August, the Simcoes were visited by a pair of fleeing French aristocrats hoping to settle in Upper Canada. They told a morbid story about King Louis' botched attempt to escape his captors. By the time they shared that anecdote, the French king had already lost his head.

A few months later, Marie Antoinette followed her husband to the guillotine. News of her death took many weeks to travel across the Atlantic and up the St. Lawrence to the Canadian frontier. When it did, Simcoe marked the occasion with solemn respect. That evening, the settlers of Toronto dressed all in black, postponing the dance they had planned for the night. They might hate the French, but they were staunch monarchists — many of them had already suffered through the horrors of the American Revolution and were deeply upset by the idea of yet another bloody, democratic uprising.

It was a frightening time. The French Revolution sparked decades of war between France and the monarchies of Europe, including Britain. At the very same time that Simcoe was busy planning the first few blocks of Toronto, he was also busy worrying that the war back home would spread to North America. Even now, French revolutionaries were stirring up trouble in the United States, trying to get the Americans to join the war and invade Canada. Some had even travelled into Québec, where they hoped to convince the French Canadians to rise up and launch their own revolution. As the Simcoes slept in their tents at night, they worried that at any moment an enemy ship might sail over the horizon — or enemy soldiers burst from the woods. Simcoe's wife, Elizabeth, had nightmares about it.

John Graves Simcoe
Things only got scarier when they began to head home for England. As the Simcoes sailed out of the mouth of the St. Lawrence River, French warships were waiting. They chased them out into the Atlantic, seizing other English vessels who were sailing nearby. As the Simcoes' ship dodged icebergs off the coast of Labrador, Elizabeth and the children hid themselves in the cramped quarters below deck. They could hear guns in the distance. It took weeks to sail across the open ocean before the Simcoes finally reached the safety of home.

Even then, it wasn't over. The British would be at war with the French for most of the next twenty years. And things would only get worse. By the time the Simcoes got back to England, a new French general had begun to make a name for himself. Napoleon Bonaparte would prove to be one of the most brilliant and most power hungry dictators in history.

The wars against the French would dominate the rest of Simcoe's life. In the end, he would die fighting them.

But first, he had an important role to play. Simcoe didn't always get along with his superiors, but he did earn the respect of some of the most powerful men in England: Prime Minister Addington, Admiral Nelson, the Duke of York; he even spent time with "Mad" King George. His experience was especially respected when it came to military matters. He'd been one of the most celebrated heroes on the British side of the American Revolution. And as the first Lieutenant Governor of Upper Canada, he'd been responsible for preparing the defences of the new province in case of an American invasion. And so, just a couple of years after his return to England, Simcoe was given a new job: preparing part of England in case of a French invasion.

At times, it seemed as if that invasion could happen at any moment — especially once Napoleon was in charge. Having already expanded his empire on the Continent, the French general began to assemble an army to bring England to its knees. Two hundred thousand men were being trained on the coast of France: the Armée d'Angleterre. A whole flotilla of barges was built to carry them across the English Channel. For a while, Napoleon was even toying with the idea of deploying the world's first air force: a fleet of hot air balloons to support the attack. There were rumours of a giant tunnel being dug beneath the Channel. And of a massive raft powered by windmills. To pay for it all, Napoleon had already sold the Louisiana Territory to the Americans. He was so sure his invasion was going to succeed that he built a triumphal arch to commemorate it before it had even happened.

Meanwhile, on the other side of the Channel, Simcoe was getting ready for the invasion. The British government had put him in charge of the entire defence of the West Country. Devon, Cornwall and Somerset would be under his command. If the French landed there, Simcoe and his men would answer with a scorched earth campaign. They would evacuate all women and children, the elderly and the sick — and all the livestock, too. Everything they left behind would be destroyed. The French would find nothing to eat.

Instead, they would be met by the biggest military force Britain had ever assembled. More than six hundred thousand men were ready to fight — nearly 10% of the entire population of England. In the West Country alone, Simcoe was in command of twelve thousand men.

Woodbury Common
But they weren't all experienced soldiers. Professional troops were joined by volunteers and conscripted militia. They needed lots of training. And to do that training, Simcoe sometimes took them to Woodbury Common.

Woodbury Common is high in the gorgeous green hills of Devon. It's just a few kilometers from the Simcoes' summer home in the seaside town of Budleigh Salterton. And it's not too far from their country estate in the Blackdown Hills, either. It's a beautiful place: gently rolling hills covered with flowers, shrubs and short grass. It's typical heathland; in fact, if you look up "heath" on Wikipedia, the first photo you'll see is a photo of Woodbury Common. It's one of England's official Areas of Outstanding Natural Beauty.

At the very highest point on the Common, you'll find a patch of trees. They're growing on the remains of massive earthworks. The big ditches are what's left of the ancient Woodbury Castle: an Iron Age hill fort built in the days of the druids; it's more than two thousand years old. From the lands around the castle, you can see for miles and miles in every direction — all the way back down to the sea. It's the perfect spot for a military base. In fact, the British army still trains there to this day.

And so about two hundred years ago, you could find thousands of Simcoe's troops camping on Woodbury Common as they awaited Napoleon's arrival — and with those camping men came hundreds of horses.

That, finally, bring us to the horse shit.

With all those horses trotting around, there was, of course, plenty of dung on Woodbury Common. And the question of who was ultimately responsible for it — Simcoe's troops or the local land owner — sparked a fight that nearly ended in a duel. But not for the reason you might think.

The principal owner of the lands around Woodbury Common was a man by the name of Lord Rolle. History would eventually remember him as the man who tripped during Queen Victoria's coronation and rolled down the steps to the throne. He and Simcoe didn't get along at all. Rolle was pretty pissed off by the inconvenience caused by all the men camping on the Common. And he was even more pissed off by the fact that they were cleaning up after themselves. Simcoe was making sure that all the horse shit was being collected and taken away. Rolle was furious. He wanted that horse shit for himself. It was valuable manure.

Rolle began a letter-writing campaign. He complained to the authorities, insisting that tradition dictated that any horse shit left by the military on common land belonged to the local lord of the manor: him. Simcoe was stealing his shit. And if Simcoe got away with it, it would set a dangerous precedent: any British general would be allowed to trample the rights of any lord. The question of the horse shit on Woodbury Common, Rolle argued, was a question of importance to every single subject in the British Empire.

Simcoe, for his part, sent a flurry of his own letters arguing the opposite. And as the letters flew back and forth, the fight escalated. Before long, Rolle was ordering his men to physically stop Simcoe's troops from removing the shit from the Common. The dispute was getting so serious that it was eventually forwarded all the way to the man in charge of the entire British military: the Duke of York (the son of "Mad" King George III and the guy who Simcoe had originally named Toronto after — back when it was still known as the town of York).
 
Woodbury Castle
In the end, Simcoe lost the battle of the Woodbury Common horse shit. His orders came directly from Whitehall — the heart of the British government at Westminster. The manure belonged to Rolle. He would be compensated for the shit that had already been taken away. And he would be allowed to keep any dung produced by Simcoe's horses in the future — as long as he sold it to the public at an appropriate discount.

But Rolle still wasn't satisfied. He was so angry with Simcoe that he challenged him to a duel. He wanted, he declared, to have a fist-fight with the founder of Toronto.
 
Simcoe was not impressed. Gentlemen, he replied, didn't fight with their fists. It was unseemly. If Rolle wanted to have a duel, they could have a duel: with pistols or with swords. It didn't count if there was no chance you might die.

Rolle backed down.

And so did Napoleon. The tiny French Emperor never did invade England. Instead, he marched his army east into the heart of Europe. But it wasn't the end of Simcoe's connection to the man. There was one sad chapter left to come.

It didn't take long for the French army to invade Spain and Portugal. The Peninsular War — as it was called — would rage for years on end. It was a bloody campaign. Tens of thousands were killed or wounded. Simcoe's own son, Francis, would die during the Siege of Badajoz in Portugal. (Just a toddler when Toronto was founded, his parents had jokingly named their log cabin in his honour: Castle Frank. We still remember it today in the name of a subway station.)

By then, John Graves Simcoe was already dead. He died during that same campaign. His preparations for Napoleon's invasion had earned him a promotion: Commander-in-Chief of the entire British army in India. But just before he left for his new post, he got new orders: his services were once again desperately needed in the fight against the French. Simcoe sailed to Portugal. But the ship he sailed on was damp and newly painted. He had always suffered from terrible respiratory problems — in fact, that's why he'd been forced to come home from Canada.

Simcoe was deathly ill by the time he made it to Lisbon. He would never recover. He was loaded back onto the same sickly ship and sent home across the Channel to England. He died in Exeter just a few days later.

As for Napoleon, well, he did finally make it to Devon one day. But it wasn't at the head of an invading army. Instead, he saw those rolling green hills from the deck of a British ship as it sailed by. It was all over; he'd lost the Battle of Waterloo and was now being held prisoner. Defeated for the final time, the French general asked if he could retire in England with a small parcel of land. His request was refused. The British didn't let him off that ship; he was never to set foot in Devon. Instead, they kept sailing, taking him far away to the isolated island of Saint Helena where he would live out the rest of his days in peace and frustrating quiet.

-----

More than two hundred years after Simcoe founded our city, Toronto is still wrestling with the question of who is responsible for our horse shit. You can read more about that on the CBC News website here.


The first person to alert me to the story of Simcoe and the shit was Michael Downes at the Fairlynch Museum in Budleigh Salterton. You can find the museum at their website, on Twitter, and on Facebook.

Simcoe's biographers, Mary Beacock Fryer and Christopher Dracott, cover the story in their book, which you borrow from the Toronto Public Library here or buy here.

You can learn more about Napoleon's brief stay in Devon in Devonshire Magazine here.

Photos of Woodbury Common and Woodbury Castle by me: Adam Bunch.



This post is related to dream
01 Metropolitan York
John Graves Simcoe, 1793

This post is related to dream
30 The Conference of the Beasts
Francis Simcoe, 1796

This post is related to dream
34 The Upper Canadian Ball
Elizabeth Simcoe, 1793


Wednesday, July 8, 2015

Toronto's Rebel Mayor & His Pirate Admiral

William Lyon Mackenzie ran for his life. His rebellion had failed. It was a disaster. His rebel army was crushed on Yonge Street. His headquarters at Montgomery's Tavern were burned to the ground north of Eglinton. Some of his men were already dead. Others would soon be hanged for treason. Just a few years earlier, Mackenzie had been the first Mayor of Toronto. Now, he was the city's most wanted fugitive. The Lieutenant Governor was offering a £1000 reward for his capture. So Mackenzie was forced to flee the city he loved, smuggled through the countryside by his supporters as gangs of angry Loyalists searched for him. He ran all the way south to Niagara, getting rowed across the river just a few minutes ahead of the men who had come to arrest him. He was lucky to escape Canada with his life. He would spend the next decade living in exile.

But Mackenzie wasn't ready to give up. Not yet. His failed rebellion in Toronto was just the beginning. Now, he and his supporters would launch a war against the British government in Canada, hoping a series of bloody border raids would spark a full-scale democratic revolution. It would last a year — for pretty much all of 1838. We call it the Patriot War.

And the rebel's admiral in that war was a man by the name of Pirate Bill Johnston. He was a smuggler, a spy, a veteran of the War of 1812 on both sides and, weirdly, an IRS agent. The rebel mayor was the most wanted man on the western shore of Lake Ontario. But the pirate admiral Bill Johnston would soon be the most wanted man in the east. 

He'd been born in Trois Rivières, but he grew up just outside Kingston. And it was there that he would make his name as a young smuggler. By the time he was in his early 20s, Johnston was the captain of his own ship. He sailed his schooner through the labyrinth of islands at the spot where the St. Lawrence River meets Lake Ontario. We call them the Thousand Islands — but there are actually almost two thousand of them. It was the perfect spot to be a smuggler. Johnston would make runs through the confusing warren of islands, bringing contraband goods across the river from the United States. And he wasn't alone. Some estimates say that as much as 90% of all the tea in Upper Canada had been smuggled into the province to avoid paying taxes — and plenty of the rum, too.

The Thousand Islands by Elizabeth Simcoe
Still, while Johnston might have been a smuggler, he was also a loyal British subject and Canadian. That is, at least, until the War of 1812.

When the Americans first invaded, Johnston fought on the Canadian side. But he'd never been very good at following rules: he clashed with his superiors so much that he eventually beat one of them up and got tossed in jail for a time. Meanwhile, he'd also developed a soft spot for the ordinary American citizens who were being held in Canadian prisons during the war. He kept bailing them out and smuggling them back across the border so they could go home to their families. That landed him in jail again. The Canadians accused him of being a spy.

This time, he'd had it. Pirate Bill defected. Once upon a time, his own parents had fled from the United States — they were Loyalist Americans driven from their homes for taking the British side in the American Revolution. Now, their son headed in the other direction. He climbed into a canoe with a few American refugees and rowed himself all the way across the lake to the American naval base at Sackets Harbor. There, he found the man in charge of the United States' fleet on Lake Ontario — Commodore Isaac Chauncey — and pledged himself to the American cause. Now, Pirate Bill would fight for the stars and stripes.

Johnston spent most of the next two years fighting against the British and the Canadians in the Thousand Islands. He waged war in a big rowboat armed with a cannon, a vessel light enough that he and his men could slip through the islands more easily than the big warships, striking quick like lighting and then evading capture. Pirate Bill would witness some of the most famous moments in the entire war, including the Battle of Sackets Harbor and the failed American invasion of Montreal that ended in disaster at Crysler's Farm. By the end of the war, it seems that he had earned a reputation as a notorious pirate — at least as far as the British were concerned.

After the war, Johnston went back to his old job: smuggling tea and rum into Canada. But now, he did it from the American side. And he also worked for an early precursor of the Internal Revenue Service, spying on Canadian smugglers for the United States government. For the most part, the next twenty years were quiet ones for Pirate Bill. He grew into middle age, raising his family on the American banks of the St. Lawrence, just across the river from his old stomping grounds in Canada.

The burning of the SS Caroline
And then came Mackenzie's rebellion.

Johnston was in his late 50s by the time Toronto's rebel mayor marched his army down Yonge Street. But Pirate Bill followed news of the events from far on the other side of Lake Ontario. He heard of the rebellion and of Mackenzie's escape to the United States. There, the rebel mayor immediately set to work rallying supporters, giving speeches, raising money, collecting guns and ammunition, getting ready to launch his new war in the name of democracy.

Just a few days after his harrowing escape across the border, William Lyon Mackenzie and his supporters seized an island on the Canadian side of the Niagara River — Navy Island, just above Niagara Falls — and declared themselves to be the provisional government of the new Republic of Canada. They even had their own flag and currency. The Patriot War had begun.

The first major incident happened just a couple of weeks after that. The rebels on Navy Island were being supplied by an American steamship called the SS Caroline. One winter night, a band of Loyalists snuck across the river, attacked the ship, forced her crew off the boat, set her on fire, and watched as she floated down the river, sinking as she burned. Charred chunks of the vessel plunged over Niagara Falls.

The burning of the Caroline sparked a diplomatic crisis. It was, for many Americans, an absolute outrage — reason enough to declare war on Canada. The Caroline was an American ship in American territory. One of the crew members — a Black man by the name of Amos Durfee — had been shot dead, his body left on the dock. His corpse would be carried to Buffalo and displayed outside the Eagle Tavern as a recruiting tool for Mackenzie's new war. Durfee's body, one reporter wrote, "was held up — with its pale forehead, mangled by the pistol ball, and his locks matted with his blood! His friends and fellow citizens looked on the ghastly spectacle, and thirsted for an opportunity to revenge him." Newspaper accounts of the battle, grossly inflating the death toll, made things even worse.

"The loyalist troops," the New York Herald cried, "have made an assault upon our territory. They have murdered in cold blood our citizens. They cannot escape our vengeance... Niagara's eternal thunders are sounding their requiem! and from the depths of that mighty flood come the wails of their spirits, calling for the blood of their murderers!"

The body of Amos Durfee
Few were as angry as Pirate Bill Johnston. Soon, he was in Buffalo himself, meeting with Mackenzie and other rebel leaders at the Eagle Tavern. He was joining their war. Mackenzie named him the Admiral of the Patriot Navy in the east. Of course, they didn't actually have a navy, but they weren't about to let that stop them.

They would start with an attack on Fort Henry in Kingston. It seems to have been Pirate Bill's idea. It would be a huge victory if they could pull it off, seizing the biggest military base in the province. But it would be difficult. One force would attack Windsor as a distraction in the west. Another, led by Pirate Bill, would head to the Thousand Islands and attack Gananoque as a distraction in the east. The main force would gather on Hickory Island, not far from Kingston, ready to march across the ice of the frozen St. Lawrence and launch the final attack.

The day they picked to begin their operation was February 22 — George Washington's birthday. They spent the next few weeks getting ready. In towns across upstate New York, American volunteers and exiled Canadians trained to fight. Pirate Bill and the Patriots broke into military depots and stole thousands of guns — sympathetic American guards simply melted away. Some of the weapons were smuggled into Canada, into the countryside around Kingston, where hundreds of rebel supporters secretly waited to join the attack once the invasion had begun. At least one spy inside Kingston fed the Patriots information and was ready to act on the fateful day.

But things didn't get off to a very good start. The attack on Windsor quickly failed. And in the Thousand Islands, the Patriot rebels were having trouble keeping their plans a secret. A young teacher from Gananoque — Elizabeth Barnett, hailed as the Laura Secord of the Patriot War — caught wind of the invasion while she was visiting family on the American side of the St. Lawrence. She rushed back home to Canada to warn the authorities. And by then, the authorities already had their own suspicions. They were building defences. Holes were being cut in the ice. Mohawk reinforcements were called in. The spy was unmasked and sent into exile. Suspected rebel sympathizers were warned: they would be killed if they so much as left their houses.

Still, it was the name "Pirate Bill" that sparked the most fear. "When [Elizabeth Barnett] mentioned Bill Johnston's involvement," the historian Shaun J. McLaughlin writes on his great Pirate Bill Johnston blog, "the townsfolk had fits. Women and children fled to the country for safety. Men gathered their weapons. Couriers rode at a gallop to‎‎ Kingston, Brockville, and other towns to spread the warning."

Fort Henry, 1839
Meanwhile, on Hickory Island, the rebels were gathering. But it wasn't going well there, either. It was the dead of the Canadian winter. The temperature had plummeted to -33ºC. And the Patriot General in charge of the attack — the awesomely named Rensselaer Van Rensselaer — was a drunk who doesn't seem to have inspired much confidence in his men. More than a thousand began the trip, but only a few hundred ever made it to Hickory Island. In the end, Van Rensselaer turned around and went home. He never even started his attack.

It was a devastating blow to the rebels. And things only got worse from there. By now, the Patriot leaders were beginning to turn on each other.

Mackenzie blamed the failure at Hickory Island on Van Rensselaer's alcoholism and incompetence. Pirate Bill agreed. "If Mackenzie or any other decent man had been at the head," he said, "they would have taken... Kingston." And Van Rensselaer was no fan of Mackenzie's either. He called the rebel mayor a "meddling craven" and "a cruel, reckless, selfish madman... the greatest curse of the cause he pretends to espouse..."

But their disagreement was about more than just personal hatred. It was a symptom of a growing split in the movement — between the Canadian Patriots and their American allies. Van Rensselaer was an American. (He was from one of the most powerful families in New York State: his grandfather had signed the Declaration of Independence; his uncle was one of the richest Americans ever.) And the Americans were having more and more influence over the Patriot War. They even created a secret society — the Hunters' Lodge — to support it. Tens of thousands of Americans joined; some estimates put the number as high as two hundred thousand. They were all promised free farmland in Canada once the war was won. Many of the soldiers who volunteered to fight with the rebel mayor and his pirate admiral were members of the Hunters' Lodge. It made Mackenzie uneasy. What had begun as a Canadian rebellion against their British overlords was beginning to look more and more like an American invasion of Canada.

It was also beginning to look more and more like a failed invasion. A couple of weeks after Hickory Island, Van Rensselaer launched another attack: this time his men seized Pelee Island in Lake Erie. But the Loyalists fought back. By the time the dust had settled, the rebels were defeated and Van Rensselaer was dead.

The Battle of St. Eustache in Québec
Meanwhile, things weren't going any better on the war's other front. Mackenzie's rebellion wasn't the only democratic uprising in the Canadian colonies that winter. At the same time he'd been marching his army down Yonge Street, his allies in Québec had been fighting their own battles against the British government there. They too had been driven into exile in the United States; Mackenzie had been coordinating with them as they launched their own border raids into Canada. But they didn't seem to be having any more success than the rebel mayor was.

Mackenzie was finally losing faith. War didn't seem to be getting him anywhere. Over the spring and summer of 1838, the rebel mayor's thoughts began to turn to peace. He moved to New York City where he launched a newspaper called Mackenzie's Gazette. At first, he used it to support the Patriot violence. "One short war well managed might give this continent perpetual peace," he argued. "Until Canada is freed the revolution in America will not be complete." But by the end of the summer his tone had changed. Now, Mackenzie was arguing in favour of a bloodless, political solution to the problems in Canada.

Johnston felt betrayed. But even with Mackenzie gone and Van Ransselaer dead, Pirate Bill fought on.

His next move: he would finally find himself a navy.

Late one stormy May night, a Canadian steamship carried her passengers through the Thousand Islands on her way west to Toronto. But the Sir Robert Peel wasn't alone in those choppy waters. She was quietly being followed by a pair of rowboats. It was Pirate Bill. He was in command of at least twenty Patriots, some of them — just like the American rebels at the Boston Tea Party — were disguised in a crude parody of First Nations clothing. They had come to steal the Peel and then use her to steal a second ship. Between them, the two vessels would be the beginning of Pirate Bill's rebel fleet.

It wasn't a random attack: the ship was owned by members of the Family Compact. They were the powerful, pro-British, Tory elites whose anti-democratic policies had sparked Mackenzie's rebellion in the first place. They were the enemy. 

When the Peel finally pulled into port to pick up more wood for her boilers, Pirate Bill and his men were ready. They landed a few hundred meters away and crept through the dark forest, getting ever closer to the Canadian ship. Finally, letting their war cries fly, they rushed from the darkness, raced across a clearing, and charged up the gangplank onto the decks. They quickly seized the vessel, forcing the crew and the groggy passengers back onto land at gunpoint. It was easy. Almost no one put up any resistance — there was one fistfight and that was it. The ship was theirs.

The burning of the Sir Robert Peel
Johnston was now expecting more rebels to arrive. In fact, he was counting on them — none of his men knew how to run the boilers on a steamship. So he waited. And waited. But they never came. In the end, he had to abandon his original plan. Instead, he ordered his men to set the Peel ablaze.

As the rebels lit the flames, they cried out: "Remember the Caroline!"

Pirate Bill finally had his revenge. But now, he had really pissed people off. And not just his enemies. As Johnston hid in a cave in the maze of the Thousand Islands, both the Canadian and American authorities launched massive manhunts.

Still, even in hiding, Pirate Bill was a thorn in the side of the Family Compact. He published a proclamation of war from his island hideout. "The object of my movement is the independence of the Canadas," he declared. And all the while, he kept trying to raise money and find guns for his men. "I will warrant," he promised one potential supporter, "that they shall kill four times their number of Tories and give you their scalps if you shoud whant them."

Once, when Johnston was spotted by a passing ship, he couldn't resist chatting with some of the starstruck passengers. "One thing you may rest assured of," he told them, "I will never be taken alive... Whoever comes after me must bring his own coffin..." As the ship sailed off into the distance, one of the passengers saluted the rebel by flying a handkerchief in the breeze. Pirate Bill responded by unfurling the flag of the Sir Robert Peel.

"Bill Johnson [sic]," said one of his greatest enemies, "laughed at the efforts of the Governor and all the authorities." The pirate admiral made narrow escapes: racing through island forests under a hail of musket balls, slipping out of Loyalist traps, flaunting his nerve by throwing a huge party just before abandoning one hideout for another. His daughter Kate, who smuggled him supplies, became a celebrity in her own right. She was famous for her uncanny ability to evade the authorities. People started calling her the Queen of the Thousand Islands.

But the Patriot War wasn't over. And Johnston was still the rebel admiral. He had one more big battle to fight.

It would happen in November, a few dozen kilometers east down the St. Lawrence. The Patriots were planning an attack on Prescott. They hoped to capture Fort Wellington. Pirate Bill would play an important role.

The Battle of the Windmill
Things, yet again, got off to a rocky start. This time, quite literally. As the battle got underway early that morning and church bells rang the alarm on the Canadian shore, two of the ships that the rebels had stolen ran aground near the battlefield. Johnston was forced to come rescue them — and even he could only get one of them free. As a third Patriot ship tried to rescue the other stranded vessel, an American boat turned her cannons loose. The pilot of the Patriot ship had his head blown off by a cannonball; the new Patriot general, terrified, suddenly claimed he was sick, ordered the ship back to shore, and spent the rest of the battle hiding in his cabin.

Meanwhile, Pirate Bill had begun to ferry hundreds of soldiers across the river, taking them from the American side over to fight on the Canadian shore. Their first assault on Prescott fell short: the Canadian authorities, once again, knew the attack was coming. But by the end of that morning, the rebels had seized control of a big windmill outside town. (It's still there nearly two hundred years later; it's a lighthouse today and a National Historic Site.) The battle would become known as the Battle of the Windmill.

It lasted for days. The Loyalists attacked the windmill the very next morning, but it made for a pretty good fort. It had thick, stone walls and a commanding view of the St. Lawrence. Rebel snipers peered from the windows. It wouldn't be easy to drive them out. More than a dozen Loyalists died in that first attack; dozens more were wounded. It seemed as if things had reached a stalemate.

But then, the Americans arrived.

Many ordinary American citizens supported the rebel cause. But the American government was a different story. The Patriots had long hoped that President Van Buren would come to their rescue — or that the bloody battles on the border would eventually spark another full-scale war between Britain and the United States, which might end in a new, democratic Canada. At the very least, the rebels hoped the American government would look the other way — allowing them to use the United States as a safe haven from which they could launch their attacks. The United States, after all, was still no fan of the British. It had only been a couple of decades since the War of 1812. And indeed, it didn't seem as if the American authorities were in a rush to prosecute the rebels or their supporters.

But there was a limit. And the rebels had finally reached it. Van Buren wasn't going to allow them to drag his entire nation into war. He was going to put a stop to it. He was going to close the border. And he was going to do it right in the middle of the battle.

As the fight between the Patriots and the Loyalists raged, suddenly there was a new arrival: the United States Navy. The Americans seized the big Patriot ships. And an American vessel took their place, patrolling the water in the middle of the St. Lawrence, cutting off the rebel supply line and making it nearly impossible for Pirate Bill to ferry any more soldiers across the watery border.

The windmill, now a lighthouse
That night, the pirate admiral roamed the port on the American side, desperately trying to convince his troops to hazard the short journey across the river. Some agreed and he rowed them over himself, sneaking by the American patrol. He spent the next two days trying to convince more men to join the fight — and watching the battle at the windmill from across the river. He barely ate and he barely slept. He watched his dream crumble from the roofs of the American town. Now, the Royal Navy was moving in. Big guns were beginning to arrive. The rebels had run out of ammunition, reduced to firing door hinges and whatever other scraps of metal they could find. The end was drawing near.

On the final day of the battle, the Loyalists bombarded the windmill with artillery. The rebels were doomed. And with all their escape routes cut off, there was nowhere for them to go. Dozens would be killed or wounded. The rest, finally, surrendered.

The Patriot War was now pretty much over. The Pariotes rebels in Québec had finally been crushed just a few days earlier. There would be one more attack on Windsor, but that was crushed too. A year after William Lyon Mackenzie led his army down Yonge Street, the Canadian revolution was finally over. It had failed.

Many of the Patriots would be hanged. Some didn't even get a trial. Nearly a dozen men from the Battle of the Windmill were executed. Dozens more would be sent into exile in Australia — some of those would die there from the poor treatment and harsh conditions of the prison camps.

But times were changing in Canada. The days of the Family Compact were numbered. With the most radical Canadian democrats dead or exiled, the moderates took over. Just ten years after the end of the Patriot War, they were able to win at the ballot box what Mackenzie and his rebels had been unable to win at the end of a rifle. The supporters of Toronto's Robert Baldwin and Montreal's Louis-Hippolyte Lafontaine joined forces to bring Responsible Government to Canada. Democracy had finally arrived.

And with it came pardons for those who had fought in its name. The exiled Patriots were finally allowed to come home. Even the rebel mayor was officially forgiven. William Lyon Mackenzie returned to Toronto, where he would live out the rest of his days. He was even re-elected to parliament.

As for Pirate Bill Johnston, well, at the Battle of the Windmill he'd narrowly evaded capture yet again. But with the war over, he soon turned himself in to the American authorities so his son could collect the reward. He had always said there was no prison in the world that could hold him. And over the following months, he proved that to be true: over and over again, he would get caught or turn himself in, only to escape when the mood struck him. Eventually, they just stopped trying to find him at all.

Pirate Bill returned to his quiet life in the Thousand Islands. And once President Van Buren had been tossed out of office — thanks in no small part to his wildly unpopular intervention in the Battle of the Windmill — the American government even gave Johnston a plum post as the lightkeeper of the Rock Island Lighthouse. The man who would be remembered by history as a pirate, spent his later years watching over the treacherous waters he knew so well — making sure others could travel them safely.

-----

Shaun J. McLaughlin's great Pirate Bill Johnston blog is here. His "Raiders and Rebels" blog, about the history of raiders, rebels, and pirates in the Thousand Islands is here. He also has an entire book about the Patriot War which you can buy here.

Lilian F. Gates wrote a whole book about William Lyon Mackenzie after the Rebellion of 1837. You can buy it here, borrow it from the Toronto Public Library here, or read it online with a Toronto Public Library card here.

The village of Alexandria Bay, on the American side of the Thousand Islands, still hosts a Bill Johnston's Pirate Days festival every year. It's apparently ridiculously inaccurate, historically-speaking.

Shaun J. McLaughlin discusses that festival and the many myths that have grown up around the story of Pirate Bill on the Thousand Islands Life website here. They've also got more about the burning of the Sir Robert Peel here (which is also where I found the image of it). And a whole page of reference material for the Patriot War here (which is where I found the image of Fort Henry). 

Mark Totten writes about the Caroline affair in his book, "First Strike: America, Terrorism, and Moral Tradition" on Google Books here. Meanwhile, Lieutenant-commander Paul Rutkus discusses the Battle of the Windmill and its influence on the Canadian laws around the issue of "unlawful combatants" in a PDF here.

The photo of the windmill turned lighthouse is from Flickr user Dennis Jarvis. You'll find it here. The portrait of Pirate Bill Johnston comes from Wikipedia here. And the image of Amos Durfee's corpse does too, from here. And the image of the Battle of the Windmill here.

I also made this rough timeline to help wrap my head around the order of events. So I supposed I might as well share it just in case anyone ever finds it useful:

 
PATRIOT WAR TIMELINE

Dec 11, 1837: Mackenzie reaches US
Dec 12: Mackenzie gives speech in Buffalo.
Dec. 13: London Rebellion fails
Dec. 14: Republic of Canada proclamation goes to the printers
Dec. 14 or 15: They take Navy Island
Dec. 19: the Governor of NY speaks out against sympathy leading to the breaking of the law
Dec. 19: second proclamation adds $100 silver.
Dec. 21: third proclamation
Dec. 26: Rolph visits Navy Island; won't have further involvement
Dec. 29: Caroline burns
Jan. 5, 1838: Van Buren doubles down rhetoric — plus a marshal gets sent to block supplies to Navy Island
Jan. 10: Navy Island has gone days without supplies, running out of money
Jan. 14: Abandon island
Jan 16ish: Mackenzie meets Pirate Bill and the other guys for the plan
Feb. 22: date they want to attack; Washington's birthday
Feb. 24: Fighting Island/Detroit failed attack
Feb. 28: Hickory Island/non-attack
Feb. 28: Lower Canadian Patriotes cross the border
Late Feb/Early March: Mackenzie & Van R have split. Mackenzie will head toward peace.
Mar. 3: Pelee Island: rebels capture and are quickly driven from Lake Erie island
Mar. 29-30: Sir Robert Peel burns — in the wee hours of the 30th.
June 10: Pirate Bill's Proclamation of War
June 11: Pirate Bill spotted, waves flag
June 21-23: Short Hills Raid; McLeod & other cross at Niagara, failed to rile up trouble
July 4: Fort Wallace party
July 21: Mackenzie preaching peace now (in NYC I think)
Nov. 3-10: Second Lower Canadian Rebellion
Nov. 12-16: Battle of the Windmill ***CLIMAX!***
Nov. 28: Pirate Bill is custody by now; escapes on this day
Dec. 4: Battle of Windsor
Jan. 29, 1839: Pirate Bill, in custody, still gets to attend a benefit for himself (and will attend other stuff too)
Apr. 12: Toronto rebels Lount & Matthews hang
June: Mackenzie's trial begins
August 19: Pirate Bill arrested yet another time
1841: Pirate Bill asks Van Buren for a pardon. Doesn't get it.




This post is related to dream
10 The Battle of Montgomery's Tavern
William Lyon Mackenzie, 1837

Tuesday, March 31, 2015

The Bloody Burlington Races & The War for Lake Ontario

They appeared out of the darkness, looming above the waves. Ten warships sailing across Lake Ontario, far out in the water south of Toronto. They were first spotted at dawn, as the black September night gave way to the light of day, wooden hulls carving through the waves, sails stretching high into the early morning sky. From each of the ships flew the red, white and blue: fifteen stars and fifteen stripes. The American fleet. This was 1813. Toronto was in the middle of a war zone. And it was going to be a bloody day.

The War of 1812 had been going on for more than a year now. With the might of the British Empire distracted by Napoleon, the American conquest of the Canadian colonies was supposed to be quick and easy. Former President Thomas Jefferson promised that it would be "a mere matter of marching." But the British, Canadian colonists and their First Nations allies resisted the invasion at every turn. It wasn't quick or easy at all.

Back then, Toronto was still just the muddy little frontier town of York. But as the tiny new capital of Upper Canada, our city was caught up in an arms race that might decide the fate of the entire war. The Great Lakes were the most pivotal battleground. Controlling the water meant that you could move your troops and supplies wherever you wanted to — while keeping the enemy from doing the same. Both sides rushed to build the most powerful fleets possible. Some of the biggest warships in the world were being built in the shipyards on either side of Lake Ontario. They had crews of hundreds of men; they bristled with dozens of guns. They turned our lake into the scene of countless horrors. They say that when warships met in battle, the results were so gory that some crews spread sand across their decks in order to keep them from getting too slippery. Others painted them red so all the blood would blend in.

HMS Sir Isaac Brock
Just a few months earlier, shipbuilders in Toronto had been hard at work near the foot of Bay Street hammering together the HMS Sir Isaac Brock (named after the British general who died fighting the Americans at Niagara). She was going to be the second biggest ship on Lake Ontario, giving the British control of the water. But there were spies in Toronto — the Americans knew all about the construction. In April, just before the Brock was ready to set sail, the Americans invaded Toronto, hoping to steal the new ship. They won the battle, but the retreating troops burned the Brock before the invading army could get to her.

Still, the advantage on the Great Lakes was swinging dramatically toward the Americans. In early September, they won a stunning victory on Lake Erie. They captured the entire British fleet on that lake, giving them complete control of it. Now, they just needed Lake Ontario: "the key to the Great Lakes." If they won it, they would be able to pull off their grand plan: ship troops up the St. Lawrence River and besiege Montreal. 

So now, the Americans were sailing back toward Toronto. This time, they weren't coming to capture just one ship; they wanted the entire British fleet.

The man in charge was Commodore Isaac Chauncey. He was from Connecticut, but he first made a name for himself fighting pirates off the coast of Tripoli. Back in April, he'd been in charge of the American ships invading Toronto. Now, he was commanding his fleet from the deck of a brand new flagship: the USS General Pike (named after the American general who'd been blown up at Fort York during the invasion). The Pike sailed at the head of a squadron of ten ships — some towed behind the others for extra firepower. The Americans had bigger guns with longer range than their British counterparts. But their ships were also slower and harder to maneuver.

The British squadron was smaller: just six ships. They were commanded by Commodore Sir James Yeo, an Englishman who had been welcomed to Upper Canada as a hero — one of the rising stars of the most powerful navy on Earth. He sailed aboard his own brand new flagship, the HMS General Wolfe (named after yet another dead general: the guy who had died fighting the French on the Plains of Abraham). She was the sister ship of the burned Brock, built in Kingston at the very same time.

Sir James Lucas Yeo
As dawn broke over Lake Ontario that morning, the Wolfe and the rest of the British fleet were just to the west of Toronto — not far from Port Credit. They spotted the Americans in the distance; they were still about a dozen kilometers away.

The battle got off to a slow start. With all that distance between the two squadrons, Commodore Yeo and his men had enough time to sail over to the harbour at Toronto, sending a small boat ashore with an update. Meanwhile, the Americans patiently stalked their prey: they sailed up to a spot south of the islands (just a sandy peninsula back then) and waited. It wasn't until mid-morning that Yeo turned his squadron around and left Toronto, sailing south out into the middle of the water. The Americans followed, chasing the British into the heart of the lake, the wind in their sails. As the sun rose high into the sky, they were steadily making up ground. It wouldn't be long now. Both fleets shifted into single file lines: battle formation. 

It was Yeo and the British who made the first move. A little after noon, the Wolfe suddenly swung around, heading back toward the Americans, trying to slip by the Pike and open fire on the middle of the enemy line.

Commodore Chauncey and the Americans countered. The Pike began to turn too, trying to cut the Wolfe off, drawing closer and closer and closer... until there were only a few hundred meters between them. But as the great bulk of the American flagship slowly swung around, her formidable bank of guns was still facing in the wrong direction. She was exposed.

The Wolfe opened fire. The British guns roared smoke and iron, cannonballs whizzing through the air between the two ships, smashing into the Pike. One British volley after another tore into her. But slowwwwwwly, the Pike swung around. Now, the might of her firepower was finally facing in the right direction: at the Wolfe. Fourteen American cannons burst to life, a wall of white smoke and fire. Back and forth, the two great flagships thundered. Wood burst into splinters. Sails were ripped and torn. Blood spilled onto the decks. On board the Pike, a mast snapped, toppling into the sails below.

And then: catastrophe for the British. One of the masts on the Wolfe came crashing down, pulling a second mast, sails, rigging and weights down with it — they tumbled onto the deck and then over the side into the water. Without them, the Wolfe was in serious trouble. "It was," writes the historian Robert Malcomson in his book, Lords of the Lake, "the danger Yeo had sought to avoid all summer... disaster."

At that moment, it seemed as if everything was lost. The Pike was closing in, the American sailors were reloading their guns, the end was drawing near. "In the battle for control of Lake Ontario," Malcomson writes, "this instant may have been the most pivotal." The Americans were about to win the battle — and with it, the entire lake. The whole war might follow.

The Royal George (in an earlier battle)
It was the Royal George who saved the day. She was the second ship in the British line — and she had finally turned around too. She rushed into danger, sailing right into the line of fire, putting herself between the Americans and the wounded Wolfe and then slamming on the brakes. She opened fire. Again and again and again, she roared, sending a hail of iron death flying into the Pike, buying enough time for the rest of the fleet to join the fight. Ships on both sides sent volley after volley sailing into the air, smashing into wood and skin and bone. All was smoke and chaos.

Meanwhile, on board the Wolfe, the British crew rushed to recover. They dumped their dead overboard, carried the wounded below deck, cut away at the tangle of debris. And they did it all quickly. Less than fifteen minutes after her masts had tumbled into the water, the Wolfe was ready to go.

But the danger wasn't over yet. Without her full compliment of sails, she was still very vulnerable. The fate of Lake Ontario still hung in the balance. So Commodore Yeo turned the Wolfe around, let the wind fill what was left of her tattered sails, and then raced west as fast as she could go. The rest of the British fleet turned and followed. They headed straight for the end of the lake, toward Burlington Bay, toward safety.

It was a decisive moment for Commodore Chauncey and the Americans. Two of the British ships were momentarily exposed — they could be captured. The Master Commandant of the Pike — a guy called Arthur Sinclair, great-grandfather of the writer Upton Sinclair — begged the Commodore to forget about the Wolfe and take the other ships instead. Capturing even one or two of the British vessels would be a major victory. But Chauncey had a bigger prize in mind. Immortality was within his grasp; he could taste it. This was the day he was going to defeat the entire British fleet on Lake Ontario. He wasn't going to be distracted by a smaller prize. "All or none!" he declared, ordering his fleet to sail west, to chase down the British squadron and defeat them.

The race was on. 

For the next hour and a half, all sixteen ships sailed west as fast they could, speeding across twenty-five kilometers out in the water south of Oakville. As the afternoon wore on, a storm began to gather. The sky darkened. The waves got bigger. The wind picked up, blowing in hard from the east, filling the sails of the ships, pushing them ever-faster as they raced toward the western end of the lake.

From shore — not just along the Canadian beaches, but also far over on the American side — people strained to follow the movements of the distant ships as they jockeyed for position. Some joked that it was like watching a yacht race. And so the battle got its name: The Burlington Races.

USS General Pike
The Wolfe was in rough shape, but she was still fast. And so was the rest of the British fleet. The Americans struggled to keep up. It was only the Pike who managed to stay close enough to keep the British within range of her guns. They echoed out across the lake, blasting away at the British vessels. But the Pike was badly wounded, too. Her masts were damaged. Sails were torn. Rigging was cut to pieces. Some of her guns were so damaged they were completely useless. And she was leaking. The hull had been hit beneath the waves; there was water coming in below deck. The Americans scrambled to pump it out as fast as it was coming in.

"This," Master Commandant Sinclair later remembered, "was the most trying time I ever had in my life."

And then, suddenly, the most deadly moment of the entire battle: one of the big guns near the front of the Pike exploded. The deck was torn apart in an instant. Iron shards flew in all directions, slicing through wood, sails and flesh. The deadly debris was flung all the way back to the stern of the ship. More than twenty American sailors were killed or wounded in the blast.

Still, the Pike sailed on, chasing the British fleet, cannons roaring. But try as they might, the Americans weren't catching up. And they were running out of time. There wasn't much lake left. They were getting closer and closer to Burlington Bay, closer to shore, closer to safety for the British ships.

There are two different stories about what happened next.

The most recent evidence seems to suggest that Commodore Yeo picked a spot to make a stand. He had the British fleet drop anchor near shore — just to the east of Burlington Bay (which we call Hamilton Harbour today). Bunched together with their backs protected by the land, they presented a daunting target. Their cannons were ready. And on shore, there were even more friendly guns nearby.

With the British in such a strong defensive position and the Pike already badly damaged — maybe even in danger of sinking — Commodore Chauncey realized that it was all over. If he fought on, he risked beaching his ships in enemy territory. He'd missed his chance. The American fleet turned and sailed away into the storm.  

HMS Wolfe at Burlington Bay (Peter Rindlisbacher)
But that's not the story we've been told for most of the last two hundred years. In the most famous version of the tale, Commodore Yeo and the British fleet kept sailing straight for Burlington Bay. It was a daring move. The waters at the mouth of the harbour were shallow; the Wolfe would be in danger of running aground, stranded and helpless as the Americans swooped in. But at the very last moment, riding the crest of the storm surge, the Wolfe swept dramatically into the bay and into safety. The Americans had no choice but to turn away. The moment has been immortalized in paintings and textbooks, even on the historical plaque overlooking the bay — until it was updated just a couple of years ago.

Either way, the British fleet had survived.

That night, anchored safely inside the harbour, the tired sailors got to work. In the cold, wind and rain, they rushed to repair the Wolfe and the other battered ships as quickly as possible. The injured men were treated for their wounds. The dead — those who hadn't already been tossed overboard — were sewn up inside their hammocks and buried at sea. The work continued all through the next day and into the following night. One man climbing the mast of the Wolfe lost his footing and tumbled to his death. And still the crews worked: it would be another two days before the fleet was ready to return to the lake.

Of course, there were more terrible, bloody days to come. Thousands of people died on both sides of the war. Others returned home wounded, many deeply scarred by the things they had seen and done. Just a week after the Burlington Races, Tecumseh — the famed leader of the First Nations confederacy — was killed in battle against the Americans. That same day, Commodore Chauncey and his American fleet captured five British ships far on the other side of Lake Ontario. They burned another.

But winter was coming. The sailing season was soon over. The British fleet had survived another year and the Americans still didn't control Lake Ontario. Their invasion up the St. Lawrence River ended in a big defeat. And the very next summer, shipbuilders in Kingston built a new warship that changed everything. It took more than five thousand oak trees, two hundred men and nearly ten months to make the HMS St. Lawrence. She was by far the biggest thing that had ever sailed on the Great Lakes. She boasted more than a hundred guns. Had a crew of seven hundred. She was bigger even than the flagship Admiral Nelson had used to beat Napoleon's navy at Trafalgar. The St. Lawrence was so big and so powerful that she never had to fire a single shot. The Americans just immediately gave up trying. Commodore Chauncey and his fleet were stuck at home for the rest of the war.

It didn't last much longer. On Christmas Eve of 1814, a peace treaty was signed. The War of 1812 was over. The American invasion of Canada had failed.

-----

Lots of the information in this post comes from the late Robert Malcomson's Lords of Lake. You can find it in the Toronto Public Library here. Or buy it here. He wrote more about the Burlington Races on the War of 1812 website here.

The main image of the battle comes via the Toronto Public Library here, which I turned into a collage with this map of York in the summer of 1813 from the Archives of Ontario. The library also has the image of the Brock here. The Royal George I found via the 4GWAR blog here (which apparently also originally found it thanks to the Toronto Public Library). The images of Sir James Yeo and the Pike come via Wikipedia here and here. And Peter Rindlisbacher's crazy-great painting of the Wolfe sweeping into Burlington Bay comes via Eighteentwelve.ca here. Rindlisbacher has a whole book of paintings of the war, which you can buy here

You can read the first-hand reports made by Commodores Yeo and Chaucey in The Naval War of 1812: A Documentary History, Volume II. You can find it in the Toronto Public Library here. Or buy it here. And I got a little bit more info from The Naval War of 1812 by Robert Gardiner, which you can find in the library here or buy here.

Robert J. Williamson details the battle as we now understand it in this very detailed and informative PDF. William R. Wilson shares more about the HMS Sir Isaac Brock and the naval battles of the Great Lakes on the Historical Narratives of Early Canada site here. Eighteentwelve.ca shares more about the ships of the War of 1812 here. And the war on the lakes here.

The Museums of Burlington share story of the Burlington Races and other Burlington connections to the War of 1812 in this PDF — which also has some great diagrams (reproduced from Lords of the Lake) that might help you make sense of the battle.

Wikipedia has more about Yeo here, Chauncey here, Sinclair here, the Wolfe here, the Pike here, the Brock here, the Royal George here, and the St. Lawrence here. The invaluable Dictionary of Canadian Biography Online has more on Yeo here, too.

The Burlington Gazette covers the story behind the updating of the historical plaque here.




A version of this story will appear in
The Toronto Book of the Dead

Coming September 2017 from Dundurn Press
Available for pre-order now