Showing posts with label writers. Show all posts
Showing posts with label writers. Show all posts

Wednesday, January 25, 2017

The Tragic Final Days of Lucy Maud Montgomery


This is where Lucy Maud Montgomery died: the house she called Journey's End. It's on Riverside Drive in Swansea: the west end of Toronto. Montgomery spent her last decade living here, perched high above the Humber Valley as she grew old and wrote the last few sequels to Anne of Green Gables.

Those were dark years for the beloved Canadian writer. "There has never been any happiness in this house — there never will be,” she confessed in her journal. "The present is unbearable. The past is spoiled. There is no future."

She had been suffering from depression for years — and it deepened near the end of her life. She was plagued by mood swings and waves of crippling anxiety, haunted by nightmares and painful memories, beset by headaches, vomiting, shooting pains, and trembling hands. She had difficulty sleeping. At times, she couldn’t concentrate well enough to write. The pills the doctors prescribed only made things worse, and before long she was hooked on them.

Meanwhile, her literary legacy was under attack. Once upon a time, Montgomery's stories had been enjoyed by men, women, boys and girls of all ages — even the Prime Minister of Great Britain sang her praises. But now her work was being dismissed by a new generation of male, modernist critics who claimed her books were too "sugary" to be enjoyed by anyone but little girls, and that her stories were too regional — too Canadian — to have any appeal for a worldwide audience. "Canadian fiction," according to one of Montgomery's harshest and most influential critics, "was to go no lower."

And yet she still kept fighting. Even as her depression deepened, her family life crumbled, and the Second World War broke out, Montgomery acted as a passionate advocate for Canadian authors: giving speeches and readings, imparting advice to young writers, insisting that Canadian stories were worth telling and that Canadian voices were worth hearing. 

It was on a spring day in 1942 that it all finally caught up with her. On the very same day the manuscript of her final sequel to Anne of Green Gables was dropped off at her publisher's office, her maid found Montgomery dead in bed. There were pill bottles on the table next to her along with a sheet of paper that read:

"I have lost my mind by spells and I do not dare think what I may do in those spells. May God forgive me and I hope everyone else will forgive me even if they cannot understand. My position is too awful to endure and nobody realizes it. What an end to a life in which I tried always to do my best."

Her family kept Montgomery's depression and her apparent suicide a secret for more than sixty years, until her granddaughter finally revealed the truth in 2008, hoping to contribute to a more honest conversation about mental illness.

“I have come to feel very strongly,” she wrote in the Globe, “that the stigma surrounding mental illness will be forever upon us as a society until we sweep away the misconception that depression happens to other people, not us — and most certainly not to our heroes and icons.”

Depression — far being from being a sign of weakness or of failure — plagued even one of the most celebrated Canadian authors of all-time.

-----


A version of this story will appear in
The Toronto Book of the Dead
Coming September 2017

Pre-order from Amazon, Indigo, or your favourite bookseller
The Globe and Mail has more about Lucy Maud Montgomery's depression in articles by Irene Gammel here and James Adams here. There's also lots more in Mary Henley Rubio's biography of the author, "Lucy Maud Montgomery: The Gift of Wings," which you can borrow from the Toronto Public Library here

Monday, December 17, 2012

Thomas King's Massey Lectures Fucking Rule

Sky Woman & The Great Turtle, Museum of Civilization
The Massey Lectures, in case you're somehow unaware, generally totally rule. Every year they pick some super-interesting person to deliver a series of talks that get broadcast on the CBC. They've had Martin Luther King Jr., Noam Chomsky, Jane Jacobs, Douglas Coupland, Margaret Atwood, Northrop Frye, John Kenneth Galbraith, Stephen Lewis, Claude Levi-Strauss, John Ralston Saul... And in 2003, they had Thomas King

Thomas King has been a writer and editor and professor and photographer and filmmaker and created The Dead Dog Cafe radio show. He even ran for the NDP a couple of elections ago. He got the Order of Canada in 2004. Two of his books have been up for the Governor General's Award. And right now he's got a brand new book out; it's called The Inconvenient Indian: A Curious Account of Native People in North America (you can buy it here or borrow it here; the Globe and Mail reviews it here). The dust jacket calls it "at once a history and a subversion of history" and I just bought it and I can't wait to read it.

I'm especially excited about the book since I just finished listening to those Massey Lectures. They're amazing. Over the course of one week, he gave five different lectures in five different venues in five different cities across Canada: Montreal, Victoria, St. John's, Calgary and Toronto. They're collectively called "The Truth About Stories" and each one of them is great. They're about storytelling and history and Canada and the First Nations.

You can listen to them online here.

Each one of them is about an hour long. The time is very much worth it, but if that strikes you as too much of a commitment, I recommend listening to at least the fifth in the series. It's called "What Is It About Us That You Don’t Like". It's the lecture he delivered here in Toronto — at U of T's Massey College. It's a powerful conclusion.

And a timely one, too — as I write this, the Idle No More protests are gathering strength and Attawapiskat Chief Theresa Spence is about to enter the second week of her hunger strike.

Sunday, October 16, 2011

William Faulkner Drunk In The Cockpit Of A Biplane

William Faulkner

William Faulkner liked to drink. A lot. There's an interview he did with the Paris Review — one of the few interviews he ever gave — where they asked him what he needed in order to be able to write. He answered paper, food, tobacco and whiskey. Emphasis on the whiskey. When big-deal director guy Howard Hawks asked him to write the screenplay for a movie called Road To Glory, Faulkner showed up to the script meeting with a brown paper bag under his arm. As they got down to work, he pulled a bottle of bourbon out of the bag and sliced his finger open trying to unscrew the cap. And as he bled all over the place, instead of, oh say, taking a break, he just dragged a wastepaper basket over to his chair so that he could bleed into it while he kept drinking. Yup. Dude was one badass alcoholic.

The reason Faulkner was into that kind of macho shit seems to have something to do with the fact that he grew up during the First World War. He was in high school in the States when the U.S. got involved, and his brother went off to fight in the trenches in France. Faulkner wanted to fight too, so he dropped out of school and tried to enlist in the army. But he wasn't a tall man, only about 5'5", so he was rejected. For a while, he kicked around, not quite sure what he'd do.

But then he ended up at a party where he met a Canadian officer who had an idea. He figured that Faulkner could sneak into the Royal Air Force by pretending to be British.

Now, it's probably safe to assume that Faulkner was pretty drunk at that party, but this kind of scheme was right up his alley anyway. He loved pranks. He and a friend used to get a kick out of sending famous poems into magazines and collecting the rejection slips. Notes from editors who were unimpressed with, say, "Kubla Khan", writing stuff like, "We like your poem, Mr. Coleridge, but we don't think it gets anywhere much." So Faulkner threw himself full-throttle into trying to learn how to pretend to be British. He worked with a tutor for weeks, turning his iconic Mississippi drawl into an English accent. He grew a moustache because he figured moustaches looked English. He changed the spelling of "Falkner" to "Faulkner" because he figured the letter "u" made his name look English. And he even invented a fictional English vicar he called Mr. Edward Twimberly-Thorndyke who, somehow, sent letters of recommendation from England to the British Consulate in New York City. So when Faulkner showed up in there with his English accent and his English moustache and his English letter "u", they signed him up right away. (Although, to be fair, the British had been fighting the war for three or four years at that point and they were pretty much taking anyone who wasn't already dead yet.)

U of T during WWI
And that's how William Faulkner ended up in Toronto. Our city had been taken over by the war. And by the Royal Air Force in particular. We'd already had the first airfield in Canada (in Etobicoke at Long Branch, down by the lake) and there were others all over the place: Leaside, Wilson and Avenue Road, the Exhibition... A big chunk of the University of Toronto was turned into an aeronautics school. Colleges were turned into the sleeping quarters for recruits. Tents were pitched on the lawns. Biplanes flew around all over the place. It was a pretty freaking great time for flying in Toronto. Our own Billy Bishop was the greatest fighter pilot in the world, facing off against the Red Baron and shooting down more Germans than anyone else. Amelia Earhart worked here as a nurse (at the military hospital at 1 Spadina Crescent, in the roundabout-y thing on Spadina just north of College) and was so inspired by all the flying she saw here that she decided to become a pilot herself.

It all must have seemed pretty badass to a guy like Faulkner, who soon arrived for training. This was only about 15 years after the Wright Brothers' first flight; you had to be pretty brave to get into one of those rickety biplanes on a good day, never mind when Germans were trying to shoot you out of the sky. The average lifespan for a pilot during the war was something like 11 days. Faulkner studied hard, became popular with the other recruits (he regaled them with limericks so dirty that even on the Internet every source I find says they're "unprintable"), and looked forward to the day he'd get to fight in Europe.

But that day never came. On November 11, 1918, while Faulkner was still in training, the war ended. Or as he put it: "The war quit on us before we could do anything about it." Toronto erupted into celebration. People poured into the streets. The mayor declared a spontaneous tickertape parade. Floats marched down King Street; people threw paper and (for some reason) talcum powder into the air. They parked a car on the lawn outside Queen's Park and drove over it with a tank in celebration. And at the Military Aeronautics School at U of T, they gave all the recruits the rest of the day off to go have fun.

Which for William Faulkner, of course, meant drinking.

University College, U of T, during WWI
...and flying. He packed the cockpit of a biplane full of bourbon, climbed in and took off. A lot of historians seem to think that it was the first time he had ever flown alone in his entire life. He started doing tricks. Sweeping 180 degree turns. The difficult Immelmann turn, so dangerous that the German ace it was named after, Max Immelmann, died while doing an Immelmann turn. And then, finally, a huge upside down loop which, according to Faulkner, would have been perfect. Except that right at the bottom a hanger got in the way.

Faulkner's plane smashed through the roof and got lodged in the rafters. For years afterward, the writer would walk with a limp. He'd have a crook in his nose for the rest of the life. But as he hung there upside down in the cockpit, Faulkner was unfazed. He just pulled out some more bourbon and kept drinking.

-----

I originally told this story at the Little Red Umbrella's Variety Spectacular at the Holy Oak Cafe. You can read the Paris Review interview here. And more about Faulkner's time in Toronto here and here and here. Years later, he would team up with Ernest Hemingway to work on the film adaptation of To Have And Have Not, which was the only time two Nobel Prize winners have worked on a movie together. Hemingway also lived here for a while. You can read the story about him that I told at the Little Red Umbrella Variety Spectacular hereAnd there are photos of the event here.

Thursday, August 25, 2011

"O my tiger city!": A Few Neat Paragraphs From Morley Callaghan

Morley Callaghan
Oooh, cool new discovery. Kevin Plummer is one of the two fellows who writes the always awesome Historicist columns over at Torontoist. And it turns out he's also got a new Toronto history blog, Second Drafts, where he shares tidbits that didn't make it into his Torontoist pieces. He's already got some neat stuff up: super-old aerial photographs of the city here; bits about the old Toronto Maple Leafs baseball team here; a photo of Toronto's old downtown slum, The Ward, here. But I think my favourite post so far is a passage written by Morley Callaghan, which I'm going to shamelessly re-post.

I wrote about Callaghan in the very first story I told on this blog. He was a Toronto writer who became good friends with Ernest Hemingway while they were both living here and working for the Star. They were both in Paris in the '20s, too. That's where Callaghan and Hemingway had a famous boxing match which ended the friendship between Hemingway and F. Scott Fitzgerald (You can read my post about it here.) But after that, Callaghan ended up back in Toronto, where he grew old in Rosedale.

These paragraphs come from an essay he wrote in 1954 called "Why Toronto?":

"To the professor from St. Louis who asked me why I lived in Toronto, I tried saying casually, ‘Why, I was born in Toronto.’ For a moment he was silent and I thought I might have found the right easy answer. ‘How odd,’ he said finally. ‘You’re the only writer I know who lives in the place where he was born.’

The English-speaking people of Montreal are pretty much like the people of Toronto, in fact, walking along the Montreal streets I’m always meeting somebody who used to live in Toronto, and they all swear they are much happier than they were in the Ontario Athens; but they look just the same to me and they talk just the same and they have the same ideas and the intellectual structure of their lives was clearly shaped in Toronto and they can’t get away from it.

But they don’t fool me–Toronto is on the mind. The notion that Montreal has a dazzling intellectual life like that of Paris, which makes the intellectual life of Toronto seem pathetically provincial, is a myth.

[...] but the truth is that the English-speaking people of Montreal and Toronto think the same thoughts. This they refuse to believe.

There is one other aspect of the matter. I have tried wandering into other cities, and pressing on to distant shores, and have found after a few weeks in a strange place, the urge to move on grows strong, the old weariness gripping me, makes me believe that each new place will be charming because it is new. Well, a writer can stand only so much of this restless boredom; he will go and on, once he starts wandering, seeking the unexpected scene, the new lovely face, with the charm of novelty always pulling him on and finally wearying him to death. If you stay in Toronto, the longing remains deep in the soul, and since it can’t be satisfied you can’t be wearied, and your mind and your imagination, should become like a caged tiger. O Toronto! O my tiger city!"

You can check out the original post on Second Drafts here and should absolutely head on over here to check the whole blog out.

Thursday, November 11, 2010

Getting Blown To Pieces In The Muck Of Western Belgium

Canadian stretcher bearers

That's what it looked like just outside the town of Ypres, in western Belgium, in the spring of 1915. The Allies had pushed the Germans out of the town after the first few months of the First World War. And to get it back, the Germans were ready to use a new weapon that they only tried once before, unsuccessfully, against the Russians on the Eastern Front. So in late April, they hauled thousands of heavy cylinders toward the Allied lines and opened them, freeing the chlorine gas within. The yellow-gray clouds swept down upon ten thousand French troops, suffocating them, burning away at their eyes and lungs, driving them out of their trenches and into enemy fire. Coughing and frothing at the mouth, dying, panicked, the French fell back in disarray, leaving a gaping hole in the middle of the Allied lines.

But the Germans, surprised at how well their plan had worked, were slow to take advantage of it. And that gave the Canadians the time they needed. Holding urine-soaked cloths over their mouths as feeble protection, they advanced, plugging the hole before the Germans could break through. But thousands died. And then day after day after day they lived in that bombed out hellscape, the skies turned red by the fires burning through the town and the surrounding farms, flashes of exploding artillery shells all around them, the ground shaking, dirt raining down from above, the constant hiss of bullets whizzing by overhead, and, occasionally, the chilling sight of those poisonous clouds silently wafting toward the Canadian lines.

It was after more than a week of this, on the second day of May, that a 22 year-old officer from Ottawa, Alexis Helmer, left his position with another solider to check on some Canadians further down the line. They'd made it only a few steps before a German artillery shell arced down out of the sky. It landed directly on Helmer, blowing him to pieces. The men gathered together whatever parts of him they could find, put them in sandbags and wrapped them with a blanket. That night, in the dark, they buried what was left of him in a small, makeshift cemetery nearby. The chaplain wasn't available, so one of Helmer's friends, John McCrae, performed the service.

McCrae was a surgeon and second in command of the brigade. He'd grown up in Guelph and moved to Toronto as a young man to attend U of T, which is where he learned medicine. While he was here, he joined and eventually commanded our most historied military regiment, the Queen's Own Rifles, was a member of the oldest college fraternity in Canada, Zeta Psi, and even published a couple of poems. He fought in South Africa during the Boer War and when the First World War broke out in 1914, he headed to Europe to fight. While he was at Ypres, he ran a first aid station, tasked with the gruesome chore of treating wounded men in a hole dug out of the bank of a canal, freshly dead bodies periodically rolling down on him from the battle above.

There's some disagreement about the details, but the most common story is that the day after he buried Helmer, McCrae took about twenty minutes to scribble down a few lines in his notebook. He sat on the back of an ambulance parked just outside his first aid station, looking out over the cemetery where he'd laid his friend to rest.  Each grave was marked with a wooden cross,  the ground blanketed with blood red poppies, and in the break between artillery barrages, he could hear birds singing overhead. They say that when he was done, McCrae tore the sheet out of his book and handed it to a solider who had been watching him write. He didn't say a word, just walked away and left the man to read what he'd written:

In Flanders fields the poppies blow
 Between the crosses, row on row,
That mark our place; and in the sky
The larks, still bravely singing, fly
Scarce heard amid the guns below.

We are the Dead. Short days ago
We lived, felt dawn, saw sunset glow,
Loved and were loved, and now we lie,
In Flanders fields.

Take up our quarrel with the foe:
To you from failing hands we throw
The torch; be yours to hold it high.
If ye break faith with us who die
We shall not sleep, though poppies grow
In Flanders fields.

It would take only a few months for the poem to show up in a British magazine, but Canadians would be fighting in the mud and marsh around Ypres for the next three and a half years. They would eventually seize the village of Passchendaele, become, apparently, the first colonial force to push back a major European power on European soil, and die there along with hundreds of thousands of French, German and Commonwealth troops. The fighting in Flanders wouldn't end until the war did.

McCrae survived the battle, but not the war. He died of pneumonia in France. By then his poem was already one of the most famous in the world. And a few months later, just two days before the war finally ended, an American teacher read a copy of it in Ladies Home Journal. She was so touched that she immediately pledged to wear a poppy for the rest of her life—and set to work convincing community groups and veterans' organizations around the world to do the same, every year, and remember.

-----

Also amazing: You can read some of the letters McCrae wrote home to his mother. This site has a bunch of them, but here's an excerpt:

"[O]ne saw all the sights of war: wounded men limping or carried, ambulances, trains of supply, troops, army mules, and tragedies. I saw one bicycle orderly: a shell exploded and he seemed to pedal on for eight or ten revolutions and then collapsed in a heap -- dead. Straggling soldiers would be killed or wounded, horses also, until it got to be a nightmare. [...] Three farms in succession burned on our front -- colour in the otherwise dark. The flashes of shells over the front and rear in all directions. The city still burning and the procession still going on. I dressed a number of French wounded; one Turco prayed to Allah and Mohammed all the time I was dressing his wound. On the front field one can see the dead lying here and there, and in places where an assault has been they lie very thick on the front slopes of the German trenches." 

The dates and exact locations can be a bit sketchy, but there's a seemingly endless supply of breathtaking photos from Ypres during WWI. You can see what John McCrae looked like here, and what the cemetery, Essex Farm, looked like just after the war here. There's a (very small, I'm afraid) photo of the German chlorine gas canisters here. Here's a photo of German troops advancing through the clouds of gas, with more troops doing the same here, and Frenchmen who've been killed by it here. There's an explosion from a German barrage here and an example of the kind of damage that could be done here.  You'll find a nice collection of photos of Ypres here, including some of the later battle, Passchendaele. There are lots of photos of that, the Third Battle of Ypres; like here and here and here and here and here. Amazingly, some of them are even in colour: Canadians here and here, and some of the most terrifying Germans you've ever seen here. Even just a quick Google image search will turn up dozens more; I could go on linking for hours.

Monday, October 25, 2010

Two Awesome Moustaches Vs. The President Of The United States

Charles G.D. Roberts and his moustache
Once upon a time (by which I mean the late 1800s and early 1900s) stories about intelligent, anthropomorphized animals were all the rage. The trend had been sparked by Darwinism and then took off with the publication of Black Beauty. After that, the classics came quick: The Jungle Book, The Wind In The Willows, White Fang and The Call of the Wild, Beatrix Potter books and the tales of br'er rabbit. And though we don't remember them as well, two of the most famous authors of "animal fiction" were Sir Charles G.D. Roberts and Ernest Thompson Seton. Both were Canadian. Both were incredibly popular writers. And both had awesome fucking moustaches.

Roberts was from New Brunswick and wrote such proudly nationalistic, nature-loving verses that he was hailed as The Father Of Canadian Poetry and known—along with three of his cousins—as one of the four Confederation Poets. Later, he would move to New York, start writing prose, and eventually end up living in Toronto, which is where he spent the last years of his life.

Seton, meanwhile, grew up here, where he developed his passion for nature as a child by exploring the wilderness of the Don Valley back in the days when it really was a wilderness, filled with deer and foxes and salmon. He too would eventually end up in the States, which is where he co-founded the Boy Scouts of America, wrote the first edition of The Boy Scout Handbook and joined Roberts among the ranks of the famous animal authors thanks to books like Lobo, Rag and Vixen and Wild Animals I Have Known.

Ernest Thompson Seton and his moustache
 But not everyone loved those stories. Like, say, John Burroughs. Or the President of the United States. Burroughs was a famous naturalist, the "Grand Old Man of Nature", armed with a beard so awesome it nearly rivaled the Canadians' own facial hair. He attacked Roberts and Seton (along with a couple of other writers who, boringly, had nothing to do with Toronto at all) in an Atlantic Monthly article called "Real and Sham Natural History". Offended by the lack of hard science behind their stories, he accused them of misleading the world's children with tales of clever and compassionate beasts, dubbing the authors, in his old-timey spelling, as "nature fakirs" and denouncing them as "yellow journalists of the woods". 

The piece kicked off a fierce battle. Some of the writers fought back. There were newspaper articles. Magazine features. Book prefaces. A full-page editorial in the New York Times. The "Nature Fakers Controversy" raged on for years, only coming to an end once Burroughs convinced Theodore Roosevelt, the President of the United States himself, to wade in on his side. Though Roosevelt knew Seton, admired Roberts' writing, and admitted it wasn't a good idea for the President to get involved, he wrote two essays condemning the authors' lovable animal stories as "an outrage", "a genuine crime" and "an object of derision to every scientist worthy of the name, to every real lover of the wilderness, to every faunal naturalist, to every true hunter or nature lover."

And that was that. The controversy died down, Burroughs and Roosevelt had won, and the official wisdom declared that animal stories were bad for society. Case closed.

No one ever read The Jungle Book or Black Beauty or The Call of the Wild ever again.

-----

Tuesday, September 14, 2010

Oscar Wilde's First Gay Lover

Robbie Ross

Robbie Ross was born into one of the most powerful families in Toronto. His father was a lawyer, a senator and, for a while, the President of the Grand Trunk Railroad. His mother was the daughter of Robert Baldwin, one of the most important figures in the history of our entire country — champion of Responsible Government and Canadian democracy. But Ross didn't get to live in Canada very long. Before he was two years old, his father had died and the family had moved to England.

There, Robbie Ross would soon become one of Britain's most scandalous and controversial figures. He was gay and he didn't hide it, a fact that didn't go over very well in Victorian England, where they were busy passing bigoted laws against such things. The harassment started early — he was bullied in school — and would continue throughout his life: he would be threatened with jail time, dragged into court, demonized in the press and eventually forced to leave the country altogether. During the First World War, an MP even wrote a pair of articles — one of them called "The Cult of the Clitoris," if you can believe it — accusing Ross of being part of a conspiracy of 47,000 treacherous "perverts" helping the Germans to "exterminat[e] the manhood of Britain" by turning Britons gay.

It didn't help, of course, that Ross happened to be sleeping with the most famous gay man in the entire British Empire.

Or the most famous bisexual man, anyway. Oscar Wilde was a husband and  a father when when he first met the 17 year-old Ross. And it seems that up to that point, the writer really had been attracted to his wife. But she was pregnant with their second child in 1886, and as she underwent the whole growing-another-person-inside-your-own-person thing, Wilde got seriously turned off. Disgusted even. And there was the young, attractive Ross, "determined to seduce Wilde" according to at least one biographer and already experienced from his time in boarding school. The two hooked up. Ross moved in. And the pair would remain close for the rest of their lives.

The Canadian stood by Wilde even when things started to go sour. And they did so pretty quickly once the author began an affair with Lord Alfred Douglas. Douglas led Wilde into the seedy Victorian underground of gay prostitutes and brothels. And it was Douglas' screwed up relationship with his crazyass homophobic bully of a father (the oh-so-ironically-titled Marquess of Queensbury), which eventually landed Wilde in jail. When Queensbury left Wilde a poorly-spelled calling card denouncing him as a "somdomite," Wilde sued Queensbury for libel. But when it turned out there was plenty of evidence against him, he was forced to drop the case. In the aftermath,  Ross begged Wilde to flee, but the author ignored him, was arrested, tried and eventually convicted of sodomy and gross indecency.

When Wilde got out after two long, miserable years in prison, Ross was waiting for him with a house in France. And though Wilde would forgive Douglas for his role and see him on and off over the next few years, it was Ross who was with him when he died. And it was Ross who took care of his affairs after his death, securing his legacy by buying back the rights to his works — which the author had been forced to sell during his trial — and stamping out the fake porn which was being published under his name.

For his part, Douglas went off the rails. When he wasn't accusing Winston Churchill of playing a role in an imaginary Jewish plot to assassinate the Secretary of War, he was denouncing homosexuality, attacking Ross, testifying against him in court and declaring that Oscar Wilde was "the greatest force for evil that has appeared in Europe during the last three hundred and fifty years."

-----

As a touching postscript, Robbie Ross' ashes are now at rest inside Oscar Wilde's tomb. And this story isn't the only connection Toronto has to Wilde. He came to town in 1882 as part of a year-long tour of North America that helped cement his growing fame. He lectured at the Grand Opera House  on Adelaide and the old pavilion at Allan Gardens, hated all the ads painted on our buildings, loved University College at U of T, and made fun of our yellow bricks. blogTO has got more about that visit in an article over here.

Thursday, June 3, 2010

Punching Ernest Hemingway Right In The Face

Hemingway in 1923
I sort of get the impression that a lot of people who met him probably wanted to punch Ernest Hemingway in the face at one point or another, but Torontonian author Morley Callaghan was one of the lucky few who actually got to do it.

Apparently, the story goes something like this: The two writers became friends in Toronto in the '20s, while Hemingway was living on Bathurst Street and they were both working for what was then called The Toronto Daily Star. It was as a foreign correspondent for the Star that Hemingway had first lived in Paris and since, drunken lout that he was, he hated the then-still-more-than-a-little-bit-uptight Toronto, it wouldn't be long before he headed back to France

Callaghan was now living there, too, and one night the pair of reporters was hanging out with F. Scott Fitzgerald, having an argument about boxing. Hemingway and Fitzgerald thought Hemingway was good enough to be a professional. Callaghan had his doubts. To settle the argument, Fitzgerald convinced the two to spar while he served as audience and timekeeper.

As it turns out, Hemingway could not have been a professional boxer. Callaghan, though smaller and an amateur himself, was better. Not only did he get to punch Ernest Hemingway right in the face, he knocked him down to the mat.

A moment later the legendary friendship between Hemingway and Fitzgerald was over. Fitzgerald, who had gotten caught up in the action and lost track of the time, exclaimed, "Oh, my God! I let the round go four minutes."

All right, Scott,” Hemingway shot back. “If you want to see me getting the shit knocked out of me, just say so. Only don’t say you made a mistake.”

And that was it; he never forgave Fitzgerald. He was still bitching about it in the last letter he wrote before he killed himself, nearly 40 years later.

Callaghan wrote about it too, in his memoir, That Summer In Paris. And, as if this story hadn't already filled its quota of asshole writers, that memoir was then reviewed in The New York Review of Books by Norman Mailer. The review was called "Punching Papa" and you can read it online right over here.


This post is related to dream
07 The Lake Sturgeon
Ernest Hemingway, 1923