Showing posts with label 1960s. Show all posts
Showing posts with label 1960s. Show all posts

Wednesday, March 4, 2015

Marcel Duchamp & John Cage Play Musical Chess

On a cold winter's night in 1968, a phone rang in an apartment on Spadina Road. The man who answered it was Lowell Cross, an American student at the University of Toronto. He'd come north to write his thesis on the history of electronic music, studying under Marshall McLuhan among others. Soon, he would become known as "the inventor of the laser light show," but he was already experimenting with new technologies — combining electronic music with electronic visuals. One of his multimedia projects had just been featured at Expo '67 in Montreal. He was gaining quite a reputation. That's why his phone was ringing. John Cage was calling.

Cage was the world's most notoriously experimental composer. Cross was a big fan — in fact, Cage featured prominently in his thesis. Now, the composer was calling to ask Cross for help: he needed someone to build a musical chessboard.

At first, Cross said no. He was just too busy; he had a thesis to write. But then Cage said two words that changed his mind:

"Marcel Duchamp."

Duchamp was one of the most famous and controversial artists of... well... ever. When he painted Nude Descending A Staircase (No. 2) as a young man in Paris, even the jury of a cubist exhibition his own brothers were helping to curate refused to show it. ("A nude never descends the stairs," they told him, "a nude reclines.") When the painting finally did appear in public, it was part of one of the most scandalous exhibitions ever: the Armory Show in New York City, which introduced America to modern art for the very first time. There were works by Picasso, Matisse, Manet and Cézanne. But Duchamp's Nude was the biggest attraction. Thousands of people showed up to get angry at it. The New York Times called it "an explosion in a shingle factory."

But lots of other people loved it. The Armory Show inspired New York City's first modern art scene. And before long, Duchamp was a part of it himself: when the First World War broke out, he fled the military patriotism sweeping France in favour of the United States, which was still neutral in those early days of the war.

Fountain
In New York, Duchamp continued his attack on the old, conservative, academy-based art world. When one exhibition promised to display any artwork submitted to them, Duchamp sent them a urinal and called it Fountain. They refused to show it, but it was too late. Just the idea of it — the questions it raised about the definition of art and the artist and the gallery system — was a massive, giant, game-changing idea. A recent survey of five hundred art professionals found the urinal to be the most influential artwork of the twentieth century.

Duchamp wouldn't be in New York for long, though. When the U.S. joined the war, he moved on to another neutral country, heading south to Argentina. He'd spend the next few years living in Buenos Aires. And while he was there, something happened that would change his life forever:

Marcel Duchamp became obsessed with chess.

When he got back to Paris after the war, they say he wasn't even really a practicing artist anymore. Instead, he became an officially-recognized chess master. He wrote columns about the game. He played it so much his frustrated wife once glued his pieces to the board. Duchamp was only about 30, but for the rest of his entire life, until he died at the age of 81, chess would be his overwhelming passion. Not art.

"I have come to the personal conclusion that while all artists are not chess players, all chess players are artists," he announced.

John Cage, by comparison, kinda sucked at chess. But he was pretty good at composing experimental music. He came of age in the generation that followed Duchamp's — and he was deeply influenced by the French artist. "The effect for me of Duchamp's work," Cage once wrote, "was to so change my way of seeing that I became in my way a Duchamp unto myself."

There was, Cage said, "One way to study music: study Duchamp."

And so, inspired by the rebel artist, the young composer set about breaking down the walls of melody, tonality, scale and structure. He opened his music up to chance, using the I Ching and random luck to make decisions about what notes to place where. Duchamp used found objects; Cage used found sounds. His most famous piece, 4'33", was nothing more than four minutes and thirty-three seconds of a pianist not playing the piano, giving the audience a chance to listen to the ambient noise around them instead. When the piece premiered in 1952, even a crowd filled with fans of the avant-garde streamed out of the exits before it was over, muttering angrily. Forty years had passed since Duchamp's Nude, but not all that much had changed.

4'33"
By then, Cage and Duchamp had already met. They'd been introduced by mutual friends and even worked together: Cage composed music for a film Duchamp helped make. But it wasn't until the 1960s that they became friends. As Duchamp grew older, his health began to fail him; Cage realized his time was running out. And so, he came up with an idea to turn his greatest influence into one of his closest friends:

He would ask Duchamp to teach him chess.

The plan worked. At least once a once week for the rest of his life, one of the most revolutionary artists of the twentieth century sat down at a chessboard across from one of the century's most revolutionary composers. And he beat him every single time. "Don't you ever play to win?" Duchamp complained, frustrated by his own dominance. But Cage was just happy to be hanging out with one of his heroes. Besides, the composer had an even bigger victory in mind.

Everyone assumed Duchamp was done with art forever — no one, not even Cage, realized he was secretly working on a piece to be revealed after his death. So Cage found a way to lure him into one final public appearance as an artist. He would turn their usual chess game into a work of art itself.

That's why he called Lowell Cross. Cage needed a chessboard that could turn the moves of the chess pieces into music. It would require the kind of innovative, interdisciplinary design that Cross was known for. Cage already knew about Cross' work; in fact, they'd already met — they'd both contributed to a recent event in New York City billed as the musical equivalent of the Armory Show. Cross was the perfect person to build the chessboard. And as busy as he was, there was no way he could say no to Cage and Duchamp.

Still, there wasn't much time. The big game was only a few weeks away. It would happen in Toronto. Ryerson was about to host something called the Sightsoundsystems Festival — a celebration of art and technology — and the showdown between Cage and Duchamp would be the headlining event, held on the opening night. They would call it Reunion, since the spectacle would bring together a whole team of groundbreaking composers who had worked together before. Cross scrambled to finish the board in time; it wasn't done until the night before the match.

The following afternoon, a wintry Tuesday, March 5, Marcel Duchamp arrived in Toronto. As he checked into his hotel (the Windsor Arms near Bay & Bloor), he was worried. He told a friend he had no clue why he was in Canada. Cage hadn't told him anything, just that they were going to do something at Ryerson that night.

Reunion (photo by Shigeko Kubota)
What he found when he arrived was a surreal scene. Two of the greatest artists of the twentieth century took their seats in the middle of the stage at the Ryerson Theatre, bathed in bright light and the gaze of the audience. Photographers circled around them, shutters snapping; a movie camera whirred. The stage was a mess of gadgets. There were wires everywhere; a tangle of them plugged right into side of the chessboard. A pair of TV screens was set up on either side of the stage. The Toronto Star called it "a cross between an electronic factory and a movie set."

Duchamp was an old man now; he was 80. "A grave, quiet figure in a dark blue suit," the Globe and Mail called him; "his skin had the transparent quality sometimes seen in those who are at once very old and very well preserved." In fact, he only had a few months left to live. But he still played with a quiet confidence in the midst of the electronic chaos, calmly smoking a cigar and drinking wine while he studied the board, his wife Teeny sitting at his elbow with a cigarette. Across from him, his younger opponent anxiously puffed away at the cigarette holder clutched between his fingers. "Cage looked nervous," the Star said, "like a man who knows he's going to lose."

They were, said the Globe, "like figures in a Beckett play, locked in some meaningless game. The audience, staring silently and sullenly at what was placed before it, was itself a character; and its role was as meaningless as the others. It was total non-communication, all around."

It was Duchamp who made the first move. And as the players began to play, so did the music. Cross had rigged each square in the board with a photoresistor — so that every time a chess piece moved to a new square, it blocked the light and sent a signal through the wires.

Those wires were hooked up to an elaborate sound system. There was a series of speakers spread out across the theatre, along with a team of experimental composers armed with strange instruments they'd either made or modified themselves. "Tuners, amplifiers and all manner of electronic gadgetry," according to the Star. As the composers coaxed bizarre noises out of their instruments, the moves on the chessboard decided which sounds were heard and which speakers played them. They were echoed on the TV screens, too, which flickered with scrambled, oscillating images. One of Cross' prerecorded compositions was also added to the mix.

As the game progressed and the positions of the pieces became more complex, so too did the music. The room filled with "screeches, buzzes, twitters and rasps." The peak of the racket didn't last for very long, though. Before the match had started, Duchamp had given Cage a handicap — removing one of his own white knights — but it didn't make much difference. One by one, Cage's black pieces were being removed from the board. And as the pieces disappeared, the music grew simpler in response.

Reunion (photo by Shigeko Kubota)
It was all over pretty quickly. Duchamp took less than half an hour to beat Cage. They didn't even have time to finish their bottle of wine.

A second game followed; this time Cage faced off against Teeny Duchamp. They were much more evenly matched, locked in battle for hours, their stalemate stretching long into the night. The audience gradually grew tired and bored; people trickled out into the cold. After a few hours, there were fewer than ten of them left. Even Duchamp dozed off. By one in the morning, the old artist had had enough. They agreed to call it a night.

Out in the audience someone shouted: "Encore!"

The reviews the next morning weren't much kinder than the initial reviews of Duchamp's Nude or Cage's 4'33". The Star called Reunion "infinitely boring... Among great cultural events of the decade, this wasn't one of the exciting ones..." The Globe agreed: "a case of the blind leading the blind."

But the reviews, of course, weren't the point. The artists had done what they set out to do, what they had both been doing since the very beginning of their careers: breaking down the walls between life and art. It was Lowell Cross who put it best. Reunion, he said, was "a public celebration of Cage's delight in living everyday life as an art form."

Duchamp passed away a few months later. Cage followed him a couple of decades after that. But the memory of their strange chess match lives on. Nearly half a century after the two icons of the avant-garde took to the stage at Ryerson, artists are still performing their work. A version of Reunion's musical chess match was part of the Edinburgh Fringe festival in 2013. A year before that, a Chilean artist mounted his own version at the National Museum of Fine Arts in Santiago. Another version was performed in Oslo that same year. And in 2010, during Toronto's Nuit Blanche, Reunion returned to the very same stage where Duchamp and Cage had battled with queens and knights and bishops — and squeals and buzzes and rasps — all those years ago.

-----

The most invaluable source in all of this was Lowell Cross' own account of Reunion. You can read it in a PDF via JohnCage.org here.

You can also read the Star's reviews (if you have a Toronto Public Library card, I think?) here. And the Globe's here. The Globe's preview is here. And they have a scathing review of another event from the festival here. There's an ad for the festival here.

But William Littler — famous for his balanced reviews — did actually kind of get the point of the event in his review for his Star:

"There really are no objective value judgments to apply... [Cage] sees no valid distinction between art and life, between sounds suitable for making music and the sounds around us... From breaking the barriers between his art and life, the artist moves to the associated task of breaking the barriers between the various art forms... Reunion is a total affirmation, an environment which offers us sights and sounds which claim to be no more than they are... last night at Ryerson, one man's opinion was literally as good as another's."

There are more great photos of the chess match here and here.

I found lots of information about the chess match here and here and here and here and here and in French here. The CBC has a timeline of Cage's Canadian connections here.

Read more about 4'33" here and here. Or about Duchamp's Nude here. And the Armory Show here.

There's a brief biography of Lowell Cross here. And he's got lots of information on his own website, with the time of Reunion covered here.

Sunday, September 28, 2014

The Toronto Sound

This week in my column for the Canadian Music Hall of Fame, I wrote a bit about The Toronto Sound show. It was a landmark in the history of our city's 1960s music scene. A 14-hour showcase of local bands at Maple Leaf Gardens that attracted big label reps from all over the continent. They played a distinct, raw style of rock & roll that became known as "The Toronto Sound". Some of the best bands in T.O. played the show, including The Ugly Ducklings, The Paupers and The Big Town Boys.

You can check out the full story here.

-----

Photo: The 5 Rising Suns play The Toronto Sound show (via Garage Hangover)

Saturday, May 3, 2014

The Torontonian Behind Hair — Plus: The Greatest Canadian Song of All-Time

The end of April and the beginning of May make for a pretty interesting week when it comes to the history of music in our city. And so, there were a couple of Toronto-related events that made this week's edition of my column for the Canadian Music Hall of Fame.

First off: the anniversary of the Broadway debut of the musical Hair. It started its groundbreaking run during this week in 1968. It proved to be the most controversial musical ever — full of pacifism, nudity, swearing and drug use. Some people were so upset, they tried  to shut it down while it was on tour: including someone who bombed the theatre. The Toronto connection? The music — which included iconic 1960s tunes like "Good Morning Starshine", "Aquarius" and "Let The Sunshine In" — was written by Galt McDermot, who went to high school at our very own Upper Canada College. In fact, his dad was the principal.

The second event happened during this week in 1967 when Ian & Sylvia gave a big performance at Carnegie Hall in New York. They had started out as part of the Yorkville folk scene. Their biggest hit, "Four Strong Winds", was recently chosen as the greatest Canadian song of all-time by CBC listeners.

You can read both full stories in my column here.

You can also follow the Canadian Music Hall of Fame on Twitter and like it on Facebook to make sure you catch my future columns.
 

Monday, March 3, 2014

How Toronto Helped Break Up The Beatles

At first, no one believed it was really happening. It sounded too good to be true. The Toronto Rock 'N' Rock Revival Show was going to be a massive, thirteen-hour spectacle in tribute to old-timey jukebox rock & roll. The line-up was going to feature some of the greatest rock stars that had ever lived: a mix, mostly, of old greats from the 1950s and up-and-coming young stars. Little Richard. Chuck Berry. Alice Cooper. Jerry Lee Lewis. Bo Diddley. Chicago. The Doors. Gene Vincent. Junior Walker & The All-Stars. But tickets for the festival hadn't been selling well at all. People in 1969 weren't really all that interested in rock & roll from the '50s. They were into psychedelic rock now; Woodstock had happened less than a month earlier. So it seemed pretty convenient when the rumour started: that John Lennon was going to show up with Yoko Ono, Eric Clapton and The Plastic Ono Band in tow.

Bullllllllllshit. No way they got one of The Beatles. John Lennon hadn't performed at a rock show in front of a big crowd in more than three years — not since The Beatles quit touring. When the rumour started, radio stations refused to believe it. And so did everyone else.

But then, in Detroit, a radio DJ got a hold of a recording of a phone conversation between the organizers of the festival and Yoko Ono's assistant: they were booking the plane tickets from London to Toronto. The DJ played the tape on the air and suddenly, at the very last minute, it seemed as if Lennon might actually be coming. People rushed to buy tickets. In just a few hours on the afternoon of the show, it went from a financial disaster to a sell out.

Still, the ticket holders didn't know the whole truth: even the organizers weren't completely sure Lennon would actually come. The Beatle woke up that morning at home in England, nearly six thousand kilometers away. He'd only known about the show for a couple of days, when he got a phone call from Toronto asking if he and Yoko would be willing to emcee the show. John would get to introduce Yoko to all the rock & roll heroes of his childhood and they would be able to use the show as a chance to promote peace. In fact, it would also become known as the Toronto Peace Festival. This was just a few months after they'd recorded "Give Peace a Chance" in a Montreal hotel room and just a few months before they launched their famous "War Is Over" billboard campaign. Lennon agreed. In fact, he didn't just promise to come, he promised to play.

It really was unbelievable. The Beatles were still the biggest band on Earth — just a month earlier, John, Paul, George and Ringo had finished recording Abbey Road, which would turn out to be one of the greatest albums of all-time. But the end was near. They weren't getting along like they used to: they bitched at each other in the studio, fought over the business of Apple Records, grumbled about the time Ono was spending in the studio. Lennon was looking for a new creative outlet. And the Toronto show would help give him one.

There was, however, a big problem: Lennon didn't have another band. He and Yoko had recorded together under the name "The Plastic Ono Band", but that wasn't a real band at all. It's just what they called anybody who happened to be playing with them. "YOU are the Plastic Ono Band" was their official slogan. That meant Lennon only had a couple of days to put together an entire new band from scratch.

Of course, John Lennon had an easier time finding musicians than most people would. He convinced Eric Clapton (who had played on The Beatles' White Album) to come play guitar. Klaus Voorman (who had been friends with The Beatles since their early Hamburg days and played bass in Manfred Mann) said he would come too. Drummer Alan White (who would later play in Yes) was the final piece: he agreed as soon as he realized it wasn't a prank call — that really was John Lennon on the other end of the phone.

But getting a few musicians together was one thing — actually getting on the plane and going through with his first gig in three years was another. They say Lennon was a nervous wreck. On the day of the show, John and Yoko didn't show up for the band's flight from Heathrow. The plane left for Toronto without The Plastic Ono Band on board.

That was a MAJOR problem for the festival organizers. And not just because of all the angry ticket holders they'd have on their hands if Lennon didn't show up. The promoters were much more worried about the angry biker gang they'd have on their hands.

You see, over the course of the 1960s, a biker gang called The Vagabonds had become a major force in the Toronto rock scene, doing their whole violence and drugs and horrifying misogyny and crime and riding motorcycles thing. They'd managed to sort of, um, "convince" the guys putting the show together that The Vagabonds should be allowed to escort John and Yoko from Pearson Airport (on the outskirts of the city) to Varsity Stadium (downtown, at Bloor & St. George). The Vagabonds arrived in force: 80 bikers, all of them excited to be the honour guard for one of the Beatles. They were not going to be happy if it fell through.

In the end, they say Eric Clapton saved the day. He got on the phone with Lennon and told him in no uncertain terms that if Eric Clapton had to be at the airport lugging around all his gear, so did John and Yoko. Lennon was finally convinced to go through with it. The band was going to be a few hours late, but the bikers were okay with that: they'd go pick up The Doors first and then make a second run. Meanwhile, The Plastic Ono Band finally got a chance to have their first ever rehearsal: on the plane, without amps or drums, struggling to hear themselves over the roar of the engines as they flew across the Atlantic on the way to their very first gig.

The Plastic Ono Band's first rehearsal

 
That wasn't the show's only last minute hiccup, either. Just a few days earlier, the promoters had managed to land another 1960s icon: D.A. Pennebaker. He was the greatest rock 'n' roll documentary filmmaker of, well, ever: the guy who had filmed Bob Dylan in Don't Look Back and made the wildly successful documentary about the Monterey Pop Festival. But there were some last minute money issues in Toronto. Pennebaker arrived at the stadium on the day of the show and started setting up his equipment — even watched as the first acts took to the stage — but he still didn't have permission to film anything. He watched helplessly as Bo Diddley — who was supposed to be one of the centrepieces of the film — began his set.

Finally, the permission came through. As Diddley came out for an encore, the cameras started rolling. So that's how Pennebaker's movie — Sweet Toronto — starts: with the sound of Bo Diddley's electric guitar playing the iconic chords from his massive, self-titled, 1955 hit. When you finally get a good look at Diddley on stage in the film, he's in a suit, guitar in hand, dancing under the hot sun with his backing band. He calls out the refrain and thousands upon thousands of people roar it back to him: "Heyyyyyyy Bo Diddley!" It's enough to give you chills. And the build up to that moment in the film is even more extraordinary: as those first chords repeat themselves over and over again, the footage cuts away to the airport, where John and Yoko and the rest of The Plastic Ono Band are arriving. They find a limousine waiting for them — along with the surprise of 80 enthusiastic bikers. As afternoon turns to dusk, The Vagabonds escort them down the 401 and into the heart of the city.

When they got to Varsity Stadium, John and Yoko headed into the dressing room; they had a few hours to wait before their turn on stage. Meanwhile, the other acts on the bill — egged on by the cameras of one of the most famous documentarians of all-time — were giving some of the most amazing performances of their entire careers.

Robert Christgau, "Dean of American Rock Critics", was there that day. And since he's one of the greatest rock writers ever, I'll defer to him:

Chuck Berry at Varsity Stadium
"The sun was fading... by the time Chuck Berry appeared. Berry is the best all-around showman in rock and roll. He is probably in his forties by now, nobody really knows, and duckwalking across the stage takes more out of him than it once did. But the cameras turned him on. Pennebaker was still contorting himself and shooting wild from the knees and belly, but Berry matched him twist for turn, and did three duckwalks, and mugged shamelessly for the cameras. In what several experienced Berry-watchers adjudged one of his finest shows ever, he stayed on for over an hour, finishing at twilight."

In fact, as the day wore on, it was clear the show was beginning to be a pretty big deal for all of the older performers. Just a decade earlier, they had been some of the biggest — and first — rock stars the world had ever seen. But now, at the end of the '60s, none of them was as popular as they had once been. Straight-up, hard-rocking rhythm and blues had been replaced by psychedelic jams. Rockers had been replaced by hippies. Now that Lennon and Pennebaker had turned the Toronto Peace Festival into something more than just a revival show, those old jukebox stars were taking full advantage. The crowd danced and laughed and sang along. It makes for remarkable footage in Sweet Toronto: those shaggy, long-haired kids of the late '60s, with their big sleeves and big hats, their vests and bare chests, smoking pot and blowing bubbles to old-timey rock & roll, shaking their hips, doing the twist, singing and clapping along to the songs that kids their age had been listening to more than a decade ago, their faces glowing. All smiles.

After darkness descended, Little Richard came out with his bouffant hair do and bright, tight, shiny, silverwhite pants, his shirt covered in mirrors. During "Good Golly Miss Molly," he leaped on top of the speakers, dancing like a disco ball, took his shoes and his necklaces off, and then hurled them all into the crowd. During "Jenny, Jenny" he stripped to the waist, bouncing, sweaty and frantic, twirling his shirt above his head before launching it out into the mass of the audience. "Long Tall Sally" was a blistering, bare-chested frenzy. He played "Tutti Frutti" twice in a row. "Rip It Up" three times. Christgau was blown away: "Little Richard, resplendent in mirrors and pompadour and with makeup covering not only his face but his neck, put on his usual orgy of self-adoration. He was magnificent." The Star called him "absolutely electrifying." The Montreal Gazette called him "rock and roll personified... You name it, he sang it — and it was all just as good live in a stadium filled with long hair and pot smoke as it was in a finished basement with white socks and smuggled beer." As Richard tore through his version of "Keep A-Knockin'," hippies made out on the grass. A Canadian flag waved above the crowd. By the end of the set, he had picked people out of the audience to dance on stage with him. "Ladies and gentlemen, you are looking at the true rock & roll!" he shouted. "The 1956 rock & roll!"

Some critics point to that day as the moment the 1950s became cool again. After appearing on stage in Toronto, the old jukebox stars, some of whom were having trouble getting gigs, started being asked to tour again. Soon, Little Richard was back on the charts; he was featured on albums by young bands like Canned Heat and Bachman-Turner Overdrive. Bo Diddley was opening for groups like The Clash as late as 1979. Jerry Lee Lewis found himself back on the charts, too. And so did Chuck Berry. In fact, he would get his first ever #1 on the Billboard Hot 100 in 1972. Today, 45 years after the Toronto Rock 'N' Roll Revival Show, Chuck Berry, Little Richard and Jerry Lee Lewis are all still touring.

And while the festival was reliving the 1950s, it was also heralding the very beginning of the 1970s.

Alice Cooper played that night too. He wasn't a big name at that point, but the Toronto Peace Festival would prove to be his most famous performance ever. His band appeared in makeup, long hair, leather and ripped stockings, playing their strange, theatrical prog-rock. At the climax of the set, they hurled themselves around the stage, tearing apart the gear, as their instruments screeched and moaned. Cooper kicked a football out into the audience, smashed a watermelon with a hammer and then heaved it, too, out into the crowd. The band broke open a few pillows, filling the air with feathers, and used big tanks of CO2 to blow them out over the audience. And then, well...

Nobody seems to be entirely sure where the chicken came from. Cooper claims that an audience member threw it on stage. Other people say the band brought it with them. Either way, you can see what happened next in Pennebaker's footage of the show: Cooper picked up a live chicken from the stage and launched it out into the crowd. "I figured: it's a bird," he explained in an interview decades later. "I'm from Detroit, I don't know, a chicken's got wings, it'll fly — and I threw it back in the audience figuring it would just fly away. Well, it went into the audience and the audience tore it to pieces."

Alice Cooper's "Chicken Incident"
By the time the newspapers hit stands the next day, some headlines were claiming that Cooper bit the head off the chicken himself and drank its blood. In the morning, he'd get a call from Frank Zappa asking him if it was true. When Cooper explained what had happened, Zappa told him, "Well, whatever you do, don't tell anyone you didn't do it." It is still, to this day, one of the most infamous stories in all of rock & roll history. Alice Cooper's "Chicken Incident" is hailed by many critics as the birth of shock rock.

Meanwhile, John and Yoko and The Plastic Ono Band had been backstage during all of this, waiting for their turn to perform. The tension was eating away at Lennon. It had been so long since he played a real show — and his first time back was going to be in front of some of his biggest musical heroes. "I threw up for hours before I went on," he admitted. (Eric Clapton later suggested that may have had something to do with all the coke Lennon was snorting.)

Finally, at midnight, it was time. The emcee for the night was Kim Fowley — a super-famous radio DJ from Los Angeles — who had an idea he thought might help to calm the Beatle's nerves. He had the stadium lights lowered, so that it was completely dark. And then he asked the crowd to light their matches. As Lennon, all long hair and shaggy beard in a white suit, stepped out onto the stage, he was greeted by a sea of flickering light. Thousands of tiny flames glowed all around the stadium. "It was fantastic," he remembered later. "The lights were just going down. This was the first time I ever heard about this — I'd never seen it anywhere else — I think it was the first time it happened."

He was still nervous, though. "We're just going to do numbers we know," he told the crowd, "you know, because we've never played together before." And then The Plastic Ono Band launched into "Blue Suede Shoes". It was big rock classics like that at the beginning of the set: the songs the band members had heard their heroes sing back when they were young — some of those heroes, the same ones who were now watching from backstage. They were the kind of songs that made Lennon want to start The Beatles in the first place. The kind of songs they started out playing in their earliest days, at the smoke-filled Cavern in Liverpool and in the rough nightclubs of Hamburg in the early 1960s. Back when it was all still fun; before everything got complicated.

It was an emotional moment. Watching from backstage, Gene Vincent had tears streaming down his cheeks. He'd first met Lennon and The Beatles back in those Hamburg days, when the Fab Four were still just starting out and Vincent was already a star thanks to "Be-Bop-A-Lula". The first record Paul McCartney ever bought was a Gene Vincent record. And as The Plastic Ono Band played those old hits, The Beatles road manger noticed the rock & roller crying. "It's marvelous," Vincent told him. "It's fantastic, man." After the show, Lennon says Vincent came up to him. "John, remember Hamburg, remember all that scene?"

John Lennon at the Toronto Peace Festival
But The Plastic Ono Band's set was as much about the future as it was about the past. The experimentation and collaboration which would define Lennon's solo career were on full display. Near the end of "Blue Suede Shoes", Yoko came out, climbed into a white bag and sat down on the stage next to John. At the end of "Money (That's What I Want)", she climbed out and handed him the lyrics. When they started into "Yer Blues", Yoko began to wail into a microphone. "It sounded as if she was crying, like a child, in fear," the Globe and Mail wrote. After a stirring, sing-along rendition of "Give Peace A Chance" — the first big public performance of Lennon's first solo song — the entire second half of the set was centered around Ono's experimental sound-making. "Yoko's going to do her thing all over you," Lennon announced. Then she began to sing the bizarre noises of "Don't Worry Kyoko (Mommy's Only Looking For Her Hand In The Snow)".

Some didn't respond well to Ono's avant-garde howling. One fan told Mojo Magazine, "People were polite. They were bewildered, but everybody knew she was an artist, she'd taken photographs of bums and things like that. We figured whatever she was doing, eventually it would end. But it didn't fuckin end." Ronnie Hawkins was there that night, too; he remembered people being a little less polite. "As hip as everyone there tried to be," he says, "Yoko was too much. 'Get the fuck off the stage,' people started to scream." Some people booed. The Star called it "excruciating... a finger nail scratching over a blackboard."

But Lennon claimed he didn't hear any of that. And Ono won some rave reviews. The Montreal Gazette called her performance "extraordinary... full of real emotion... the stunning effect of Yoko's soaring cries [were] like worlds colliding or the universe blowing apart..." The entire set was recorded and released as an album called Live Peace In Toronto 1969. It broke the Top 10 on the Billboard chart and went gold. In Rolling Stone, Greil Marcus called it, "more fun than anything [Lennon]'s done in a long while, with a great deal more vitality than Abbey Road, in fact."

The set ended with the haunting shrieks of Ono's "John, John, Let's Hope For Peace." As the song came to a close, Lennon leaned his guitar up against an amp, screaming feedback while Clapton coaxed strange noises from his own instrument. They left Yoko on stage, squawking like a bird into the Bloor Street night.

Lennon was thrilled with the way things had gone. "I can't remember when I had such a good time," he said later. "It gave me a great feeling, a feeling I haven't had for a long time." He'd been nervous and uncertain about the next stage in his life. But the show in Toronto had given him confidence. Now, he knew for sure he wanted to return to the stage. And it wouldn't be with the band he'd been part of since he was 15 years old. No less of an authority than Ringo Starr cites the Toronto Peace Festival as the turning point: John Lennon was going to leave The Beatles.

Fans at the Toronto Peace Festival
So the final seeds had already been sown by the time the last act of the Rock 'N' Roll Revival Show finally took the stage. The Doors were past their peak, too. Jim Morrison had less than two years left to live. He was already awaiting trial for indecent exposure charges; in a few weeks, he'd be arrested again for being a drunken mess on an airplane. He was run down, ravaged by alcoholism. He'd grown a beard, gained weight; one fan remembers the sound of his knees cracking as he moved around the stage that night.

But the band played a mesmerizing set. "When The Music's Over." "Break On Through." "Light My Fire." In the Toronto Daily Star, Jack Batten gushed, "Jim Morrison has so much presence, so much electricity, that he makes his rock contemporaries resemble a collection of wax dummies..." Peter Goddard agreed in the Toronto Telegram: "With [Morrison] there was a sense of melodramatic theatrics, of sensuality and poetry, of sheer power belching electronically... With an icily sleepy stare and a slow amble, he was a force to be reckoned with..."

Before long, there was only one song left to go. As Ray Manzarek's keyboards hummed darkly, the tambourine shook and the bass plucked away. Morrison leaned into the microphone, remembering how his own life had been changed by rock & roll. He shared his memories with the audience between languid, drugged-out pauses. "You know, I can remember when I was... in about the seventh or eighth grade... I can remember when rock & roll first came on the scene... it burst open whole new strange catacombs of wisdom... And that's why for me this evening it's been... really a great honour... to perform on the same stage... with so many illustrious musical geniuses."

And then, Jim Morrison began to sing. It was the only song you could imagine ending the festival with. The only song you could imagine ending the decade with, really:

"This is the end, beautiful friend. This is the end, my only friend, the end. Of our elaborate plans, the end. Of everything that stands, the end..."

It was nearly two in the morning by the time the Toronto Rock 'N' Roll Revival Show finally came to an end. In the thirteen hours since the first act took the stage at Varsity Stadium, a lot of things had changed. The '50s had been revived. The biggest band of the '60s had entered their final days. Shock rock had been born. And so, too, maybe, had the tradition of an audience lifting their matches and lighters — and someday their smartphones — into the air. It's no wonder Rolling Stone once called the Toronto Peace Festival the second most important event in the history of rock & roll. 

A week later, John Lennon told The Beatles he was done. The greatest band of all-time was breaking up. The 1960s were over. The 1970s were ready to begin.
 
-----



More of The Plastic Ono Band at the Toronto Rock 'N' Roll Revival Show: the entire set.




More Little Richard at the Toronto Rock 'N' Roll Revival Show: "Lucille", "Tutti Frutti", "Rip It Up", "Keep A-Knockin'", "Hound Dog", "Jenny Jenny", "Long Tall Sally".




More Jerry Lee Lewis at the Toronto Rock 'N' Roll Revival Show: "Hound Dog", "Mean Woman Blues", "Don't Be Cruel", "Whole Lotta Shakin' Goin' On", "Mystery Train", "Jailhouse Rock".




More Chuck Berry at the Toronto Rock 'N' Roll Revival Show: the entire set.

 You can listen to the bootleg recording of the full Doors set on YouTube here. You can watch Alice Cooper's interview about the chicken incident here. And some poor-quality footage of the set here.

You can buy the Sweet Toronto film here. A couple of other documentaries were made from Pennebaker's footage, too. You can buy Little Richard: Live At The Toronto Peace Festival 1969 here, and Chuck Berry: Live At The Toronto Peace Festival 1969 here (or borrow it from the Toronto Public Library here). You can also buy The Plastic Ono Band's 1969 Live Peace In Toronto album here.

You can read the full review of the show from Robert Christgau here. And Greil Marcus' Rolling Stone review of The Plastic Ono Band's live album from 1970 here. You can also read the full reviews from the Star, Telegram and Gazette thanks to Flickr user TheWizardofAz.

Over at blogTO, Chris Bateman has a post about the festival called "That Time Toronto Saved Rock & Roll".

I got some of the info about the cocaine, Yoko Ono, and Little Richard from the You And What Army blog here. The bit about Rolling Stone calling it the second most important event in rock & roll history came from the Globe and Mail here. Some of the quotes about The Plastic Ono Band set were found thanks to the research by John Whelan for the Ottawa Beatles Site here. You can read more about Little Richard's set on JamBands.com here. Writer Reid Dickie shared his memories of the show on his own site here. The screencap the chicken incident came from here. The screencap of Chuck Berry from here. And of John Lennon from here. The photo of the crowd was found thanks to a post by thecharioteer on UrbanToronto here.

Watching Pennebaker's footage, you can see the Royal Conservatory of Music in the distance. It's right next door to Varsity Stadium and, of course, plays it's own important role in the history of Canadian music. According to Wikipedia, former students include Glenn Gould, Oscar Peterson, Gordon Lightfoot, Bruce Cockburn, Randy Bachman (The Guess Who), Emily Haines (Metric), Owen Pallett (Final Fantasy), Richard Reed Perry (Arcade Fire, Belle Orchestre), Tegan and Sara, Sara Slean, Rob Baker (Tragically Hip), Diana Krall, Sarah McLachlan, Shania Twain, Loreena McKennitt, Paul Schaffer, R. Murray Schafer, producer David Foster, Robert Goulet, Jeff Healey, Amanda Marshall and Chantal Kreviazuk. Feist is an Honourary Fellow.

Thursday, November 21, 2013

The Torontonian Roots of Doctor Who — The Canadian Behind The Legendary TV Show

Doctor Who is more than 50 years old. The Guinness Book of World Records calls it the most successful science-fiction series of all-time. It's the longest-running, too. Since it first debuted in 1963, the show has aired nearly 800 episodes, plus specials, spin-offs, movies, radio plays, mini episodes, sketches for charity shows, books, graphic novels... It's an icon of British culture; the London Times called it "quintessential to being British." But if you want to trace the show back to the very, very beginning, to the person who more than any other is credited with the creation of Doctor Who, well, then you have to travel back to Canada, back to downtown Toronto, back to a brand new baby boy born in our city during the First World War.

His name was Sydney Newman. He was born in 1917, to parents who had moved to Canada from Russia. They owned a shoe shop, but their son dreamed of being an artist. As a kid, he went to Ogden Public School (just a block north-east of Queen & Spadina); as a teenager during the Great Depression he studied art and design at Central Tech (on Bathurst just south of Bloor). By the time he was in his early twenties, he was making a good living as a commercial artist, designing movie posters. 

But by his own admission, Newman was a restless sort. He was quickly developing a new passion: film. And his timing was absolutely perfect. In 1939, when Newman was just 21 years old, the National Film Board of Canada was created. The government had commissioned a report that recommended they commission another report that recommended they create the NFB. It was a way of strengthening Canadian culture and promoting national unity by making and distributing uniquely Canadian films, especially documentaries. Newman got in on the ground floor pretty much right away, working as a splicer-boy editing film.

He worked his way up quickly, writing and then directing and then producing. He got to work under John Grierson, a documentary filmmaker from Scotland who had written the government report and co-founded the NFB. He's hailed as "the father of British and Canadian film." With the Second World War breaking out just a few months after the NFB got started, Newman found himself working on the "Canada Carries On" propaganda newsreels that ran in movie theatres before feature films. Eventually, he'd be in charge of the whole series. His work would appear on hundreds of movie screens across the country. During his decade at the NFB, he worked on something like 350 films.

But now, with the war over, an even newer medium was catching on: television. By the late 1940s, some Canadians along the border had already bought their first TV sets to watch the earliest American shows. But we didn't have our own channel yet, so the CBC put together yet another report: this one was a plan to launch their own public television network. As part of the preparations for the launch, the government sent Newman down to New York City. He spent a year observing the various television departments at NBC, sending monthly reports back to Ottawa. "I fell passionately in love with television during my year in New York," he later remembered. He was particularly fascinated by the educational potential.

Sydney Newman at the CBC, 1950s
So when he got back from NYC, he left the NFB and accepted a job at the brand new CBC-TV. He was put in charge of all their outdoor broadcasts. Newman was the guy who put Foster Hewitt and Hockey Night in Canada on TV for the very first time. That same year, he broadcast the very first televised Grey Cup game.

But he would make his biggest splash as the head of the Drama department. He took it over in 1954; by then, CBC-TV was a big deal. Well over half the people in Canada now owned a television set; we had quickly become one of the leading television-producing nations in the world.

Newman, still only 31 years old, got to work implementing his new ideas. He was deeply influenced by his time making documentaries at the NFB, and he passionately believed television shows should try to connect with the lives of the people watching. "Canadians seeing themselves in dramatic situations always seemed to me the best way to get them to watch my programmes," he later said. At a time when a lot of the dramas on television were just classic old plays and novels shot with TV cameras, Newman hired exciting young writers and directors to produce original screenplays. He encouraged them to write about current events, tell stories about the world around them, and to break new ground. "[O]ne always complains about Canada," he said, "...we don't know who were are or where we're going or how we connect up with the USA. Well, I would say the bloody simple way to find out is to let the writers talk about themselves... and Canadians will quickly find out what they are."

By the end of the 1950s, Canada was getting a reputation for being on the cutting edge of the new medium. While Marshall McLuhan was teaching groundbreaking media theory just a few minutes away at the University of Toronto, the producers at the CBC were developing their own new ideas. "We were the only country that had no [pre-existing film or television] tradition," one CBC writer later remembered, "so television was our beginning. We did things on television they didn't do in England or America." The CBC gave them the freedom to experiment and Newman made sure they used it. His Tuesday night show, General Motors Theatre, became a hotbed for new story ideas, camera techniques and young talent.

He hired, for instance, Lister Sinclair, the future host of CBC Radio's Ideas, who had recently been called out in the House of Commons over a radio play he wrote about an unmarried pregnant woman considering an abortion. (The leader of the Conservatives denounced it as "disgraceful" and demanded government action.) Another was Len Peterson; he'd been criticized for daring to write about alienated youth and the erosion of democratic freedoms during the hyper-nationalistic years of the Second World War.

But it was a third playwright, Arthur Hailey, who wrote the biggest hit for General Motors Theatre. It was called Flight Into Danger, a tense thriller about an airplane whose pilots get food poisoning. It starred James Doohan (just a few years before he played Scotty on Star Trek) and it was a HUGE success. One critic called it, "probably the most successful TV play ever written anywhere." Hollywood turned it into a feature film (which was then, in turn, spoofed by Airplane!). The BBC aired the original CBC version, too. In fact, they bought more than two dozen Newman-produced CBC episodes. His shows were grittier, more innovative and more exciting than what the British were doing. And there, at the end of every single one, was Sydney Newman's name.

Flight Into Danger, 1956
So that's how he ended up in England.

The BBC had started their own television network all the way back in the very late 1920s — more than 20 years before the CBC did — and for a long time they had a monopoly on the British airwaves. But now, in the 1950s, they were forced to compete with private broadcasters. It was one of those private channels, ABC, who offered Newman a job. He was happy in Canada — he says he found the television scene here "terribly exciting" — but he just couldn't resist the opportunity.

So he packed his bags and headed off to London to become the head of Drama for ABC. He brought his trademark moustache and bowtie with him — along with his radical, new, Canadian ideas.

"I didn't really like what I saw here [in England] on television," he said. "Most television drama in 1958 — and when I say most, I mean 98% of it — consisted of either dramatization of short stories or a novel, or consisted of hand-me-down theatre plays, which were adapted for television... The theatre has always been a kind of middle class activity... These plays never had any real roots in the mass of the audience."

Or as he put it more bluntly: "Damn the upper classes – they don’t even own televisions!"

As part of his job at ABC, Newman took over a show called Armchair Theatre — sort of the British version of General Motors Theatre — where he again made sure to hire exciting new writers. This time, they were British ones, many of them playwrights who were having trouble establishing themselves in the upper-middle-class world of London's West End theatres. Newman helped launch the early careers of English writers like Harold Pinter, Ken Loach and Alun Owen (who would later write the screenplay for The Beatles' A Hard Day's Night). His writers wrote about issues like race, sexual assault and the potential for a nuclear holocaust. And the work they produced for Newman at ABC met with the same kind of popular acclaim he had achieved with the CBC.

"They were locals," Newman explained. "They were ordinary people... they wrote about the country that they knew... We discovered that the audiences were just eating this stuff up. And in retrospect, looking back, the audience loved the plays because the plays were about them, not about some elegant people in drawing rooms... They were plays, really, about the working class. And for the first time in England, the working class was being presented not as comic foil."

Newman & Kotcheff, CBC, 1956
Newman liked to call this kind of TV show "theatre of the people," but the programs would become better known as "kitchen sink dramas."

And it wasn't just the writers. Newman brought some Canadian directors with him to England. People like Ted Kotcheff (a Torontonian who would later direct The Apprenticeship of Duddy Kravitz and Weekend At Bernie's) experimented with new camera techniques. Instead of boring, static shots, they adopted a more cinematic style, including hand-held camerawork and more frequent close-ups. Newman used those Canadian directors along with young British directors who were interested in the same kind of innovation. "We wanted to push against the limitations of the medium," Kotcheff remembered, "to approach the freedom of film, and not to enslave it to the theatrical tradition in which we found it when we arrived..."

Meanwhile, Newman used the talent he assembled to create a slate of brand new shows. His biggest hit with ABC was an adventure thriller capitalizing on the public's obsession with spies during those early years of the Cold War. It starred one of the British actors Newman had regularly used back in Toronto. It was called The Avengers. It would prove to be one of the most famous television shows ever. But that was nothing. Newman had an even bigger hit coming.

In 1962, he left ABC for the BBC. Now, he would be the head of their Drama department. And the new boss wanted him to mix things up.

"Syd brought this breath of fresh air into the stuffiness of the BBC," one of his colleagues later remembered. "With all its invention and all its wonderful storytelling, the BBC had been very stuffy... I don't think Syd had read Dickens. He certainly hadn't read Thackery. And as for Jane Austin, I mean, it was absolutely dead meat as far as he was concerned. He wanted something new."

One of his first challenges was to fix a slot in the BBC's Saturday afternoon schedule. They already had two big Saturday afternoon hits: Grandstand (a sports show) and Juke Box Jury (a pop music show). But right between them, at tea time, the ratings took a dive. The BBC had been airing a serial of classics, stuff like adapted Dickens novels. People were tuning out. Newman wanted to replace it with a new show of original material that would still educate and inform, but also appeal to the younger viewers who were already watching the other two shows.

He decided the perfect solution was a science-fiction show for kids.

Back when he was growing up in Toronto, Newman had been a big fan of science-fiction. And he still was. "[U]p to the age of 40," he said, "I don't think there was a science-fiction book I hadn't read. I love them because they're a marvellous way—and a safe way, I might add—of saying nasty things about our own society."

Pathfinders in Space, 1960
When he was at ABC, he had produced a science fiction trilogy called Pathfinders. And back when he was at the CBC, they'd done a Canadian version of the Howdy Doody puppet show with a science fiction twist: a character called Mr. X who taught kids about history and science by travelling through space and time in his Whatsis Box. (Mr. X didn't last long; parents complained he was too scary.)

The BBC was no stranger to science-fiction either. They had already done a bunch of shows with a sci-fi theme, stretching all the way back to some of their earliest programming. In fact, earlier the same year Newman joined the staff, the BBC compiled a pair of reports exploring the idea of a new science-fiction show.

So that's how Doctor Who started: with a meeting in an office at the BBC during the spring of 1963. Newman brought the authors of the science-fiction reports together with screenwriters from the old Drama and Children's departments (which Newman had now merged). It was the first in a series of brainstorming sessions over the course of the next few months, which produced a series of story ideas and character sketches that gradually coalesced into Doctor Who. A whole team contributed ideas, but it's Newman who generally gets credit for the core of them, from the name of the show to the basic premise. "The idea of Doctor Who," he later explained, "...was basically a senile old man, of 720 years or 60 years of age, who has escaped from a distant planet in a spaceship. And the spaceship had the capacity to go forward and backward in time."

Newman insisted the show had to be educational — about science and history — and that, even if the premise was extraordinary, it still had to connect with the ordinary lives of the people watching. He nixed the idea of making the main characters scientists (they wouldn't need to learn as much), proposed the cast should include a teenaged girl (who young people could identify with) and when the writers suggested the time machine should be invisible, Newman argued it should present a striking visual image instead. In the end, the Doctor's first companions would be a science teacher, a history teacher and his own teenaged grand-daughter, while the TARDIS time machine would take the form of an iconic blue police box — a familiar sight to English viewers in 1963.

But while Newman might have played a leading role in the creation Doctor Who, he wasn't going to produce it or direct himself. So, as usual, he set about finding the most exciting, young, innovative talent he could find.

Verity Lambert
First up: producer. "I didn't feel I had anyone on the staff who seemed right for the kind of idiocy and fun and yet serious underlying intent," Newman said. So he called up his old production assistant at ABC and offered her a promotion. Verity Lambert was just 27 years old when she became the producer of Doctor Who. At the time, she was the youngest producer in the Drama department and the only female producer at the BBC.

Meanwhile, the director for the first episode would be Waris Hussein. He was even younger: just 24, a recent graduate of Cambridge, where he'd worked with student actors like Derek Jacobi and Ian McKellan. He, like all of Newman's favourite directors, was interested in bringing a more cinematic style to television. And he, too, was breaking new ground: the very first Indian-born director to work for the BBC.

But as talented as they were, shooting that first episode would prove to be a major challenge for Lambert and Hussein. The BBC executives above Newman weren't completely sold on the show. They threatened to cancel it before a single episode had aired. The production team was forced to make do with a small budget despite their need to create entire alien worlds, historical costumes and the elaborate interior of the TARDIS. They were also forced to shoot on a sound stage so old it was nearly obsolete: Studio D at Lime Grove, a long, thin room which didn't give them much space at all. They couldn't even fit the police box in the elevator. "It was so old-fashioned, it didn't even have a lighting console," Lambert remembered in later interviews, "...It was like going into a studio that had come out of Noah's Ark... It was horrendous. If it got too hot, the sprinklers would turn on."

Their first attempt at shooting the first episode — in which the Doctor and his companions travel back to the Stone Age — was a disaster. The Doctor wasn't funny enough. The grand-daughter was too strange. Hussein had been too ambitious with his cinematic camerawork; the early TV cameras were just too clunky and heavy to pull it off. One of the actors remembered the day they screened the episode for Newman: "There was a long silence. And then Sydney got up and just said, 'Do it again, Waris.'"

Newman took Lambert and Hussein out to a Chinese restaurant in Kensington High Street to explain just how bad it was. "By rights I should be firing both of you," he told them, according to Hussein. But he believed in their talent and was willing to give them a second chance. Decades later, Hussein is still grateful: "For Sydney to put himself on the line makes him into somebody who, as far as I'm concerned, is a hero."

Their second attempt at filming the first episode went much better. The night before it was supposed to air they were already working on the filming of a second storyline. It was November 22, 1963. That date is better remembered for another reason.

The First Doctor, William Hartnell
Carole Ann Ford, who played the Doctor's grand-daughter Susan, was waiting for the elevator on her way up to the studio when she heard the news: John F. Kennedy had been shot. "I'll never actually understand how we got through it," she remembered, "because it was a very, very shocking thing... I was shaking. I thought, 'I'm never going to be able to do this.' ... I think I was trying not to cry, actually; I think we were all like that."

No matter how good it was, the premiere of Doctor Who was doomed to be overshadowed by the death of JFK. When the first episode aired the next day, it was slightly delayed in order to broadcast more news about the assassination. And the public just wasn't in the mood for time-travelling adventure. The BBC decided to the air the first episode again the very next week, but at the end of the first serial — four episodes based on the Stone Age story — the show's ratings were average at best. The BBC was going to need more convincing.

They say it was the Daleks who saved Doctor Who. The Doctor's arch-nemeses both terrified and thrilled children: their creepy robotic voices; their bone-chilling "Exterminate!" catchphrase; the aesthetics of a lethal salt and pepper shaker armed with a toilet plunger and a ray gun. The aliens who felt no emotion but hate were a hit as soon as they appeared for the very first time in the show's second serial. By the end of that storyline, there were more than 10 million people watching Doctor Who. Dalekmania had arrived.

Sydney Newman didn't like the Daleks. He agreed with one of the BBC reports when it said the show should avoid the use of "bug-eyed monsters." Newman called it "the cheapest form of science-fiction." But as you might expect from a 50 year-old show whose main character has been played in a dozen different forms by a dozen different actors, Doctor Who can't be reduced to the vision of one person. It quickly took on a life of its own. Those bug-eyed monsters became a staple of the show's format and a large part of its appeal, sending generations of delightfully terrified children scrambling to watch the action from behind the safety of their sofas.

But even half a century later, the use of those alien monsters still reflects the values Newman brought to the show when it first started. They're about more than just cheap scares; they're a learning opportunity. They give the Doctor a chance to demonstrate his respect for others and his belief that violence should be used only as the very last resort. He prefers to use his brain to solve problems. He's willing to risk his own life in order to open a dialogue with those bug-eyed monsters who, more often than not, turn out to have perfectly logical motives. Even if they're not always good ones.

"The Dalek Invasion of Earth," 1964
Those ideas about peace-making and peace-keeping had a new weight in the wake of the horrors of the Second World War. In fact, at the time Newman left Toronto, they were helping to forge a new Canadian national identity. The year before Newman's departure, future Canadian Prime Minister Lester B. Pearson had won the Nobel Peace Prize for being the champion of the brand new idea of United Nations peacekeeping. The idea quickly became a central part of the Canadian identity.

It was also, at the very same time, helping to reshape the British national identity. Pearson's peacekeepers were a response to British and French military aggression during the Suez Crisis in the Middle East. The Crisis was, for many Britons, a sign the Empire was not only over, but immoral. The BBC played an important role, clashing with the Conservative Prime Minster who wanted to muzzle opposition, pressuring the public broadcaster to support the government's position. It became a defining moment in the history of the BBC.

So it's not surprising a Canadian in the early 1960s would create a TV show reflecting something of a Pearsonian worldview — or that upon his arrival at the BBC, he would find plenty of people who agreed. Within a few years, in fact, Doctor Who had made the United Nations a major part of the show's storyline. And even today, the modern version of the series echoes the lessons learned in those dark days: the Doctor is haunted by the horrors of a recent Time War between his own people and the Daleks, and he's troubled by his own role in the violence.

Newman would continue on with the BBC until the late '60s — he was still there when the show made its next genius leap forward: the idea of "regeneration." It allowed them to replace the aging actor who played the First Doctor, William Hartnell, with a new actor playing a new twist on the same old character. It gave the show a built-in way of evolving over time, connecting with successive generations of viewers, and helping to ensure that it would still be a huge hit long after Newman and all the other original creators of the show had moved on. 

And for Newman, that time would come sooner rather than later. After he left the BBC, he stayed in England to make feature films for a while, but he didn't find much success with it. Besides, he missed Toronto.

"I am eternally interested in going back to Canada," he told one interviewer, "...it is my country. I mean, just the sheer thought of Yonge & College streets sends shivers... I can't wait to see the Toronto City Hall. I can't wait to go to Georgian Bay. It's my country. And there's something deep about this. It's corny and it's junior Chamber of Commerce stuff, but it's me."

Finally, after a decade in England, Newman headed back home to Toronto. London's Sunday Times mourned the loss. "Sydney Newman flew back to Canada yesterday, and British television will never be quite the same again. Arguably the most significant individual in the development of British television drama and a central architect of Canadian television in the fifties."

But the Canadian television scene he came back to wasn't quite the same as the one he'd left behind. The CBC had drastically slashed their drama department, prompting an exodus of Canadian talent. Homegrown writers, directors and actors all decided they would be better off in England or the United States. Newman called it, "a tremendous loss to... the consciousness of the nation... a tragedy for the country as a whole."

Student FLQ rally, Montreal
Instead of heading back to the CBC, Newman took a job as the head of the NFB. But it, too, was an organization in turmoil. This was 1970: the height of the separatist terrorist attacks by the FLQ. The desire to separate from the rest of Canada had reached a boiling point in Québec: there were riots, bombs going off, kidnappings of diplomats and politicians. Two months after Newman returned to the NFB, the FLQ murdered a cabinet minister. The Prime Minster temporarily declared martial law in Québec. Newman — who didn't even speak French — spent a lot of his time at the NFB clashing with separatists inside the organization. He claimed Québecois filmmakers were too focused on high-minded politics, ignoring ordinary people. And when Denys Arcand — one of the great Québecois filmmakers, who won an Oscar in 2004 for The Barbarian Invasions — made a documentary for the NFB that included two members of the FLQ calling for armed revolution, Newman kept it from being released. He was denounced for censorship. The FLQ even considered him as a target for kidnapping.

Meanwhile, the greatest success of his career wasn't even being aired in Canada. The CBC had shown the first 26 episodes of Doctor Who, but then stopped. Canadians wouldn't be able to watch it on TV again until the late 1970s, when TV Ontario finally picked it up for good. They even added to the educational angle of the show: an intro or wrap-up put each episode in its scientific or historical context, hosted at first by a futurist U of T professor and then Torontonian science-fiction writer Judith Merril.

Sadly, by the late 1980s, the show's popularity was slipping even at home in England. On Saturday afternoons, it was forced to complete with Mr. T in the wildly popular American show The A-Team; when it got moved to Mondays, it was up against the mother of all British kitchen sink dramas: Coronation Street. Doctor Who was almost cancelled in 1986, survived and then got cancelled for real. Newman had some meetings with the BBC in an attempt to save it and take over as producer, but he didn't get along with the network's new management. For more than a decade, the BBC didn't make any new episodes of Doctor Who. A full-length movie by FOX, featuring a new Doctor in an American setting, was meant to spark new interest and a new series, but it didn't work. It looked like Newman's greatest triumph was finally, completely dead.

The Eleventh Doctor, Matt Smith
But not for long. A new generation of BBC executives and producers realized what they'd lost. In 2005, Doctor Who came back with a new Doctor, a new companion, a new look, and all the old villains. This time the CBC played a more direct role. They aired the new series right from the very beginning — even accidentally allowed a leak of the first episode before it aired — and then co-produced the next two seasons. Canada had invested public funds in the career of the show's creator and now Canada invested public funds in order to help the show regain its position as one of the most popular dramas on TV. The reboot has been shown every week in more than 50 countries. The biggest episodes are seen by more than 10 million viewers in the UK alone. And there's not a single drama on television that gets a better appreciation rating from viewers. Half a century after the TARDIS first materialized at Studio D in Lime Grove, Sydney Newman's greatest triumph is quite literally the most loved drama on television.

-----

Tonight the BBC airs a drama all about Newman, Lambert, Hussein and the making of Doctor Who: An Adventure In Space and Time. This Saturday, they air the big 50th anniversary special. I could not possibly be more excited. #OMFG It's also being shown in theatres on Saturday and on Monday, though Saturday is already sold out. Cineplex has all the deets here.

I'll be writing about the new episode at the Little Red Umbrella, where I've already got posts up about the recent mini episode and pretty much all of last season. You can check that all out here.

Newman and Lambert have both been referenced a couple of times in the new version of the series. There's a character in one episode called Verity Newman; in another, in which the Doctor forgets who he is and think he's human, he gives his parents' names are Sydney and Verity.

There's a whole documentary about the origins of Doctor Who called, appropriately enough, Doctor Who: Origins. There's another one, too, called The Story of Doctor Who. They're both great. The BBC also did a radio program all about he creation of the show recently, which you can stream online here. And they have a whole website dedicated to the creation of the show, including all those early reports and character sketches. They also have an article about one of the documents here.

Jamie Bradburn has the full story of Flight Into Danger and "The Adventures of Sydney Newman" in a post for Torontoist here. Sydney Newman gave a long interview to the CBC in 1966, while he was still with the BBC, which is where some of the quotes in my post come from. You can watch it online thanks to the CBC archives here. The Museum of Broadcast Communications has a webpage about him here. The Canadian Film Encyclopedia has one here. The British Film Institute has another one here. He's also featured a bit in the book Rewind & Search which you can, in part, online thanks to Google Books here. And in When Television Was Young here. His Wikipedia page is here.

Sydney Newman interestingly enough, was also the first person to Marshall McLuhan on TV, as part of a series on University of Toronto professors which you can learn a little bit more about here.

Newman died of a heart attack in 1997. He lived in Governor's Bridge, just north of the Brickworks. When he passed away, the Guardian declared, ""For ten brief but glorious years, Sydney Newman... was the most important impresario in Britain... His death marks not just the end of an era but the laying to rest of a whole philosophy of popular art."

Verity Lambert has also passed away. The Independent shares more about her story in her obituary here. She would eventually run her own Drama department at Thames Television. Sad they're not both still here to enjoy the show's 50th anniversary.

You can watch a couple of Sydney Newman's WWII propaganda films here and here. The Canadian Film Encyclopedia has more about the entire "Canada Carries On" series here. You can learn more about the founding of the NFB here. And about the NFB in general from the book In The National Interest: A Chronicle of the National Film Board of Canada which is, in part, online thanks to Google Books here. The Canadian Encyclopedia shares the history of the CBC here. You can learn more about General Motors Theatre here. And about Lister Sinclair's controversial abortion CBC radio play here. Wikipedia has a bit about the Canadian version of Howdy Doody here. And there's a blog with a little bit more about it here.

There are a bunch of Canadian Doctor Who fan sites. In fact, the Canadian fan club offshoot of the original British fan club — The Doctor Who Appreciation Society — is the longest-running Whovian fan club in North America. 33 years old this year. They're called the Doctor Who Information Network. There's a terribly popular podcast, too: Radio Free Skaro. And countless blogs and Tumblrs, as well as reference sites like The Doctor Who Reference Guide and Doctor Who: A Brief History of Time (Travel).

You can learn more about the BBC and the Suez Crisis in this PDF from the BBC.

You can learn more about the Torontonian director of Weekend At Bernie's, Ted Kotcheff, here.

Oh and here's an interesting comment from Sylvester McCoy, who played the Seventh Doctor, linking the Daleks to that sense of historical militarism: "I think Doctor Who played a lot on the fears we were growing up with. You know, the Daleks were kind of like fascistic. Those images of tanks in the First World War coming over, a Dalek looks like one of those in a way."

I also wanted to include something about the amazing original theme song and title sequence, both done with cutting edge experimental technology by 1960s standards. The BBC Radiophonic Workshop put the music together using tape loops, piano strings, oscillators and filters. The TARDIS sound comes from scrapping keys along piano strings. Soooooo nerdily cool.

Alright, that's it. I'm done.