Monday, May 2, 2016

Dream 22 "The Star Harvest" (William Peyton Hubbard, 1911)

The alderman dreamed of a night when the people of Toronto climbed up onto their rooftops, up to the highest branches of all the trees, up cathedral spires and skyscrapers. He joined them, too, high up the clock tower of City Hall. From there, you could reach the stars with a butterfly net. One swipe through the sky might bring down two or three at a time. They shone a soft, cold blue and were smooth to the touch, perfect and round. All over the city, they were collected in baskets and pillowcases and brought down to earth. They were taken to the sides of the roads, along sidewalks and ditches and lawns, where they were planted in the dirt by the light of the moon. By the time the sun rose, they had sprouted into tall, slender silver birches. They lined every street in graceful rows. And when night came again, those trees unfurled lush blue flowers. Inside each one was a brand new baby star. And all of Toronto glowed.

-----

William Peyton Hubbard was Toronto's first Black alderman — and even served as acting mayor on some occasions. The son of a former slave, he got into politics after saving George Brown (Father of Confederation and owner of the Globe newspaper) from drowning in the Don River. In the early days of electricity, Hubbard was a champion of public ownership of power utilities, teaming up with Sir Adam Beck to bring public power to the city of Toronto and the province of Ontario. 

You can read more about Hubbard on Torontoist here. Explore more Toronto Dreams Project postcards here.

No comments:

Post a Comment