UK TOUR DAY ELEVEN (THE RIVER OTTER): This is the mouth of the River Otter. It's in Devon, part of what they call the West Country, in the far south-west of England. The river has a connection both to the Simcoes — founders of Toronto — and to their family friends, the Coleridges. It also flows through some pretty spectacular scenery.
| The Blackdown Hills |
The Reverend's brother, James Coleridge, was in the army. He served as aide de camp to John Graves Simcoe in the years after the founder of Toronto returned home. Simcoe had been made into a General. And when it looked like Napoleon might invade England, he was put in charge of the defenses for the entire West Country. According to Simcoe's biographers, James Coleridge would climb to the top of a nearby hill every morning to look through his telescope toward Simcoe's house. If there was a towel hanging in the window, it was a signal that Simcoe needed him. And Coleridge would rush to his General's side.
It was a third brother, however, who would go down in history as one of the most famous poets of all-time. Samuel Taylor Coleridge was born in Ottery St. Mary. And so, he grew up on the banks of the Otter. He even wrote a poem about it right around the same time the Simcoes were travelling to Canada.
It's called "To the River Otter" and it goes like this:
Dear native brook! wild streamlet of the West!
How many various-fated years have passed,
What happy and what mournful hours, since last
I skimmed the smooth thin stone along thy breast,
Numbering its light leaps! Yet so deep impressed
Sink the sweet scenes of childhood, that mine eyes
I never shut amid the sunny ray,
But straight with all their tints thy waters rise,
Thy crossing plank, thy marge with willows grey,
And bedded sand that, veined with various dyes,
Gleamed through thy bright transparence! On my way,
Visions of childhood! oft have ye beguiled
Lone manhood's cares, yet waking fondest sighs:
Ah! that once more I were a careless child!
The poem — and the poet's connection to the Simcoes — leaves me wondering what kind of impact Francis Simcoe's years in Canada had on him. Sadly, he didn't live long; he was killed as a young soldier fighting Napoleon in Portugal. But for those brief years, did he remember the Don River or Lake Ontario the same way Coleridge remembered the Otter? The same way children who've grown up in Toronto still do, more than 200 years later?
| The River Otter |
| The Otter Estuary Nature Reserve |
| The Otter Estuary Nature Reserve |
| The Otter Estuary Nature Reserve |
| Otterton |
| Otterton |
| The East Devon Area of Outstanding Natural Beauty |
|
| This post is related to dream 30 The Conference of The Beasts Francis Simcoe, 1796 |
|
| This post is related to dream 01 Metropolitan York John Graves Simcoe, 1793 |
|
| This post is related to dream 34 The Upper Canadian Ball Elizabeth Simcoe, 1793 |













