Tuesday, October 1, 2013

Yonge & Richmond in 1899


This is the north-west corner of Yonge & Richmond in 1899. Today, that corner is home to the Hudson's Bay building — the Bay took it over in the early 1990s after they bought out the old Simpsons department store. Simpsons and Eatons were the two big department stores in Toronto for more than 100 years; their flagship locations stared each other down across Queen Street. But by the end of the 1990s, Eaton's was dead too, bankrupt and bought out by Sears.

You can see a Simpson's sign in the top-left in this photo — the Bay/Simpsons building is actually a complex of buildings and the first of them was built just three years before this photo was taken. The big Art Deco addition that dominates the corner today was added in 1929. It was designed by Chapman & Oxley, the same architectural firm responsible for a bunch old buildings around Toronto, including many of the icons of the lake shore: the Sunnyside Bathing Pavilion, the Palais Royale, the Princes' Gates, the old Maple Leaf Stadium and the Toronto Harbour Commission Building.

Photo via the Toronto Public Library here.

Wednesday, September 18, 2013

Toronto's Lucky Lion: The Story Of One Of Our Most Famous Early Monuments

It was one of Toronto's most famous early monuments — so well-known to locals that many simply called it the Monument. It was erected in 1939, in the opening days of the Second World War, to celebrate the city's newest highway. The beautiful Queen Elizabeth Way would stretch from the Humber River around the bend of Lake Ontario to Niagara Falls. Queen Elizabeth The Queen Mother herself came to open it that summer, on tour with her husband, the stuttering King George VI. (She was the mother of Queen Elizabeth II, better remembered these days as the Queen Mum.) It was the first time a reigning monarch had ever visited Canada — or any Dominion for that matter — a way of rallying the Empire as war with the Nazis loomed.

And so, the new monument would not only celebrate the new road, but also commemorate the royal visit and Canada's role in the Second World War. A tall column would stand at the entrance to the QEW by the mouth of the Humber River, topped by a crown. A relief would portray King George and the Queen. And at the base of the column, there would be a lion sculpted by one of Toronto's most famous and respected sculptors: Frances Loring.

Loring and her life-long partner, Florence Wyle, had come to Toronto in the early 1900s. They'd both been born in the United States and shared a studio in Greenwich Village. They were at home in that neighbourhood's bohemian atmosphere, getting to know their artist neighbours like Georgia O'Keeffe and Gertrude Vanderbilt Whitney. But their parents didn't approve. One day in 1913, Loring's father shut down the studio and offered to move the pair to Toronto. He would be able to keep an eye on them here — and hoped our city's conservative values might rub off on them.

Instead, it was the other way around. The Girls, as they were known, would bring a slice of bohemian life to stodgy Toronto. They eventually settled in a rundown converted church in Moore Park (a block south of St. Clair, a few blocks east of Yonge). The Church would become not just home to the sculptors and their work, but the closest thing Toronto had to the famous art salons in Paris.

Loring and Wyle became friends with the most important artists, musicians, architects and intellectuals in the city. Their Saturday night parties became the thing of legend, going on long into the night, guests warmed by the big red brick fireplace, surrounded by half-finished sculptures and an assortment of cats. The Group of Seven and Sir Frederick Banting, the Nobel Prize-winning doctor who helped discover insulin, were particularly close friends, but the guest lists were long and filled with notable names.

Loring and Wyle in 1914
The Church has been called "the hub of all that was vital and exciting in the Toronto art world of the twenties and thirties... one of the most fascinating gathering places in the country." Their good friend A.Y. Jackson, one of the members of the Group of Seven, called it "the art centre of Toronto... a most colourful place... What wonderful parties they put on!" A young Timothy Findley grew up nearby; his father pointed Loring and Wyle out to him. "One day," his father said, "you will remember those two women, and you will understand how wonderful they are."

Their contributions went far beyond social gatherings. At a time when female sculptors were dismissed and passed over for commissions — they were too frail for such physical work, some claimed — Loring and Wyle not only pioneered the place of sculpture in modern Canadian art, but the place of art in modern Canadian culture. When the Girls first arrived in Toronto, Canadian art was not taken seriously even by Canadians. They played a leading role when it came to changing those attitudes  — even while some Torontonians were busy gossiping about their sexual orientation (which is unclear to this day). Loring and Wyle co-founded several groundbreaking artistic organizations, including the Sculptors Society of Canada and the Federation of Canadian Artists, pushing for the policies that would eventually lead to the creation of the Canada Council for the Arts. Loring in particular dedicated much of her time and energy to public causes and education, a familiar face at meetings and art openings, a familiar voice on the CBC.

By the time the QEW opened, Loring and Wyle were already well-known for their war-related work. During the First World War, they had been commissioned to produce a series of statues about workers on the home front. Those sculptures had made them famous. Since then, Wyle had concentrated on smaller pieces while Loring developed a taste for large, monumental work. Loring was an obvious choice for the lion that would sit at the base of the column on the QEW; Wyle was chosen to carve the much smaller King and Queen in relief.

The Lion was one of the most challenging pieces Loring would ever tackle. The work came with strict, nationalistic requirements. The limestone would have to come from a Canadian quarry even though it was of a lesser quality. And that was only the beginning of the trouble. A stone carver would be required to complete Loring's design, but every stone carver she suggested was rejected. They all had Italian or German heritage; as far as some Canadian government officials were concerned, they were the enemy. In the end, Loring was stuck with an Englishman she had never worked with before — and who resented taking direction from a woman.

Finally, when she discovered the stone carver had made a change to the design of her lion without her permission, Loring fired him on the spot. She would complete the stone work herself, despite the fact that she had never done stone work on that scale before. Already in her 50s, but undaunted, she climbed the scaffolding up the column on an island in the middle of the superhighway, protected from Lake Ontario's bitter November winds by only a thin tarpaulin. As she chipped and chiseled away in the cold for weeks on end, her fingers were seized by arthritis. The ailment would consistently plague her for the rest of her life.

Loring's Lion in 1940
Despite the obstacles, when Loring's work was finally finished, it was a triumph. The sculptor had produced a beautiful, stylized lion rising from a reclining position, snarling and defiant, ready to face the Nazi threat and the brutal travails of the Second World War. Loring was praised for her artistic mastery: "a balance of tension that could be sensed running from the powerful paws to the end of the tail." The great cat has been hailed as "one of the finest pieces of outdoor sculpture in Canada" and "the finest piece of architectural sculpture in the country."

The Lion became a landmark for Torontonians. It was impossible to miss as they drove along the lake shore in and out of the heart of the city. Children were particularly enthralled by the stone beast, keeping an eye out for the big cat as their parents drove along the highway. They called it the Lucky Lion. It was a powerful part of the city's public imagination.

But then came the Gardiner Expressway. Twenty years after the opening of the QEW, the new highway along the lake shore cut a swath through some of Toronto's most recognizable landmarks. The old Dufferin Gate at the CNE was demolished. So was most of the Sunnyside Amusement Park. South Parkdale disappeared. Fort York was barely saved. And with the new highway and a booming population driving more and more traffic toward the QEW, the older highway would need to be expanded. In 1974, it was widened to twelve lanes. The island where the Monument stood was removed. The plan called for the Lion to be demolished.

In response, there was an outpouring of public support for the Monument. Torontonians loved their Lion. In the end, the government relented and promised to save it. But many hoped for more than that: not only did they want the Lion saved, they wanted it to be given a new home where it would remain an important part of Toronto's cultural consciousness. The Globe and Mail published an editorial declaring, "A country which sweeps aside its past and its art for ribbons of concrete is going nowhere of any importance." The Lion, the newspaper argued, should be given "a place of prominence by the Queen Elizabeth Way, or another place of equal prominence."

The sculptor Rebecca Sisler, who had followed in the pioneering footsteps of Loring and Wyle and would later pen their first biography, wrote a letter to the paper. "Surely The Monument represents something rare in the annals of Canadian achievement: a synthesis of artistic excellence, historic significance, and public affection. Is this province so poverty-stricken, spiritually and financially, that funds cannot be allocated to preserve our best-known monument? ... Are there no sites in the core of Ontario's capital where the column and its splendid Lion could be re-erected in the mainstream of everyday life where it can continue to stir public imagination?"

In the end, there was a compromise: the Monument was moved to a nearby location in Casimir Gzowksi Park on the waterfront. It survived — it's still there today — but its importance was greatly diminished. Cars passing on the Gardiner can barely see the tip of it; the Lion is a part of the mainstream of everyday life only for those who pass through that section of the park or pay particularly close attention as they speed by on Lake Shore Boulevard. Over the last few decades, the Lion has faded from the minds of most Torontonians. As have Loring and Wyle.

Their work does live on, however. Their sculptures can be found all over our city — all over Canada, in fact: chiseled into some of our finest buildings, on display in Osgoode Hall and in the Art Gallery of Ontario and in the National Gallery in Ottawa, standing on Parliament Hill, preserved among the facades on the grounds of the Guild Inn in Scarborough, and in the Loring-Wyle Parkette on St. Clair... "They are our immortality," Wyle once said.

Loring and Wyle at the Church, pre-1952
The Church, too, is still there. When Loring and Wyle first moved in, it stood in an orchard north of the city. Now, it's in the middle of the megacity; Mount Pleasant Road roars by just a couple of doors down. The Girls left the building to the Royal Canadian Academy of the Arts when they died, to be used in support of Canadian artists. The Academy, unable to bear the cost of turning it into an arts centre, sold it so they could put the funds to use instead. Some worried the Church would be turned into condominiums or demolished entirely. Instead, it ended up in friendly hands.

The Sniderman family lived nearby. Sam the Record Man himself was a guest at some of Loring and Wyle's legendary parties. His wife Eleanor was a long-time friend of the sculptors; she even commissioned a bust of her likeness to be sculpted by Wyle and put on the labels of the albums released by her record company. Their son, Bobby, grew up as one of the neighbourhood kids who would visit the "Clay Ladies" for a glass of milk and some cookies, a few words about art and kindness to animals, and a lump of clay to take home. When the Church went up for sale, Eleanor Sniderman begged her husband to buy the Church so that it would be saved. And so he did. Bobby Sniderman would marry his wife, Marlie, in front of the big red brick fireplace the very same year the Lion came down off the QEW.

In the decades that followed, the younger generation of Snidermans would continue to live their lives in the Church. When Loring and Wyle's most recent biographer, Elspeth Cameron, visited before the publication of her book in 2007, she found the Church much as the Girls had left it. It had been cleaned up, restored in places, but still preserved, still home to many of the sculptures created there. The busts Loring and Wyle had sculpted of each other were still gazing at each other across the fireplace.

Now, nearly 40 years after the Monument was moved to its current home, the future of another one of Toronto's beloved cultural landmarks is up for debate. And while we decide what to do with Sam the Record Man's spinning neon disks — how and where to preserve the sign, and with it a reminder of the rich musical history of the Yonge Street Strip — there may be a lesson or two to be learned from the Snidermans themselves, from their friends Loring and Wyle, and from that defiant stone lion on the lake shore.

-----

Frances Loring in the Church, 1958
Someday I'll write more about Loring and Wyle and their church. And I'm working on a dream for Loring. But for now, one of my favourite tidbits that didn't make this piece: Loring and Wyle kept chickens, which they named after the members of the Group of Seven. Oh and here's a bit about the  Church before it became their studio from the brilliant Lost Rivers site.

You can learn more about the sculptors in a couple of biographies. You can buy Elspeth Cameron's And Beauty Answers here or borrow it from the Toronto Public Library here. Or buy Rebecca Sisler's The Girls here and borrow it from the library here.

Wednesday, September 11, 2013

Star Trek & Nathan Phillips Square


Twice Toronto has made an appearance in the Star Trek universe and twice it's been thanks to Nathan Phillips Square. When our new City Hall first opened in 1965, Viljo Revell's design was the cutting edge of modernism. The curved concrete and clam dome were the stuff of the future. Even now, they have something of an otherworldly feeling.

The first time Toronto showed up in the Star Trek universe was in 1969. It wasn't on television, though: it was in a silly Star Trek comic book called "The Ghost Planet". Kirk and Spock beam down to a world surrounded by rainbow rings, only to discover that it's been ravaged by war. The city they beam into lies in ruins, but there's Toronto City Hall, still standing. Nathan Phillips Square was the inspiration for the art. Kirk and Spock eventually discover the warlords responsible for the carnage (identical twins both named Justin) who trick the crew of the Enterprise into disabling the rainbow rings (which somehow force the Justins to be peaceful) so they can resume their war against each other. Eventually, the good guys realize what's happening and McCoy projects film of the rings into the planet's atmosphere to trick the Justins into putting down their weapons.

The second time was on Star Trek: The Next Generation — an equally brief appearance. In the episode "Contagion," the crew of the Enterprise investigate the destruction of a Federation ship. It turns out that it was destroyed by an alien probe from the long-dead Iconian race. The Iconians had the technology to travel all around the universe through portals; the probe traveled through a portal on auto-pilot and tried to re-write the programming of the Federation ship, which accidentally blew it up. When Picard and Data and Worf all travel to the deserted Iconian homeworld to investigate, they discover the portal technology. And at one point, the portal cycles through some of the possible destinations — one of which is Nathan Phillips Square.

While some other Iconian probes try to re-write the programming of the Enterprise — and of a nearby Romulan ship — the crew figure out to fix it:

They just reboot the ship's computer.

-----

Nathan Phillips Square was also home to celebrating of Star Trek's 25th anniversary in 1991. George Takei, James Doohan and Nichelle Nichols all came. There's a YouTube video of that here. "I've had great experiences here in this city," Doohan says, "I'll be back here as often as I possibly can. And not only that, I've already made the step to see if I can reserve some seats for the World Series."

 Some people say our City Hall makes a third appearance, too,  in an episode of the original Star Trek called "All Our Yesterdays." But that's not true. I just finishing watching it and it wasn't there — a fact confirmed by the Star Trek wiki. I imagine the confusion is probably caused by the fact that the episode also featured alien portals.

I first learned about the appearance in the Star Trek comic book here. Screenshot via this blog here. And there's a bit more info about City Hall and the Iconians here.

Wednesday, September 4, 2013

Toronto's Coal-Choked Skyline in 1908



Once upon a time, Toronto was a filthy, coal-choked mess. Not that long ago, you couldn't even spend a day out-and-about without coming home with a collar blackened from all the soot in the air. Our buildings were coated with the stuff — Derek Flack, over at blogTO, has a whole post about it and even wonders if that might be part of the reason we were so willing to demolish so much of our heritage: it looked pretty gross. Even after the TransCanada natural gas pipeline came to Toronto in the 1950s, it was a long time before things got cleaned up. According to Flack, it wasn't until the '80s and '90s that our oldest buildings were finally cleansed of our coal-burning past. At the same time, new environmental regulations were introduced as a way of protecting our health — and ensuring that our skyline would never again look like this 1908 shot from the Island.

By the end of 2013, Ontario will shut down the last of our big coal-burning power plants — leaving only one "small backup generator" which will be closed next year. Coal plant closures here and in Québec are reducing carbon emissions by about the same amount that the tar sands are raising them. But smog is still an issue: in 2012, Toronto saw full-day smog alerts on 16 different days.

-----

You can check out more filthy Toronto photos thanks to Derek Flack's post here and another one looking specifically at coal here. I've got another smog-photo post here. The photo was taken by William James, one of Toronto's most important early photographers; Flack's got a post about him here too.

Thursday, August 29, 2013

Dream 06 "The Murderer & His Landlord" (John Boyd, 1908)

John Boyd slept poorly. In a few hours, he would wake, have a small breakfast, spend some time in prayer, and be hanged.

He dreamed that he had escaped from the Don Jail, and was rushing home to his apartment. But just as he slid his key into the lock, his landlord opened the door. "I'm sorry," the old man said, blocking his way. "But you can’t come in."

Boyd tried to shoulder his way by, but the landlord wouldn’t budge. "There’s nothing I can do," he insisted. "They hanged you. Can’t you see? Your lips are blue. Your skin is peeling. There’s an odour. I can’t rent an apartment to a dead man."

Boyd pleaded with him, begged him and threatened him, but the landlord led him out of the building and down the front steps. He took him out into the street and left him there, letting the door lock behind him as he returned up the stairs.

Boyd just stood there, defeated, and waited for the flies.

-----

John Boyd was executed at the Don Jail in 1908 for the murder of a love rival at a restaurant on York Street. You can learn more about his crime, his execution and his executioner from the Toronto Star here. The Globe writes about his remains — now lying in an unmarked grave at St. James Cemetery along with those of 14 other condemned men — here.

Explore more Toronto Dreams Project postcards here.

Thursday, August 15, 2013

Turning The Great Lakes' Biggest Wetland Into The Port Lands



Mostly I'm posting this because Wikipedia has an entire category of photos called "Dredges In Toronto" which I happened to stumble upon. Dredges are the crane-like things people use to dig up the bottoms of bodies of water. Wikipedia has 15 photos of them in Toronto and this is the oldest: from the 1890s. Up until that point, the land that's now the Port Lands at the mouth of the Don River was a big marsh. I'll write a full post about it someday — the Ashbridge's Marsh was the biggest wetland on the Great Lakes and plays a pretty interesting role in the history of Toronto — but for now I'll just mention that by the end of the 1800s, it was polluted as fuck. The nearby Gooderham & Worts Distillery flooded it with waste — including as much as 80,000 gallons of liquid manure a day. The City tried to ignore the problem for years, but eventually the threat of cholera and looming court cases forced them into action. One of the ways they tried to deal with it was by creating the Keating Channel, re-directing the Don into the harbour to the west and Ashbridge's Bay to the east so that the waste would be dispersed more quickly. That's what they're doing with the dredge in this photo: making "the Keating cut".

Eventually, the City decided to fill the marsh in entirely — and with it most of Ashbridge's Bay. Today, the Keating Channel is still there, regularly dredged by the Toronto and Region Conservation Authority to keep it clear. It's far from picturesque, though, and not exactly an ideal habit for wildlife — the sides are lined with concrete. The new plans for the development of the Port Lands will renaturalize the mouth of the river and keep the Channel. The idea is to build a "sustainable mixed-use neighbourhood" around it, so that it "will be dramatically transform[ed] into an upbeat, unique canal destination. It will be lined with public space and traversed by a series of four new bridges for vehicles, transit, cyclists, and pedestrians... It will feature parks and promenades along its edge, water access for boats, plus it will have amenities such as shops and canal-side cafés."

-----

You can learn more about the development plans from Waterfront Toronto here. And more about the old-timey dredging of the Ashbridge's Marsh from the Toronto Public Library website here

Tuesday, August 6, 2013

Simcoe's Vision for Toronto: A City So Awesome It Would Undo the American Revolution

1791. Just ten years earlier, John Graves Simcoe had been fighting on the British side of the American Revolution. He made a name for himself in that bloody war: the unit he commanded never lost a battle, he survived months in an American prison, and he even had a chance to kill George Washington, but ordered his men to stand down rather than shoot the future President as he fled. He had his dark moments too — he was an ardent supporter of the death penalty for desertion and he once ordered the massacre of American rebels in their sleep — but it seems he had a reputation for being "brave, humane and honest." By the time the war was over, Simcoe had established himself as one of the rising stars of the British military.

So when the British decided to create a new province in Canada, they chose John Graves Simcoe to be the first Lieutenant Governor. 

The province of Upper Canada was created in what we now call southern Ontario. While Québec and the Martime provinces were already well-established colonies, the British saw the land to the west as an untamed wilderness. Dismissing the First Nations who already lived here, they figured it would make a perfect new home for those who stayed loyal to the Empire during the war. Many of the Loyalists had been driven from their homes by the American revolutionaries, their lives threatened, their property burned to the ground, forced to flee north to safety. Some of them had been born in the States to families who had lived there for generations. Some had arrived from Europe more recently — about 40% of the earliest Upper Canadians were German. Some were former slaves, promised their freedom in return for fighting against the American rebels. Others were still slaves when they got here.

As Governor, Simcoe would have tremendous power over this new province. He could veto laws, dissolve parliament and hand-pick public servants and an Executive Council. He had ambitious plans to use that power. He didn't just want Upper Canada to be a successful new colony with a thriving new capital: he wanted Upper Canada to undo the American Revolution by the sheer force of its own awesomeness.

He got to work on his plan as soon as he was named Lieutenant Governor in 1791, while he was still back home in England. One of the very first things he did was to write a letter addressed to one of the most famous men in Britain: Sir Joseph Banks.

Banks was a scientist: a renowned and respected naturalist. Twenty years earlier, he had explored the South Pacific with the legendary Captain James Cook, becoming one of the very first Europeans to see Australia and New Zealand. It was Banks who first told Europe about kangaroos, and eucalyptus and acacia trees, along with thousands of other species of plants and animals. After that, he was named President of the Royal Society — a post once held by Sir Isaac Newton — and he was hailed as a national hero.

Simcoe (whose own father had also served with Cook) wanted to bounce his ideas off Banks before setting sail for Canada. So, in his letter, he laid out his vision for the new province and the new city he would build as its capital.

He called this hypothetical future metropolis "Georgina" — in honour of King George III (who had recently recovered from his first bout of mental illness). The city would be built, he hoped, on the banks of the La Tranche River (Simcoe later renamed it the Thames) on the spot where London is now. But that's not what happened. Instead, the new capital would end up being built here, on the northern shore of Lake Ontario. In the end, Simcoe didn't name the city "Georgina" after the King, but "York" after the King's son, the Duke of York. Decades later, it would be renamed according to an old Indigenous name for this place: Toronto.

His plan, in short, was to make our city and our province so undeniably amazing that Americans couldn't help but realize how terrible America was by comparison. They would voluntarily give up their silly notions of independence and beg to be let back into the Empire.

"I would die by more than Indian torture to restore my King and his family to their just inheritance," Simcoe wrote to Banks. "Though a soldier, it is not by arms that I hope for this result... the method I propose is by establishing a free, honourable British Government, and a pure administration of its laws, which shall hold out to the solitary emigrant, and to the several states, advantages that the present form of Government doth not and cannot permit them to enjoy."

As far as Simcoe was concerned, modern democracy was a dangerous idea. He had already personally witnessed the horrors of the American Revolution committed in its name, and now those ideas had spread to France, where an even bloodier and more horrifying revolution was underway. The U.S. seemed destined for more chaos and war. "I mean to prepare for whatever convulsions may happen in the United States," he told Banks. He might be able to lure them back into the fold, or at the very least provide an attractive destination for those Americans who became disillusioned with their own government. The key would be building a peaceful Canadian province with a glorious new capital home to an enviable culture of arts, science, learning and good government.

"[T]his colony," he continued, "(which I mean to show forth with all the advantages of British protection as a better Government than the United States can possibly obtain) should in its very foundations provide for every assistance that can possibly be procured for the arts and sciences, and for every embellishment that hereafter may decorate and attract notice, and may point it out to the neighbouring States as a superior, more happy, and more polished form of Government. I would not in its infancy have a hut, nor in its maturity, a palace built without this design."

He already had some concrete ideas about how to establish this British utopia. His letter to Banks mentions a publicly-funded library "to be composed of such books as might be useful to the colony." Extracts from encyclopedias could be published in newspapers to further public education. The school-system would be an important institution and "a college of a higher class would be eminently useful." There would be an emphasis on scientific learning, too: "I should be glad," he wrote, "to lay the foundation stone of some society that I trust might hereafter conduce to the extension of science."

But he also wanted to restrict what he once called "tyrannical democracy" in favour of a powerful, British aristocracy. "There are inherent defects in the congressional form of Government, the absolute prohibition of any order of nobility is a glaring one," he wrote. "I hope to have a hereditary council with some mark of nobility." There would also be an official state church: the Church of England.

Those, unsurprisingly, would prove to be among the most problematic parts of Simcoe's vision. Our province was supposed to be a British province, our city a British city. And while Simcoe never did establish an official nobility, he did leave behind the Family Compact: a ruling class of Tory Protestants determined to uphold his ideal of a monolithic Anglican state. Those from other cultures who helped to build the colony faced discrimination, intimidation and violence. So did advocates for real democracy. During our city's first 40 years, Anglican priests were the only priests legally allowed to perform marriage ceremonies. Anti-Catholic riots would eventually become a familiar sight on our streets. The Anglican Orange Order would dominate Toronto for more than a century, well into the 1900s.

Still, many of the positive institutions Simcoe imagined in his letter to Banks have played a vital role in the building of our city. The Toronto Public Library has the highest per-capita use of any public library system in the world. King's College was founded in 1827 and later became the University of Toronto. We do have an enviable culture of arts and science. And in the few years he was here, Simcoe laid the foundation for our court system and established trail-by-jury. We still travel along roads he first imagined.

Simcoe never did manage to undo the American Revolution. But even that dream wasn't a complete failure. Upper Canada did attract many American settlers with the promise of a better life. And Toronto has long provided a new home for immigrants from south of the border — whether they're looking for a clean, peaceful city, a stronger social safety net, or the chance to avoid fighting in American wars.

Simcoe's greatest legacy, however, is something he didn't mention in his letter to Banks. One of the first laws he passed in Upper Canada was legislation he championed himself: the abolition of slavery. He wanted to ban it entirely; slave-owners in the Legislative Assembly forced a compromise that saw it phased out instead. Even so, it was the first law to abolish slavery anywhere in the British Empire. Simcoe's new capital would eventually become a terminal on the Underground Railroad, welcoming former slaves to freedom. He might not have been able to convince every American to rejoin the British Empire, but Simcoe did ensure his new province would be a safe haven for the Americans who needed it most.

-----

Image: Oil painting of the foot of Bathurst Street ca. 1796 by Elizabeth Simcoe (via the Toronto Public Library) and a portrait of John Graves Simcoe by John Wycliffe Lowes Forster (via Library and Archives Canada).