Monday, January 30, 2017

Toronto's Founding Purpose: A Haven For Refugees

More than two hundred years ago, the city of Toronto was founded to serve as the new capital of Upper Canada — a province created to be a home for Loyalist refugees forced to flee from the chaos and persecution they faced in the United States after the American Revolution. Today, as our neighbours south of the border turn their backs on the world, it seems especially important to remember Toronto's founding purpose. Many of our city's greatest moments have come when we've opened our arms to welcome those in need of shelter: from the victims of the Irish Famine, to those fleeing the Soviet crackdown after the Hungarian Revolution, to the Syrian refugees of today. And many of our darkest times have come when we've shut our doors on those who needed our help.

I shared some thoughts about refugees and the history of Toronto on Twitter recently, and have turned them into a Storify post here:


Wednesday, January 25, 2017

The Tragic Final Days of Lucy Maud Montgomery


This is where Lucy Maud Montgomery died: the house she called Journey's End. It's on Riverside Drive in Swansea: the west end of Toronto. Montgomery spent her last decade living here, perched high above the Humber Valley as she grew old and wrote the last few sequels to Anne of Green Gables.

Those were dark years for the beloved Canadian writer. "There has never been any happiness in this house — there never will be,” she confessed in her journal. "The present is unbearable. The past is spoiled. There is no future."

She had been suffering from depression for years — and it deepened near the end of her life. She was plagued by mood swings and waves of crippling anxiety, haunted by nightmares and painful memories, beset by headaches, vomiting, shooting pains, and trembling hands. She had difficulty sleeping. At times, she couldn’t concentrate well enough to write. The pills the doctors prescribed only made things worse, and before long she was hooked on them.

Meanwhile, her literary legacy was under attack. Once upon a time, Montgomery's stories had been enjoyed by men, women, boys and girls of all ages — even the Prime Minister of Great Britain sang her praises. But now her work was being dismissed by a new generation of male, modernist critics who claimed her books were too "sugary" to be enjoyed by anyone but little girls, and that her stories were too regional — too Canadian — to have any appeal for a worldwide audience. "Canadian fiction," according to one of Montgomery's harshest and most influential critics, "was to go no lower."

And yet she still kept fighting. Even as her depression deepened, her family life crumbled, and the Second World War broke out, Montgomery acted as a passionate advocate for Canadian authors: giving speeches and readings, imparting advice to young writers, insisting that Canadian stories were worth telling and that Canadian voices were worth hearing. 

It was on a spring day in 1942 that it all finally caught up with her. On the very same day the manuscript of her final sequel to Anne of Green Gables was dropped off at her publisher's office, her maid found Montgomery dead in bed. There were pill bottles on the table next to her along with a sheet of paper that read:

"I have lost my mind by spells and I do not dare think what I may do in those spells. May God forgive me and I hope everyone else will forgive me even if they cannot understand. My position is too awful to endure and nobody realizes it. What an end to a life in which I tried always to do my best."

Her family kept Montgomery's depression and her apparent suicide a secret for more than sixty years, until her granddaughter finally revealed the truth in 2008, hoping to contribute to a more honest conversation about mental illness.

“I have come to feel very strongly,” she wrote in the Globe, “that the stigma surrounding mental illness will be forever upon us as a society until we sweep away the misconception that depression happens to other people, not us — and most certainly not to our heroes and icons.”

Depression — far being from being a sign of weakness or of failure — plagued even one of the most celebrated Canadian authors of all-time.

-----


A version of this story appears in The Toronto Book of the Dead
Out now


Order from Amazon, Indigo, or find it at your favourite bookstore
The Globe and Mail has more about Lucy Maud Montgomery's depression in articles by Irene Gammel here and James Adams here. There's also lots more in Mary Henley Rubio's biography of the author, "Lucy Maud Montgomery: The Gift of Wings," which you can borrow from the Toronto Public Library here.