Showing posts with label toronto street. Show all posts
Showing posts with label toronto street. Show all posts

Saturday, November 3, 2012

Toronto Street in 1908



Toronto Street was once one of Toronto's most beautiful streets. Here it is in 1908. We're looking north from King, just a couple of blocks east of Yonge. A few of the buildings are still there: the columned building on the very left, which was the city's seventh post office; the old Consumer's Gas Building down near the far end on the right-hand side. Sadly, that gorgeous building facing us at the end of the road isn't one of them. It was Toronto's eighth post office. I wrote a bit more about it a while ago, which you can read here.

Long before this photo was taken, the street had already seen some pretty important history. It was at the corner of Toronto & Court (the side street you can see on the right) that Samuel Lount and Peter Matthews were famously hanged for the role they played in William Lyon Mackenzie's Rebellion in 1837. I wrote lots more about that here.

Wednesday, January 4, 2012

Damn, That's One Fine-Looking Post Office

This was our eighth General Post Office. It was on Adelaide, just a couple of blocks east of Yonge, at the head of Toronto Street. And it was, as you can see in this postcard from the very early 1900s, totally awesome.

That's because it was designed by Henry Langley, one of Toronto's most totally awesome architects. He also built a whole hell of a lot of our most beautiful churches: St. Michael's Cathedral at Church and Dundas; Metropolitan United at Church and Queen; Trinity-St. Paul's at Bloor and Spadina; Jarvis Street Baptist and St. Andrew's on the edges of Allan Gardens. He even did the delicate chapel at the Necropolis cemetery in Cabbagetown, where he's buried on the slopes of the Don Valley alongside the likes of William Lyon Mackenzie and George Brown. And he built plennnnty more than that, too.

Of course, due to people sometimes being stupid, the General Post Office was torn down. That was in 1958, as Toronto was swept by a short-sighted orgy of modernism. It was replaced by the nondescript glass office tower that stands boringly at the head of Toronto Street today.

And it's not alone. The two blocks of Toronto Street, between Adelaide and King, were once two of the most gorgeous blocks in the entire city. But now, just about all of the old buildings you can see in the photo below have been demolished and replaced. One of the few survivors is the impressive columned building on the very left – which just so happens to have been Toronto's seventh General Post Office.

I stumbled across the postcard on Wikimedia Commons here. And learned about the photo of Toronto Street thanks to a Heritage Toronto posts here. There's another photo of the eighth General Post Office here, from the '50s, not long before it was demolished.