Showing posts with label war of 1812. Show all posts
Showing posts with label war of 1812. Show all posts

Tuesday, March 31, 2015

The Bloody Burlington Races & The War for Lake Ontario

They appeared out of the darkness, looming above the waves. Ten warships sailing across Lake Ontario, far out in the water south of Toronto. They were first spotted at dawn, as the black September night gave way to the light of day, wooden hulls carving through the waves, sails stretching high into the early morning sky. From each of the ships flew the red, white and blue: fifteen stars and fifteen stripes. The American fleet. This was 1813. Toronto was in the middle of a war zone. And it was going to be a bloody day.

The War of 1812 had been going on for more than a year now. With the might of the British Empire distracted by Napoleon, the American conquest of the Canadian colonies was supposed to be quick and easy. Former President Thomas Jefferson promised that it would be "a mere matter of marching." But the British, Canadian colonists and their First Nations allies resisted the invasion at every turn. It wasn't quick or easy at all.

Back then, Toronto was still just the muddy little frontier town of York. But as the tiny new capital of Upper Canada, our city was caught up in an arms race that might decide the fate of the entire war. The Great Lakes were the most pivotal battleground. Controlling the water meant that you could move your troops and supplies wherever you wanted to — while keeping the enemy from doing the same. Both sides rushed to build the most powerful fleets possible. Some of the biggest warships in the world were being built in the shipyards on either side of Lake Ontario. They had crews of hundreds of men; they bristled with dozens of guns. They turned our lake into the scene of countless horrors. They say that when warships met in battle, the results were so gory that some crews spread sand across their decks in order to keep them from getting too slippery. Others painted them red so all the blood would blend in.

HMS Sir Isaac Brock
Just a few months earlier, shipbuilders in Toronto had been hard at work near the foot of Bay Street hammering together the HMS Sir Isaac Brock (named after the British general who died fighting the Americans at Niagara). She was going to be the second biggest ship on Lake Ontario, giving the British control of the water. But there were spies in Toronto — the Americans knew all about the construction. In April, just before the Brock was ready to set sail, the Americans invaded Toronto, hoping to steal the new ship. They won the battle, but the retreating troops burned the Brock before the invading army could get to her.

Still, the advantage on the Great Lakes was swinging dramatically toward the Americans. In early September, they won a stunning victory on Lake Erie. They captured the entire British fleet on that lake, giving them complete control of it. Now, they just needed Lake Ontario: "the key to the Great Lakes." If they won it, they would be able to pull off their grand plan: ship troops up the St. Lawrence River and besiege Montreal. 

So now, the Americans were sailing back toward Toronto. This time, they weren't coming to capture just one ship; they wanted the entire British fleet.

The man in charge was Commodore Isaac Chauncey. He was from Connecticut, but he first made a name for himself fighting pirates off the coast of Tripoli. Back in April, he'd been in charge of the American ships invading Toronto. Now, he was commanding his fleet from the deck of a brand new flagship: the USS General Pike (named after the American general who'd been blown up at Fort York during the invasion). The Pike sailed at the head of a squadron of ten ships — some towed behind the others for extra firepower. The Americans had bigger guns with longer range than their British counterparts. But their ships were also slower and harder to maneuver.

The British squadron was smaller: just six ships. They were commanded by Commodore Sir James Yeo, an Englishman who had been welcomed to Upper Canada as a hero — one of the rising stars of the most powerful navy on Earth. He sailed aboard his own brand new flagship, the HMS General Wolfe (named after yet another dead general: the guy who had died fighting the French on the Plains of Abraham). She was the sister ship of the burned Brock, built in Kingston at the very same time.

Sir James Lucas Yeo
As dawn broke over Lake Ontario that morning, the Wolfe and the rest of the British fleet were just to the west of Toronto — not far from Port Credit. They spotted the Americans in the distance; they were still about a dozen kilometers away.

The battle got off to a slow start. With all that distance between the two squadrons, Commodore Yeo and his men had enough time to sail over to the harbour at Toronto, sending a small boat ashore with an update. Meanwhile, the Americans patiently stalked their prey: they sailed up to a spot south of the islands (just a sandy peninsula back then) and waited. It wasn't until mid-morning that Yeo turned his squadron around and left Toronto, sailing south out into the middle of the water. The Americans followed, chasing the British into the heart of the lake, the wind in their sails. As the sun rose high into the sky, they were steadily making up ground. It wouldn't be long now. Both fleets shifted into single file lines: battle formation. 

It was Yeo and the British who made the first move. A little after noon, the Wolfe suddenly swung around, heading back toward the Americans, trying to slip by the Pike and open fire on the middle of the enemy line.

Commodore Chauncey and the Americans countered. The Pike began to turn too, trying to cut the Wolfe off, drawing closer and closer and closer... until there were only a few hundred meters between them. But as the great bulk of the American flagship slowly swung around, her formidable bank of guns was still facing in the wrong direction. She was exposed.

The Wolfe opened fire. The British guns roared smoke and iron, cannonballs whizzing through the air between the two ships, smashing into the Pike. One British volley after another tore into her. But slowwwwwwly, the Pike swung around. Now, the might of her firepower was finally facing in the right direction: at the Wolfe. Fourteen American cannons burst to life, a wall of white smoke and fire. Back and forth, the two great flagships thundered. Wood burst into splinters. Sails were ripped and torn. Blood spilled onto the decks. On board the Pike, a mast snapped, toppling into the sails below.

And then: catastrophe for the British. One of the masts on the Wolfe came crashing down, pulling a second mast, sails, rigging and weights down with it — they tumbled onto the deck and then over the side into the water. Without them, the Wolfe was in serious trouble. "It was," writes the historian Robert Malcomson in his book, Lords of the Lake, "the danger Yeo had sought to avoid all summer... disaster."

At that moment, it seemed as if everything was lost. The Pike was closing in, the American sailors were reloading their guns, the end was drawing near. "In the battle for control of Lake Ontario," Malcomson writes, "this instant may have been the most pivotal." The Americans were about to win the battle — and with it, the entire lake. The whole war might follow.

The Royal George (in an earlier battle)
It was the Royal George who saved the day. She was the second ship in the British line — and she had finally turned around too. She rushed into danger, sailing right into the line of fire, putting herself between the Americans and the wounded Wolfe and then slamming on the brakes. She opened fire. Again and again and again, she roared, sending a hail of iron death flying into the Pike, buying enough time for the rest of the fleet to join the fight. Ships on both sides sent volley after volley sailing into the air, smashing into wood and skin and bone. All was smoke and chaos.

Meanwhile, on board the Wolfe, the British crew rushed to recover. They dumped their dead overboard, carried the wounded below deck, cut away at the tangle of debris. And they did it all quickly. Less than fifteen minutes after her masts had tumbled into the water, the Wolfe was ready to go.

But the danger wasn't over yet. Without her full compliment of sails, she was still very vulnerable. The fate of Lake Ontario still hung in the balance. So Commodore Yeo turned the Wolfe around, let the wind fill what was left of her tattered sails, and then raced west as fast as she could go. The rest of the British fleet turned and followed. They headed straight for the end of the lake, toward Burlington Bay, toward safety.

It was a decisive moment for Commodore Chauncey and the Americans. Two of the British ships were momentarily exposed — they could be captured. The Master Commandant of the Pike — a guy called Arthur Sinclair, great-grandfather of the writer Upton Sinclair — begged the Commodore to forget about the Wolfe and take the other ships instead. Capturing even one or two of the British vessels would be a major victory. But Chauncey had a bigger prize in mind. Immortality was within his grasp; he could taste it. This was the day he was going to defeat the entire British fleet on Lake Ontario. He wasn't going to be distracted by a smaller prize. "All or none!" he declared, ordering his fleet to sail west, to chase down the British squadron and defeat them.

The race was on. 

For the next hour and a half, all sixteen ships sailed west as fast they could, speeding across twenty-five kilometers out in the water south of Oakville. As the afternoon wore on, a storm began to gather. The sky darkened. The waves got bigger. The wind picked up, blowing in hard from the east, filling the sails of the ships, pushing them ever-faster as they raced toward the western end of the lake.

From shore — not just along the Canadian beaches, but also far over on the American side — people strained to follow the movements of the distant ships as they jockeyed for position. Some joked that it was like watching a yacht race. And so the battle got its name: The Burlington Races.

USS General Pike
The Wolfe was in rough shape, but she was still fast. And so was the rest of the British fleet. The Americans struggled to keep up. It was only the Pike who managed to stay close enough to keep the British within range of her guns. They echoed out across the lake, blasting away at the British vessels. But the Pike was badly wounded, too. Her masts were damaged. Sails were torn. Rigging was cut to pieces. Some of her guns were so damaged they were completely useless. And she was leaking. The hull had been hit beneath the waves; there was water coming in below deck. The Americans scrambled to pump it out as fast as it was coming in.

"This," Master Commandant Sinclair later remembered, "was the most trying time I ever had in my life."

And then, suddenly, the most deadly moment of the entire battle: one of the big guns near the front of the Pike exploded. The deck was torn apart in an instant. Iron shards flew in all directions, slicing through wood, sails and flesh. The deadly debris was flung all the way back to the stern of the ship. More than twenty American sailors were killed or wounded in the blast.

Still, the Pike sailed on, chasing the British fleet, cannons roaring. But try as they might, the Americans weren't catching up. And they were running out of time. There wasn't much lake left. They were getting closer and closer to Burlington Bay, closer to shore, closer to safety for the British ships.

There are two different stories about what happened next.

The most recent evidence seems to suggest that Commodore Yeo picked a spot to make a stand. He had the British fleet drop anchor near shore — just to the east of Burlington Bay (which we call Hamilton Harbour today). Bunched together with their backs protected by the land, they presented a daunting target. Their cannons were ready. And on shore, there were even more friendly guns nearby.

With the British in such a strong defensive position and the Pike already badly damaged — maybe even in danger of sinking — Commodore Chauncey realized that it was all over. If he fought on, he risked beaching his ships in enemy territory. He'd missed his chance. The American fleet turned and sailed away into the storm.  

HMS Wolfe at Burlington Bay (Peter Rindlisbacher)
But that's not the story we've been told for most of the last two hundred years. In the most famous version of the tale, Commodore Yeo and the British fleet kept sailing straight for Burlington Bay. It was a daring move. The waters at the mouth of the harbour were shallow; the Wolfe would be in danger of running aground, stranded and helpless as the Americans swooped in. But at the very last moment, riding the crest of the storm surge, the Wolfe swept dramatically into the bay and into safety. The Americans had no choice but to turn away. The moment has been immortalized in paintings and textbooks, even on the historical plaque overlooking the bay — until it was updated just a couple of years ago.

Either way, the British fleet had survived.

That night, anchored safely inside the harbour, the tired sailors got to work. In the cold, wind and rain, they rushed to repair the Wolfe and the other battered ships as quickly as possible. The injured men were treated for their wounds. The dead — those who hadn't already been tossed overboard — were sewn up inside their hammocks and buried at sea. The work continued all through the next day and into the following night. One man climbing the mast of the Wolfe lost his footing and tumbled to his death. And still the crews worked: it would be another two days before the fleet was ready to return to the lake.

Of course, there were more terrible, bloody days to come. Thousands of people died on both sides of the war. Others returned home wounded, many deeply scarred by the things they had seen and done. Just a week after the Burlington Races, Tecumseh — the famed leader of the First Nations confederacy — was killed in battle against the Americans. That same day, Commodore Chauncey and his American fleet captured five British ships far on the other side of Lake Ontario. They burned another.

But winter was coming. The sailing season was soon over. The British fleet had survived another year and the Americans still didn't control Lake Ontario. Their invasion up the St. Lawrence River ended in a big defeat. And the very next summer, shipbuilders in Kingston built a new warship that changed everything. It took more than five thousand oak trees, two hundred men and nearly ten months to make the HMS St. Lawrence. She was by far the biggest thing that had ever sailed on the Great Lakes. She boasted more than a hundred guns. Had a crew of seven hundred. She was bigger even than the flagship Admiral Nelson had used to beat Napoleon's navy at Trafalgar. The St. Lawrence was so big and so powerful that she never had to fire a single shot. The Americans just immediately gave up trying. Commodore Chauncey and his fleet were stuck at home for the rest of the war.

It didn't last much longer. On Christmas Eve of 1814, a peace treaty was signed. The War of 1812 was over. The American invasion of Canada had failed.

-----

Lots of the information in this post comes from the late Robert Malcomson's Lords of Lake. You can find it in the Toronto Public Library here. Or buy it here. He wrote more about the Burlington Races on the War of 1812 website here.

The main image of the battle comes via the Toronto Public Library here, which I turned into a collage with this map of York in the summer of 1813 from the Archives of Ontario. The library also has the image of the Brock here. The Royal George I found via the 4GWAR blog here (which apparently also originally found it thanks to the Toronto Public Library). The images of Sir James Yeo and the Pike come via Wikipedia here and here. And Peter Rindlisbacher's crazy-great painting of the Wolfe sweeping into Burlington Bay comes via Eighteentwelve.ca here. Rindlisbacher has a whole book of paintings of the war, which you can buy here. 

You can read the first-hand reports made by Commodores Yeo and Chaucey in The Naval War of 1812: A Documentary History, Volume II. You can find it in the Toronto Public Library here. Or buy it here. And I got a little bit more info from The Naval War of 1812 by Robert Gardiner, which you can find in the library here or buy here.

Robert J. Williamson details the battle as we now understand it in this very detailed and informative PDF. William R. Wilson shares more about the HMS Sir Isaac Brock and the naval battles of the Great Lakes on the Historical Narratives of Early Canada site here. Eighteentwelve.ca shares more about the ships of the War of 1812 here. And the war on the lakes here.

The Museums of Burlington share story of the Burlington Races and other Burlington connections to the War of 1812 in this PDF — which also has some great diagrams (reproduced from Lords of the Lake) that might help you make sense of the battle.

Wikipedia has more about Yeo here, Chauncey here, Sinclair here, the Wolfe here, the Pike here, the Brock here, the Royal George here, and the St. Lawrence here. The invaluable Dictionary of Canadian Biography Online has more on Yeo here, too.

The Burlington Gazette covers the story behind the updating of the historical plaque here.




A version of this story will appear in
The Toronto Book of the Dead

Coming September 2017 from Dundurn Press
Available for pre-order now

Thursday, February 7, 2013

How Napoleon Bonaparte Is Indirectly Responsible For One Of The Best Walking Trails In Toronto

The Mast Trail, Rouge Park

Freaking Napoleon. Nobody could beat him. Ever since the beginning of the French Revolution, France had been fighting wars with pretty much every single other big country in Europe. And while Robespierre and his gang of paranoid mass murderers were busy guillotining everybody in Paris, Napoleon was leading the French army to one victory after another. Before long, he had taken over the country, crowned himself Emperor, and built a network of conquests and alliances that stretched from one end of Europe to the other. The only country left to fight was England. So an invasion of England was next on Napoleon's list.

There was just one big, floating, wooden problem: the Royal Navy. The British fleet had ruled the waves for the last 100 years. And they could beat Napoleon. People still talk about how badly Lord Nelson's fleet pwned the French at the Battle of Trafalgar. It left Napoleon's navy in tatters.

But the Emperor did have another way of screwing with the Royal Navy: he could take away their wood.

People in England had been chopping down their forests since the Stone Age. They barely had any left. And it took thousands of oak trees just to build one ship. The masts were especially hard to find — they had to come from big, strong, old-growth pines. The British were having to ship them in from the far north-east corner of the continent, from the towering forests on the shores of the Baltic Sea.

The same Baltic shores that Napoleon now controlled.

In fact, Napoleon now controlled just about all of the shores in Europe — which meant he could seriously mess with the British economy. He declared an embargo. No one was allowed to trade with England. Not France, not Napoleon's allies, not the nations he had conquered, not even neutral countries. If he found anyone trading with the British, he would arrest the Britons and burn all the goods. He even threatened to invade Russia if they didn't agree. And just like that, Napoleon had robbed the Royal Navy of their Baltic masts.

The Mast Trail, Rouge Park
That's where Toronto comes in. While all of this was happening in the early 1800s, our city was still a brand new little frontier town. It was surrounded by ancient forests that had been growing here for thousands of years. They'd occasionally been cut down too — the First Nations cleared land for villages and corn fields — but they'd never suffered anything like the permanent, wholesale deforestation English forests had. There were still woods all over eastern Canada. And they were full of masts.

Napoleon could keep the Baltics from trading with England, but his navy couldn't keep England from shipping wood across the ocean from Canada. All over the Canadian colonies, lumberjacks started cutting down trees. Timber exports went up by something like 1000% in just three years. Tens of thousands of masts headed across the Atlantic.

Some of them came from the forests of Toronto. The woods of the Rouge Valley — now the verrry eastern edge of Scarborough — were very tall and very old. They were home to wolves and bears and cougars and elk, wild beasts roaming beneath enormous white pines — the perfect tree for making masts. Some of them rose twelve storeys above the forest floor.

By then, the mouth of the Rouge River had already seen plenty of history. The very first people to walk along the valley's forest trails had been prehistoric nomadic hunters. They arrived thousands and thousands of years ago, leaving behind traces of their campsites and the rock they chipped into tools. More recently, it had been the First Nations. By the middle of the 1600s, the Seneca had built a village — Ganatsekwyagon — on a high hill overlooking the valley. It was a hub for the fur trade. Famous French explorers Jolliet and Marquette stopped by on their way deeper into the continent. Coureurs de bois came to trade, or to travel up the Rouge in canoes toward Lake Simcoe. One missionary spent a famously harsh winter there, starving and desperate, living off squirrels and chipmunks and eating moss off the base of the trees. Even the Governor of New France once paid a visit to Ganatsekwyagon during his war with the Seneca. His allies, the Mississauga, took it over.

Now, the Rouge Valley was part of the British Empire. And with the Empire at war with Napoleon, it was ax-wielding lumberjacks making trails through those woods. The great old pines came crashing to the ground, were floated down the Rouge to Lake Ontario and then shipped out the St. Lawrence to make the long journey across the Atlantic. They rose again as masts from the decks of British ships fighting the French half a world away.

The mouth of the Rouge River
Napoleon never was able to invade England. Eventually, his embargo broke down. The Russians finally got sick of it and started trading with the British again. Napoleon responded by invading Russia — which was a terrible idea. His army was devastated by the Tsar's scorched earth campaign and the bitter cold of the Russian winter. It was a turning point. Within a couple of years, his empire had crumbled. He was defeated and then exiled... and then escaped, raised another army, and was defeated and then exiled again. This time for good.

But even with Napoleon gone and the embargo lifted, the British still wanted Canadian lumber. The trees kept coming down and the exports kept going up. They doubled and doubled and then doubled again. Soon forestry had taken over from the fur trade as the engine of the Canadian economy. Today, it's still one of our biggest industries.

There are no more lumberjacks in the Rouge Valley, though. The forests growing there today are protected — Rouge Park is slated to become a national park. There are still enormous white pines towering above the forest floor. Some of them have been growing there since those Napoleonic days — the trees that were, at the time, too small for masts. The old logging trail is still there too. It's called the Mast Trail now. Twenty-first century Torontonians and tourists can walk in the same place those lumberjacks did 200 years ago. And where missionaries and explorers, coureurs de bois and First Nations, prehistoric hunters and wild beasts were walking long before that.

-----

P.S. — Those pine trees weren't just used to build ships in England. Before the Napoleonic Wars were over, we'd be building our own warships over here.

That's because Napoleon wasn't the only one with an embargo: the British had one against him too. This meant that neutral countries like the United States were caught in the middle — they were at risk of having their goods seized no matter which side they traded with. Even worse: the English were using the embargo as an excuse to board American ships and arrest any man who was British — or sort of British, or maybe kind of seemed like he might be British and couldn't prove he wasn't — so they could force him to join the Royal Navy and fight the French. Impressment, they called it. And it pissed the Americans off. It was one of the main reasons they declared war in 1812. While the British were still fighting Napoleon in Europe, the Americans invaded Canada.

Suddenly, the Great Lakes were a battlefield too. Control of Lake Erie and Lake Ontario became vitally important — it meant that you could supply your troops on the ground, support them in battle, and move them around. And so, a naval arms race broke out, with both sides rushing to build the biggest and most powerful fleet they could. Canadian lumber was now being used to build warships in Canada.

Toronto played an important role. The main reason the Americans invaded and occupied our city in 1813 was because we were building one of the biggest ships on the Great Lakes — the HMS Isaac Brock — which would have shifted the balance of power in our favour. The Americans were hoping to seize it, but we burned it first. They retaliated by burning down our parliament and other public buildings. A few months later, one of the war's most pivotal naval battles happened just outside our harbour.

But I'll save those stories for a future post.

----- 

P.P.S. — Another kind of interesting note: Lord Nelson. He died fighting Napoleon's fleet at the Battle of Trafalgar, and became a national hero in England. They named the public square in the heart of London "Trafalgar Square" and built a giant column to honour Nelson's memory. It's one of the most iconic landmarks in Britain. But he was also a hero over here. Defeating Napoleon's navy meant the trade route between Canada and England stayed open. People in Montreal were so happy about that they built their own column to honour Nelson in their own public square more than 30 years BEFORE the Londoners built theirs. It's still there in Old Montreal at the top of Place Jacques-Cartier.

Nelson had also played an important earlier role when it came to those Baltic masts. Long before Napoleon's embargo, some of the other most powerful countries in Europe wanted to keep England from being able to trade with the Baltics. So they shut down the narrow channel between Sweden and Denmark — the only way into the Baltic Sea. Nelson was the hero of that episode too. He led the British fleet at the Battle of Copenhagen. When his commander gave him permission to retreat, Nelson famously lifted his telescope to his blind eye so that he couldn't see the signal. He kept fighting and won. It meant that the British got to keep trading with the Baltics right up until Napoleon's embargo.

Oh and Nelson was famous for other stuff too: for having lost an arm in addition to that eye, and for openly living in a sinful threesome with the young Lady Emma Hamilton and her elderly husband William. 

-----

You can learn more about the Mast Trail here and in a PDF here. The Toronto Star has more about the plans to turn Rouge Park into a national park here. There's a whole report on the state of the Rouge watershed, with lots of heritage info, in a PDF here. And there's another one with some info about Rouge Valley heritage and wildlife here. You can learn more about Napoleon's embargo here and here. Or the entire Napoleonic Wars here. The Canadian Encyclopedia has some more information about the Canadian timber trade here. And the federal government has a military heritage website with more information about it here. Meanwhile, Wikipedia's got you covered here if you want to learn about the British timber trade instead. If you'd like to know more about warships on the Great Lakes, head on over here. And Wikipedia also has a little page about the Naval Shipyard, just west of the foot of Bay Street, where the HMS Isaac Brock was being built. You can check that out here.

Oh and photos by me.