Thursday, August 12, 2010

The 11,000 Year-Old Footprints At the Bottom of Our Lake

Footprints on the bottom of Lake Ontario
During the last ice age, a really, really, really, really big glacier covered pretty much all of Canada and the northern United States, including the Toronto area. When the ice age ended, about 12,500 years ago, the ice sheet gradually melted, receding north until it became nothing more than the remnants that are still hanging out around Baffin Island today.

In our neck of the woods, the water that melted off the glacier formed a giant lake called Lake Iroquois. It filled the basin where Lake Ontario is now all the way up to Davenport Road. The big hill running along the north side of the street is the shoreline of the ancient lake.

Now, the reason Lake Iroquois was so big was that for a while the St. Lawrence River was still blocked by the retreating glacier. The water flowing out of the lake had to go south instead, down the Mohawk River, eventually hooking up with the Hudson before flowing out into the ocean. So when the ice dam blocking the St. Lawrence finally broke, much of the water in Lake Iroquois suddenly rushed out, and what was left was a lake that was way smaller than Lake Ontario. Science-y folks call it Lake Admiralty, and its shoreline was five kilometers south of where our waterfront is now.

That meant that about 11,000 years ago the entire Toronto area was a vast plain of tundra and spruce forest. With the glacier gone, animals moved in. There were mammoths and mastodons, ancient caribou, musk ox and bison, bears and wolves. And with them came the Paleoamericans, who are believed to be the very first humans to ever set foot on this land. They were nomadic hunters with stoned-tipped spears and small settlements throughout the region.

At one point, it seems a family of them walked north up from Lake Admiralty toward what’s now downtown Toronto. They were wearing moccasins, and for at least a few steps, they walked through clay, leaving their footprints behind.

Over the next few thousand years, Lake Admiralty gradually grew, filling with water until it became the Lake Ontario we know today. And those 100 footprints, frozen in that clay, were hidden from view. That is, at least, until 1908 when workers installing a waterpipe on the lake bed just east of Hanlan’s Point discovered them.

It was easily one of the most spectacular archeological finds in Toronto’s history, probably the earliest evidence of humans living here. “It looked like a trail,” a city inspector told the Toronto Evening Telegram. “You could follow one man the whole way. Some footprints were on top of the others, partly obliterating them. There were footprints of all sizes, and a single print of a child’s foot…”

But the city was in a rush. They wanted to build a tunnel and they didn’t want to slow down. So they just poured concrete over the prints and kept going.

-----

I first read about the footprints in HTO: Toronto's Water from Lake Iroquois to lost rivers to low-flow toilets, which is on Google Books, here. And the best article I've found about them is on the Toronto Star's website, here (which is also where the photo's from, though it doesn't seem to show up on the article's page for some reason).

Wednesday, August 11, 2010

Torontoist Interview


Suzannah Showler at Torontoist was kind enough to ask me a few questions recently about the blog and the Dreams Project and my thoughts on the city, which, should you be interested in doing such a thing, can be read right over here.

Tuesday, August 10, 2010

Map: Toronto in 1894

Toronto in 1894

Among the prettiest maps of Toronto is this one from 1894, which covers whats now just the core of the city: from the Exhibition Grounds in the west to the Don River is the east and from the lake to Bloor Street. You can see the full-sized version here.

Monday, August 9, 2010

The Blackburns' Harrowing Escape

King Street in 1846
That's what King Street looked like in 1846, when Toronto was about 50 years old. You can see some of the city's oldest store fronts and, rising above them at the corner of Church, the spire of St. James Cathedral, which would soon burn down and be rebuilt as the church that stands there now. But the reason I Googled around looking for this particular painting is in the middle of the road, painted bright yellow: Toronto's first ever horse-drawn taxi cab. And perched atop it is the man who started the city's first ever cab company, Thornton Blackburn.

Just 15 years earlier, Blackburn had been living in Kentucky as a slave. He and his wife Lucie (or Ruth; there seems to be some confusion) were "owned" by an American judge who planned on selling Lucie down the river into the even-more-brutally-racist Deep South. But before he could, the couple escaped, fleeing up the Ohio River on a steamboat and eventually settling in Detroit.

They lived there in peace for a couple of years, but it didn't last. In 1833, they were tracked down and arrested by slave hunters who planned on shipping them back to their "owner" in Kentucky. Thankfully, that enraged Detroit's African-American community and white Abolitionists. They worked quickly and before long Lucie was free: a woman came to visit her in jail and they switched clothes so that the visitor could take her place while Lucie escaped.

Thornton, however, was shackled, bound and held under heavy guard. It took 400 men storming the prison to break him out and smuggle the couple across the river into Windsor. When Detroit's white bigots retaliated, attacking blacks in the streets, it kicked off Detroit's first ever race riot, which raged for three days and ended with the sheriff being shot and state troopers being called in.

In the aftermath, the governor of Michigan demanded that the Blackburns be extradited from Upper Canada and returned to slavery in the U.S., but the Lieutenant Governor of Upper Canada refused. "A man," he's said to have said, "can't steal himself."

Soon, the Blackburns had settled in Toronto, living in a house on Eastern Avenue at Sackville Street. Our city, of course, had plenty of its own bigots, but it promised to be a much safer place to live: while slave hunters were known to cross the border in search of their targets, there were already stories of Torontonians driving them out of the city once they'd been discovered. 

Thornton Blackburn got a job as a waiter at Osgoode Hall for a while, but soon came up with an idea for his own business. Getting a copy of the plans for Montreal's first horse-drawn taxi, he had another one made for himself. He called it "The City", painted it yellow and red, and used it to start Toronto's first ever cab company. It was a huge success. "The City" would roam our streets for nearly 60 years, from 1834 until Blackburn's death in the 1890s. The cab became such an important icon for the city that the TTC ended up adopting the same red and yellow colour scheme, which they still sort of use to this day. Before long the Blackburns had managed to buy a few other properties around town and used them to help make Toronto a hub for the Underground Railroad, renting their houses out cheaply to other escaped slaves.

-----

After the Blackburns' death, their story was forgotten for nearly 100 years. It wasn't until 1985, when an archeological dig accidentally stumbled across the remains of their house on Eastern, that people started poking around looking for more information. Karolyn Smardz Frost was one of those people, and she wrote a book about the Blackburns called I've Got A Home In Glory Land: A Lost Tale of the Underground Railroad, which I'm thinking I may very well go out and buy as soon as I get off work today. The Star published excerpts from it here and here and somewhere else I can't find. You can also go visit Thornton Blackburn's grave, which rests in the Necropolis cemetery in Cabbagetown.


This post is related to dream
14 The Great Fire
Lucie Blackburn, 1849

Friday, August 6, 2010

Video: Building the CN Tower



It's un-narrated and, at six minutes, a little longer than it really needs to be, but here's some neat raw footage from the CBC's archives on YouTube. It shows a bit of the CN Tower's opening night in 1976 and then some shots of the construction of the very top of the spire, with people pulling over on the side of the Gardiner to watch and take photos, and a few fellows who clearly have a better relationship with heights than I do.

Wednesday, August 4, 2010

The T Dot's First Hanging

It seems that sometime around the turn of the 1800s, when our city was still just a town only a few years old, John Sullivan and Michael Flannery went out one night and got drunk together. Sullivan was an Irish tailor and they called Flannery "Latin Mike" because he liked to recite Latin proverbs, which I guess was a thing back then. At some point their drunk asses must have run out of money, because Latin Mike decided to forge a bank note worth about three shillings so that Sullivan could use it to buy more booze. Shockingly, their plan backfired and while Latin Mike managed to escape and fled to the States, Humphrey Sullivan landed in Toronto's first jail, sentenced to death. Which, you know, seems a little harsh.

The jail was brand new, built on the orders of the slave-owning gambling addict/politician, Peter Russell, who was running the young town while Lieutenant Governor John Simcoe (the dude who founded Toronto) was back in England, slowly dying. The "gaol" was built on King Street, where the King Edward hotel is now (there's a plaque) and as you may have guessed from the drawing above, it was a little wooden building with a log fence. Inside, there was just enough room for three prisoners and it seems that while Sullivan was there it was filled to capacity. Next door to him was John Small, on trial for having recently killed the Attorney-General in the city's first duel. And in the other cell was a Mr. McKnight. When the officials running Sullivan's execution ran into trouble finding someone willing to do the actual executing, it was McKnight they convinced to do it in return for $100 and a pardon.

McKnight, however, was not awesome at hanging people. He screwed up the first attempt. And then the second. By the third, even Sullivan was getting impatient, saying something along the lines of: "McKnight, I hope to goodness you've got the rope all right this time."

He did.

----


A version of this story will appear in
The Toronto Book of the Dead
Coming September 2017

Pre-order from Amazon, Indigo, or your favourite bookseller
There seems to be some confusion about a few of this story's details, like whether John Sullivan's real name might have been Humphrey, but I've mostly cobbled that all together from The Toronto Story and Jarvis Collegiate's startlingly informative website, which are both fantastic. They've also got lots more about Peter Russell and John Simcoe and the city's first duel, which are all so getting their own posts sometime. (Update: I've written the Peter Russell post here.)

Sunday, August 1, 2010

Photo: King Street in 1878

King Street

Here, quickly, just because I like it: a photo of King Street, looking east from Yonge, in 1878. (I found it here, in an amazing online database of old Toronto photos by the Archives of Ontario, which I just accidentally stumbled my way into.)