Showing posts with label upper canada college. Show all posts
Showing posts with label upper canada college. Show all posts

Tuesday, July 23, 2019

Brexit, Eton & The History of Toronto

The most famous boarding school in the world just got a little bit more famous. Thanks to the shocking result of the Brexit referendum, Eton College has been popping up in the news quite a lot in recent years. The posh boarding school is where two of the architects of the mess spent their teenage years. Both former Prime Minster David Cameron and former Mayor of London Boris Johnson graduated from Eton in the early 1980s. And now — three years after the referendum — Boris will become the new Prime Minister, elected as Tory leader on a promise to ram through Brexit no matter what toll it takes on the country.

So if you want to understand the breathtaking, aristocratic entitlement that has led the United Kingdom into self-inflicted disaster, it helps to understand Eton. And in understanding Eton, you can also better understand the history of Toronto — because it's not just where Boris and Dave went, it's where the man who founded our city went, too.

Eton sits on the banks of the River Thames, not far outside London, just across the river from Windsor Castle. It was founded all the way back in the 1400s; King Henry VI started the school as a charity meant to provide free education to the poor.

But oh how things have changed since then. In recent centuries, Eton has made its reputation by catering to the children of the rich and powerful, helping to perpetuate the strict British class system. Yearly tuition can cost as much as the equivalent of $60,000 in Canadian currency. For a long time, the school's official uniform was literally a top hat and tails. (They finally ditched the top hat in the 1960s, but they've kept the tails.) The school is synonymous with the idea of British entitlement: that the children of the country's ruling class should naturally become its next generation of rulers.

Nineteen British Prime Ministers have been students at Eton. Both Prince Harry and Prince William went there, too. So did George Orwell and Aldous Huxley and Percy Shelley and John Maynard Keynes. And if you're counting fictional characters, then so did James Bond and Captain Hook and Lord Grantham from Downton Abbey. 

Eton College
And so, it's not surprising to find that two of today's most powerful Conservative politicians both went to Eton, too. The old Prime Minster, David Cameron (inept champion of Remain), and the new Prime Minister, Boris Johnson (Leave-supporting buffoon), both graduated from Eton in the early 1980s. They say you can trace the roots of their rivalry all the way back there — and with it, some of the very beginnings of the Brexit disaster.

As a student, Boris was older, more popular and more successful than Cameron — things that mattered even more than usual at such an aristocratic school. And since Johnson did better at Eton — and then again when both young men attended Oxford University — they say it drove him nuts that Cameron had risen to greater heights since then. Boris might have been the former Mayor of London, a Member of Parliament, and a newspaper columnist who got paid more than £250,000 last year (or "chicken feed" as he calls it) for writing one article every week — but that, apparently, wasn't enough.

"Yes," Sonia Purnell writes in The Independent, "the fact that Cameron was two years below him at Eton – a terrifically hierarchical school – rankles deeply. As does the fact that it was Boris who shone there, not Cameron. Masters recall Johnson as a remarkable teenager. They do not recall Cameron at all."

According to countless media reports, Boris made it his mission to topple his old friend Dave and take his place as Prime Minster. If that meant joining the Leave campaign... well, that's what he was willing to do — whether or not he actually believed that leaving the European Union was a good idea for Britain.

Meanwhile, some suggest that Cameron's lifelong sense of entitlement — reinforced by his time at Eton — gave him a false sense of his own superiority. Slate describes him as "an establishment man through and through... the sort of person who gets away with too many things and comes to mistake his privilege for innate luck." When given the chance to gamble the future of his country in return for his own personal political gain, he did so. After all, he's been getting his way his entire life. Why would this time be any different? In order to appease the lunatic far-right fringe of his party, Cameron agreed to hold the Brexit referendum, confident that a Leave vote would never actually happen.

Boris and Dave
But when Boris — who is thought to have personally reassured Cameron that he would never support the Leave campaign — betrayed his old friend, things suddenly became much more complicated. Johnson's support gave legitimacy to the Leave faction, even while it descended into absurd lies and bigoted violence. The racists behind Brexit never would have won, according to The Daily Beast, "without the fig leaf of Boris's charm."

The result: a stunning victory for the Leave campaign, an economy in disarray, bigotry and xenophobia on the rise, the murder of an MP, the end of Cameron's career, and scenes of Boris Johnson being booed the moment he poked his head outside his front door. The Old Etonians had suddenly become two of the most hated men in the country they were raised to rule.

At first, it looked like Johnson's plan hadn't even worked: betrayed, in turn, by one of his own supporters (die-hard-Brexiter Michael Gove), Johnson was been forced out of the race to replace Cameron as PM. Theresa May won instead.

But now, Johnson's spectacular self-serving maneuverings have finally paid off: Boris has won the Tory leadership contest to replace May and will take over as the new Prime Minister.

The power of Eton College hasn't just been limited to British politics, either. Thanks to the Empire, the school's reach has historically extended far beyond England's own borders. In Toronto, you can trace Eton's influence all the way back to the founding of our modern city. More than two hundred years before Boris and Dave, there was John Graves Simcoe.

Simcoe went to Eton in the 1760s. And he too bought into its aristocratic vision for Britain. Years later, when he became the first Lieutenant Governor of Upper Canada, he was determined to make that aristocratic heritage an important part of his new province.

Before he sailed for Canada, Simcoe got in touch with another Eton graduate: the famous scientist Sir Joseph Banks. In his letter, Simcoe asked for any advice Banks might be able to offer, and laid out his vision for his new Upper Canadian capital: the city that would eventually become Toronto.

A strict class system, he insisted, would play a vital role. Simcoe didn't trust the general public; they couldn't be allowed to have real power. As a solider, he'd seen the bloody results of the American Revolution with his own eyes — and more recently, he'd heard the terrifying reports coming out of Paris during the French Revolution. In fact, the Reign of Terror began the very same summer Simcoe founded Toronto. In his experience, when the people gained power, they had a nasty habit of beheading the elites. And so Simcoe was determined that his new city would be free from what he called "tyrannical democracy."

"There are inherent defects in the congressional form of Government," he wrote in his letter to Banks, "the absolute prohibition of any order of nobility is a glaring one. I hope to have a hereditary council with some mark of nobility."

John Graves Simcoe
He would never quite get his wish: Toronto never developed an officially aristocratic system like the one they had back home in England. But Simcoe did make sure that power rested in the hands of a few loyal Tory families. For the first few decades of our city's history, families like the slave-owning Jarvis clan kept all of the best government jobs and appointments for themselves and their friends. The habit would eventually earn Toronto's ruling class a derisive nickname: The Family Compact.

With the backing of their British overlords, the Family Compact dominated the Legislative Assembly, blocked all democratic reform, and cracked down on dissent. Anyone who disagreed with the Tory elite or demanded change quickly found themselves subject to threats and intimidation — sometimes even violence or imprisonment.

The Family Compact had no doubt they were meant to be the natural rulers of the province — a sense of entitlement that would look familiar to anyone who has been following Boris and Dave during the Brexit fiasco.

To help ensure that the power of the Family Compact would continue long into the future, they even founded a Torontonian version of Eton. It's still around today: Upper Canada College. The school's own website describes it as being "modeled after the great public schools of Britain [what we call private schools in Canada], most notably Eton College." UCC's job would much be the same as Eton's job on the other side of the Atlantic: training the sons of the rich and powerful to become the new generation of elites.

And it worked. As Wikipedia points out, "The school has produced six lieutenant governors, four premiers, seven chief justices, and four Mayors of Toronto." There have been plenty of other rich and powerful graduates, too, like Michael Ignatieff, Ted Rogers, Galen Weston and Ken Thomson. In Toronto, the Old Boys of Upper Canada College have played something of a similar role to that of the Old Etonians in England.

But not everyone in Toronto was happy with the Family Compact. There was plenty of resentment against the ruling class in those early years. The opposition gained momentum over the city's first few decades, building into a reform movement led by the radical newspaper publisher and first Mayor of Toronto, William Lyon Mackenzie. He was becoming increasingly frustrated by the lack of democracy in Upper Canada. He made appeal after appeal to the British government, but his complaints fell on deaf ears — which was maybe not entirely surprising: nearly all of the British Prime Ministers during that period were Old Etonians themselves.

William Lyon Mackenzie
In the end, Mackenzie finally gave up on trying to find a peaceful solution; after a disappointing trip to London, he became convinced that revolution was the only way to break the Family Compact's grip on power. In 1837, he gathered an army north of Toronto and marched down toward the city with the aim of overthrowing the government.

Even the street the rebels marched down was a reminder of Eton's influence. Simcoe named the biggest road in Toronto after another one of his Old Etonian friends: Sir George Yonge.

In the end, of course, Mackenzie's rebellion failed. Democratic reform came peacefully a decade later under the name of Responsible Government. The leading champion of the cause was the moderate Robert Baldwin, who had been educated by the leader of the Family Compact. And Baldwin was able to convince the British of its value thanks in part to the support of Lord Durham, yet another Eton graduate. Change didn't come to Canada until the people advocating for it were members of the old boys club themselves.

More than a hundred and fifty years later, you can still see some echoes of that seminal divide in the Toronto politics of today. We saw it on stunning display in recent years, when Rob Ford was able to frame his mayoral campaign as a campaign against the "elites" by positioning himself as an outsider and purposefully distancing himself from the traditional, Upper Canada College-style Tories. Those who felt ignored by the establishment voted for Ford in droves. Casting a ballot for an apparent outsider seemed like a rare opportunity to give voice to their anger. Now his brother Doug has done the same, becoming Premier of Ontario.

In 2016, we saw similar emotions lead to similar results in the United Kingdom. The Leave side denounced the experts and vilified the establishment even though the leaders of the Leave campaign were establishment figures themselves. Boris Johnson has made a career out of playing the blond buffoon, a carefully crafted image, trying to seem like a man of the people instead of a millionaire raised in privilege. The Brexiters, much like Ford, managed to convince vast numbers of people that the real cause of their problems was a dastardly combination of expert opinion and immigration. Not, say, the damaging policies those very same Conservative politicians have been hawking for decades: like tax cuts for the rich paid for by service cuts for everyone else. 

Both campaigns were illusions. Rob Ford was a millionaire born into a political family. His policies were the same old Conservative policies that have been hurting the working class for years. His successor, the aptly-named John Tory, is one of the most establishment-friendly politician you could possibly imagine — and in general his policies are usually in line with those Ford was pushing. Even a vote against the establishment led to establishment-friendly policies; they were just served with a side of crack cocaine.
 
Six thousand kilometers and an entire ocean away, angry Britons voted in protest against their own elites, unleashing a wave of bigotry and decimating their nation's economy in the process. They have managed to drive one establishment-friendly leader out of power: Cameron, forced to resign in disgrace, will be remembered as one of the worst Prime Ministers in modern British history. But they replaced him with another contender to that title: Theresa May. And now they've replaced her with Cameron's old schoolmate Johnson, yet another establishment-friendly Tory leader moving into 10 Downing Street, ready to pick up right where the last one left off.  

The Old Etonian is dead. Long live the Old Etonian.

-----

Via Viv Lynch on Flickr





This post was originally published in 2016 — in the week after the Brexit referendum — and has been updated on July 23, 2019 to reflect Boris Johnson's victory in the Tory leadership contest to replace Theresa May.


You can learn more about the connection between the histories of Toronto and England with A Torontonian Historical Map of London here. Read more about Simcoe's vision for Toronto here. And more about Mackenzie's failed mission to London here.

There's a whole dramatized documentary about Johnson and Cameron's early years, "When Boris Met Dave," which you can watch on Vimeo here.

The main image of "Toffs and Toughs" via Rare Historical Photos here.  Photo of Boris and Dave via The Sun. Photo of Eton College by me as part of The Toronto Dreams Project's UK Tour, which explored the connections between the history of Toronto and the United Kingdom.

Tuesday, October 5, 2010

Freezing To Death In Antarctica

Taylor and Wright and the Terra Nova
One of the guys in this photo, I'm pretty sure it's the one on the right, is Sir Charles Seymour Wright. He was born in Toronto in the late-1800s, grew up in Rosedale, went to Upper Canada College, studied physics at U of T and then headed off to England on a scholarship to study cosmic rays at Cambridge.  But while he was there, he met a man who had just returned from Antarctica,  where he had spent two and a half years climbing mountains and glaciers and nearly freezing to death on an expedition with one of Britain's most famous explorers, Sir Ernest Shackleton. They hadn't made it all the way to the South Pole, like they'd hoped to, but they'd gone farther than anyone else ever had before. And soon, there would be a new attempt, led by Sir Robert Falcon Scott, another one of the Empire's great Antarctic heroes.

Wright was determined to be part of Scott's expedition. He applied and when his application was initially rejected, he walked into London to make his case in person. From Cambridge. A hundred kilometers away. This time, he was accepted; when Scott's team sailed south from New Zealand in 1910, Wright was on board as part of the scientific contingent.

But things got off to a rough start. Before their ship, the Terra Nova, had even made it to Antarctica, they ran into storms and got stuck in the ice for twenty days. One of their sled dogs drowned, the pack ponies they'd brought along were weak and dying and not cut out for the cold. When they did finally arrive and started unloading their equipment, some of it sank into the water. And, worst of all, they'd learned that Roald Amundsen, the Norwegian explorer who had been the first to make it through the Northwest Passage, was already there, camped closer to the Pole, planning to beat them to it.

For the next year and a half, Wright and the other men lived out of an insulated hut in some of the coldest, harshest conditions on Earth, preparing for the months-long journey from their camp to the South Pole. Occasionally, some of them would set out across the ice for weeks and months at a time, studying geology and wildlife or laying down supplies along the route they planned to take south. Each trip was an ordeal. There were blizzards and there were dangerous accidents. More dogs and ponies drowned. Some froze to death or keeled over from exhaustion. Back at camp during the winter, the men would try to keep from going crazy in the darkness, giving lectures and playing football in the faint light outside the hut.

Finally, in November of 1911, Scott lead 16 men, including Wright, out onto the ice and headed for the South Pole. His plan was to send men back in teams the closer they got, taking sled dogs and ponies and motorized sledges part of the way. The sledges died within the first 80 kilometers and after running into a blizzard, all the ponies had to be shot. But the men soldiered on, across the ice shelf, up one of the biggest glaciers in the world and onto the Antarctic plateau, which stretched for hundreds of kilometers between them and their goal. Wright and most of the other men, along with the dogs, headed back to replenish the supply drops, while Scott and four others set off on foot to become the first people to have ever stood on the planet's most southern point.

On January 17, 1912, two weeks later and two and a half months after they'd left camp, having traveled 1300 kilometers in that time, the five men made it to the Pole. Amundsen's flag was already there. The Norwegian had beat them by five weeks. They'd lost.

And the return trip would be an even worse disaster. They spent a month trudging back over the plateau and down the glacier, starving, exhausted and severely frostbitten. Toes turned black. Fingernails were lost to the cold. They kept falling. Getting lost. When they reached the bottom of the glacier, one of them collapsed and died.  And after a few more weeks suffering through some of the worst weather ever recorded in that part of the continent, another simply walked out of the tent to die. "I am just going outside," he said, "and may be some time."

Scott and his last two surviving men struggled on for a few more days, but ran into another blizzard just a few kilometers from their supplies. They couldn't go any further. "We shall stick it out to the end," Scott wrote in the last entry in his diary, "but we are getting weaker, of course, and the end cannot be far. It seems a pity but I do not think I can write more. R. Scott. For God's sake look after our people."

It would be Charles Wright, as part of a search party months later, who be the first to spot the tent. Inside, their frozen bodies lay beside their letters, photos and journals. The  survivors buried them in snow, erected a cross and headed back home, to civilization, for the first time in years.

-----

The hut that Wright and the others lived in is still there, full of supplies, nearly a hundred years later. The Scott Polar Research Institute has tons of incredible photos from the expedition, including many of Wright, and some he took himself, here. There's one he took of some pengiuns. And some he took of the other men, surrounded by snow and snow and more snow. Here's what Wright looked like with frostbite. And here's what he looked like standing beside one of the ponies. There's a map of their route to the Pole here. And here's their ship, stuck in the ice. Here are Scott and his men at the South Pole, standing beside Amundsen's tent and flag. A couple of weeks ago, a collection of Wright's photos and other artifacts from the voyage were sold at auction for a crapload of money, which is how I first learned about him. You can read about that, in the Star, here.


This post is related to dream
41 The Waiting Winter
Charles Seymour Wright, 1903